Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.9 LAccepted-AOC | ₹27.9 L Quoted ₹29.8 L | L1 | Accepted-AOC Being Lowest |
| 2 | L2₹40.7 L+₹10.9 L (36.7%)Rejected-Finance | ₹40.7 L+₹10.9 L (36.7%) | L2 | Rejected-Finance Being other than Lowest |
| 3 | L3₹42.1 L+₹12.3 L (41.4%)Rejected-Finance SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | ₹42.1 L+₹12.3 L (41.4%) | L3 | Rejected-Finance Being other than Lowest |
| 4 | Rejected-Technical 203 204 SKYLINE WEALTH SPACE PREMIERROAD VIDYAVIHAR W MUMBAI MAHARASHTRA 400086 | MUMBAI SUBURBAN | MAHARASHTRA | 400086 | - | - | Rejected-Technical Not meeting elgibility criterea as per documents submitted |
Tender Value
Refer Docs
Closing Date
27 Mar 2021, 6:00 pmClosed
CWE NW MUMBAI
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar ColabaMumbai 05
REPAIRS AND REPLACEMENT OF AHUS FCUS INCLUDING AHU PANEL PUMPS CHILLED WATER PIPE LINE INCLUDING INSULATION OF CENTRAL AC PLANT AT INHS ASVINI UNDER AGE (I) ASVINI COLABA MUMBAI
2021_MES_423880_1
8080/CWE(NW)MUMBAI/E8
Open Tender
Civil Works
Item Rate
360 days
AGE (I) Asvini
Class D and above
7 documents required · 7 mandatory
₹500
Yes
AGE (I) Asvini
Exempted
15 May 2021
19 Feb 2021
29 Mar 2021
19 Feb 2021
27 Mar 2021
15 Mar 2021
19 Feb 2021 - 15 Mar 2021
Amount
Taking out old unserviceable AHU body & supply and fixing of factory fabricated double skinned powder coated GI frame of 21 gauge, 25 mm thick CFC puf insulated for AHU body including proper door handles, corner supports cutting, bending, welding/ brazing/ wooden work/ structural support complete all as specified and directed by Engineer-in-Charge
Material & labour for anodised aluminium frames for AHU Panel with one or more rebates, welding, jointing cleats for fixing etc, including dismantling of old anodised aluminium frames, complete all as specified and directed
Supply and fix in repairs AHU cooling coil of any size and any rows as per existing at site complete all as specified and directed by Engineer-in-Charge
Supply and fix in repairs humidity control set including heater strips and complete connecting wiring suitable for cut out system as per existing at site
Supply & fix in repairs dry and wet bulb thermo meter. Make- Dimple or equivalent
Taking down old unserviable diffusers / grill and supply and fix new supply of air diffusers / grill made of aluminum powder coated with damper as per existing size .
Taking down old unserviable Fire damper and supply and fix new Fire damper made out of GI sheet 16 G with fusible plug as per existing size
Supply, lay and welding MS pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc. of size 100 mm dia including taking down old existing MS pipe complete all as specified and directed
Supply, lay and welding MS pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc. of size 80 mm dia including taking down old existing MS pipe complete all as specified and directed
Supply, lay and welding MS pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc. of size 65 mm dia including taking down old existing MS pipe complete all as specified and directed
Supply, lay and welding MS pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc. of size 50mm dia including taking down old existing MS pipe complete all as specified and directed
Supply, lay and welding MS pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc. of size 40mm dia including taking down old existing MS pipe complete all as specified and directed
Supply, lay and welding MS pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc. of size 32mm dia including taking down old existing MS pipe complete all as specified and directed
Supply, lay and welding MS pipes heavy grade with all fittings laid in floors or fixed to walls and ceilings etc. of size 25mm dia including taking down old existing MS pipe complete all as specified and directed
Taking down old unserviceable AHU pipe line insulation, cleaning the surface with steel brush to remove dirt,dust and make it free of scale, greases and foreign matter and supply and fix nitrile rubber insulation (Armaflex) of one layer of 19mm thickness sticking on surface of AHU pipe line by using approved adhesive and sealing the joints by weather proof tape on the pipe up to 80mm dia complete all as specified and directed by Engineer-in-Charge.
Taking down old unserviceable AHU pipe line insulation, cleaning the surface with steel brush to remove dirt,dust and make it free of scale, greases and foreign matter and supply and fix nitrile rubber insulation (Armaflex) of one layer of 19mm thickness sticking on surface of AHU pipe line by using approved adhesive and sealing the joints by weather proof tape on the pipe up to 65mm dia complete all as specified and directed by Engineer-in-Charge.
