Project Director
DRDA, Theni
Strengthening of road from Lakshmipuram road to govindanagaram-jangalpatti joint road km 0/0-1/6 in Theni Block
2021_RDTN_196612_1
519/2