Taking down old unserviceable AHU pipe line insulation, cleaning the surface with steel brush to remove dirt,dust and make it free of scale, greases and foreign matter and supply and fix nitrile rubber insulation (Armaflex) of one layer of 19mm thickness sticking on surface of AHU pipe line by using approved adhesive and sealing the joints by weather proof tape on the pipe up to 50mm dia complete all as specified and directed by Engineer-in-Charge.
Taking down old unserviceable AHU pipe line insulation, cleaning the surface with steel brush to remove dirt,dust and make it free of scale, greases and foreign matter and supply and fix nitrile rubber insulation (Armaflex) of one layer of 19mm thickness sticking on surface of AHU pipe line by using approved adhesive and sealing the joints by weather proof tape on the pipe up to 40mm dia complete all as specified and directed by Engineer-in-Charge.
Taking down old unserviceable AHU pipe line insulation, cleaning the surface with steel brush to remove dirt,dust and make it free of scale, greases and foreign matter and supply and fix nitrile rubber insulation (Armaflex) of one layer of 19mm thickness sticking on surface of AHU pipe line by using approved adhesive and sealing the joints by weather proof tape on the pipe up to 32mm dia complete all as specified and directed by Engineer-in-Charge.
Taking down old unserviceable AHU pipe line insulation, cleaning the surface with steel brush to remove dirt,dust and make it free of scale, greases and foreign matter and supply and fix nitrile rubber insulation (Armaflex) of one layer of 19mm thickness sticking on surface of AHU pipe line by using approved adhesive and sealing the joints by weather proof tape on the pipe up to 25mm dia complete all as specified and directed by Engineer-in-Charge.
Taking down old unserviceable/deteriorated insulation from duct, cleaning the duct surface with steel brush to remove dirt, dust and make it free of scale, greases and foreign matter etc and supply and fix nitrile rubber insulation(Armaflex) one layer of 19mm thickness sticking on surface of duct by using approved adhesive and sealing the joints by weather proof tape complete all as directed by Engineer-in-Charge.
Supply and fix in repairs CI Butter fly valve slim seal design with nitrile rubber lined seal with clutch lever (P10 or PN 16) of size 100 mm bore complete all as specified and directed by Engineer-in-Charge.
Supply and fix in repairs CI Butter fly valve slim seal design with nitrile rubber lined seal with clutch lever (P10 or PN 16) of size 80 mm bore complete all as specified and directed by Engineer-in-Charge.
Supply and fix in repairs CI Butter fly valve slim seal design with nitrile rubber lined seal with clutch lever (P10 or PN 16) of size 65 mm bore complete all as specified and directed by Engineer-in-Charge.
Supply and fix in repairs CI Butter fly valve slim seal design with nitrile rubber lined seal with clutch lever (P10 or PN 16) of size 50 mm bore complete all as specified and directed by Engineer-in-Charge.
Supply and fix in repairs blower set including drum and shaft along with anti-vibration spring isolators for minimizing vibrations(Blow/draw through type) as per the existing size and suitable for size RDH 350- 450 CFM of the AHU/FCU/RU unit all as specified and directed by Engineer-in-Charge.
Supply and fix in repairs blower set including drum and shaft along with anti-vibration spring isolators for minimizing vibrations (Blow/draw through type) as per the existing size and suitable for size RDH 450-500 CFM of the AHU/FCU/RU unit all as specified and directed by Engineer-in-Charge.
Supply and fix in repairs double groove V belt pulley of various sizes including boring and making key slots as per site requirement and directed by Engineer-in-Charge.
Taking down old unserviceble drain pan of cooling coil from AHU box and supply and fix new condensate drain pan fabricated from 1 mm thick SS304 wider drain pan with differential slope assures quick and complete water drainage, thus avoiding migration of moisture, which is the major cause of microbiological growth including cutting welding/ brazing complete all as per site requirement and directed by Engineer-in-Charge
Supply and fix in repairs volume control damper made out of galvanized iron or anodized aluminium with overlapping leafs to avoid any leakage from the damper suitable for AHU as per existing at site complete all as directed by Engineer-in-Charge
Supply and fix in repairs manual operated SA damper made out of anodized aluminium with overlapping leafs to avoid any leakage from the damper suitable for AHU as per existing at site complete all as directed by Engineer-in-Charge
Supply and fix in repairs leather type canvas in AHU duct of any size as per existing at site
Material and labour for framed work with structural steel sections including nuts, bolts,washers, welding ,bending cold or hot, drilling holes for bolts, in any shape or size as directed including applying two coats of synthetic enamel paint over a coat of red oxide zinc chrome primer including dismanlinting steel structural complete all as specified.
Dismantling carefully complete AHU box panels aluminium structures including fine and pre filters, filter section,return and supply air handling ducts of motor blower including drum, structural steel supports, V belts, chilled water coil drain pan, pulley, cooling coil, inlet and outlet chilled water pipe line, burtterfly valves, drain line, AHU drain pan , inlet and outlet canvas connection and reassembling carefully by replacing all old bearings of motor blowers, V groove pulley, canvas, belts, motor paddles, all hardwares and reshape the pipe lines as per requirement all as per existing at site complete all as specified and directed by Engineer-in-Charge
Supply and fix GI filter frame section 18 gauge for fine filters and refixing all filters as per existing site, including dismantling old GI frame section and directed by Engineer-in-Charge
Supply and fix in repairs including testing of pressure guage suitable for chilled water pipe lines in AHU including all accessories complete all as specified. Make :- Fiebig or equivalent as approved by GE
Supply,fabricate and erection of GI sheet 16 gauge base frame for AHU unit including all accessories such as corner, carriage bolt hangers, gasket and appropriate sealant on longitudnal joints etc. including dismantling old GI sheets, complete all as directed & specified by Engineer-in-Charge.
Taking down old unserviable Fan Coil Unit and Supply and Fix Fan Coil Unit with cooling coil made out of copper tubes with finned aluminium any row upto 7. 5 TR capacity, reconnecting inlet and outlet chilled water connection, drainage connections and testing for leak test and reconnecting, welding etc and testing on required load complete all as specified and directed by Engineer-in-Charge.
Taking down old unserviceable AHU pre filter and Supply and fix new pre filters efficiency 90% down to particular size of 10 micron double knitted twisted polymer fabric (washable) rated with press drop of 6 mm WC, including aluminium anodized frame work of 16 SWG to be mounted in AHU filter assembly size as per existing. Make: ASPAWYMAN/DYNA/MHP as approved by GE
Disconnecting and taking out 100 HP electric motor from installed position and opening the complete motor, removing the complete burnt out winding wires of the motor and cleaning with cleaning element, preparing the surface and rewinding with super enamelled suitable size ( as per existing) copper winding wire, filling of slot with insulating materials like paper, fibre sleeves, tape according to classification of motor and also varnishing, heating complete all as specified and as per manufacturers instructions including installing back in original position after repairs, connecting the power supply, drive system and testing on load for continuous 08 hours to the entire satisfaction of Engineer-in-Charge all as specified .
Disconnecting and taking out 40 HP condenser motor from installed position and opening the complete motor, removing the complete burnt out winding wires of the motor and cleaning with cleaning element, preparing the surface and rewinding with super enamelled suitable size ( as per existing) copper winding wire, filling of slot with insulating materials like paper, fibre sleeves, tape according to classification of motor and also varnishing, heating complete all as specified and as per manufacturers instructions including installing back in original position after repairs, connecting the power supply, drive system and testing on load for continuous 08 hours to the entire satisfaction of Engineer-in-Charge all as specified .
Disconnecting and taking out 20 HP AHU motor from installed position and opening the complete motor, removing the complete burnt out winding wires of the motor and cleaning with cleaning element, preparing the surface and rewinding with super enamelled suitable size ( as per existing) copper winding wire, filling of slot with insulating materials like paper, fibre sleeves, tape according to classification of motor and also varnishing, heating complete all as specified and as per manufacturers instructions including installing back in original position after repairs, connecting the power supply, drive system and testing on load for continuous 08 hours to the entire satisfaction of Engineer-in-Charge all as specified .
Disconnecting and taking out 15 HP AHU motor from installed position and opening the complete motor, removing the complete burnt out winding wires of the motor and cleaning with cleaning element, preparing the surface and rewinding with super enamelled suitable size ( as per existing) copper winding wire, filling of slot with insulating materials like paper, fibre sleeves, tape according to classification of motor and also varnishing, heating complete all as specified and as per manufacturers instructions including installing back in original position after repairs, connecting the power supply, drive system and testing on load for continuous 08 hours to the entire satisfaction of Engineer-in-Charge all as specified .
Disconnecting and taking out 10 HP AHU motor from installed position and opening the complete motor, removing the complete burnt out winding wires of the motor and cleaning with cleaning element, preparing the surface and rewinding with super enamelled suitable size ( as per existing) copper winding wire, filling of slot with insulating materials like paper, fibre sleeves, tape according to classification of motor and also varnishing, heating complete all as specified and as per manufacturers instructions including installing back in original position after repairs, connecting the power supply, drive system and testing on load for continuous 08 hours to the entire satisfaction of Engineer-in-Charge all as specified .
Disconnecting and taking out 7.5 HP AHU motor from installed position and opening the complete motor, removing the complete burnt out winding wires of the motor and cleaning with cleaning element, preparing the surface and rewinding with super enamelled suitable size ( as per existing) copper winding wire, filling of slot with insulating materials like paper, fibre sleeves, tape according to classification of motor and also varnishing, heating complete all as specified and as per manufacturers instructions including installing back in original position after repairs, connecting the power supply, drive system and testing on load for continuous 08 hours to the entire satisfaction of Engineer-in-Charge all as specified .
Disconnecting and taking out 5 HP AHU motor from installed position and opening the complete motor, removing the complete burnt out winding wires of the motor and cleaning with cleaning element, preparing the surface and rewinding with super enamelled suitable size ( as per existing) copper winding wire, filling of slot with insulating materials like paper, fibre sleeves, tape according to classification of motor and also varnishing, heating complete all as specified and as per manufacturers instructions including installing back in original position after repairs, connecting the power supply, drive system and testing on load for continuous 08 hours to the entire satisfaction of Engineer-in-Charge all as specified .
Taking down old unserviceable duct insulation, cleaning the duct surface with steel brush remove dirt/dust and make it free of mill scale , greases and foreign matter.Material & labour for painting the surface with two coats of bituminous paint taking spl care over non galvanised part, applying rubber based adhesive CRPX compound manufacted by Shaimar tar product on ducts sticking the fiber glass wool section in the form of pad with the density 24 Kg/Cum shall be fixed tightly to the surface & all joints to be sealed properly by using sealing compound,cover with aluminium foil kraft paper, laminate with minimum overlap of 50mm, seal each lap joint with self adhesive aluminium foil tape 50mm wide, all as directed by Engineer-in-Charge.
Supply & fix in repairs wire netting of galvanised steel wire 24 guage fixed with tinned tacks of wire staples mesh size 12mm aparture over entire duct insulation with 50mm overlap for preventing rat bites
Material & labour for Cleaning of Air handling ducts (GI/Al) internally by using special T&P like robortic arm, air compressor, air jet nozzles, flipper, vaccum pump and a suction blower with hepa filter and check before and after the cleaning all as directed by the Engineer-in-Charge
Taking down GI/Al or any other type of false ceiling and refixing the same after completion of work all as directed by Engineer-in-Charge
Repairs/ Routine maintenance of VRF plants of Blue star make of following capacity round the clock including maintaining the plants twenty four hours for desired temperature of 21+/-3 degree celcius without interuption including repairs/ replacement of damaged/ unserviceable minor parts, controlling valves, copper tubings, nitrile rubber insulation, and all electrical/ electronics components, control wirings, sensors,Thermistors, thermocol inner packs,indoor/ outdoor fan motor windings, vibration pads, painting of rusted out door stands and connected accessories, drainage lines, pre filters control/ communication wirings,earthings, leak test and all other accessories not mentioned in this schedule. (a) Out door unit of capacity 7HP -3 Nos. (b) Out door unit of capacity 10HP - 6 Nos. (c) Out door unit of capacity 12HP - 2 Nos. (d) Out door unit of capacity 14HP - 1 No. (e) Out door unit of capacity 16HP - 5 Nos. (f) Four way Way casette type indoor Unit of any capacity (Model Capacity PLFYP80VBM-E to PLFYP125VBM-E) -15 units. (g) Split hi wall type indoor unit of any capacity -90 Nos .
Note:- For item No 51 above (a) AC Mechanic have to attend local Maint complaint register, Minor faults, routine cleaning, Dry servicing of plant and filters. Any number of manpower required for carrying out the routine maintenance (Minimum 02 Nos of High skilled Refrigerator Mechanic required at site for servicing and repairs) is deemed to be included in the quoted rates. b) The contractor shall ensure visit of OEM manufacturer Engineer monthly once and report/ serviceability of Out door units and same shall be submitted to this Office. The charges for all OEM procedures are deemed to be included in the quoted rates. The reports of OEM Engineer shall be produced before submitting RARs. (c) AC mechanic must be experienced in VRF Plants and capable for carrying out any type of maintenance or attending breakdown in above mentioned plants. (d) Incase of any breakdown the additional man power if required will be arranged by the contractor without any price adjustment. (e) The cost of replacement of all Minor parts which are not mentioned in schedule shall be deemed to be included in quoted rates Item No 51.
BRITE INDUSTRIES
Shree Ayyappa Engineering
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .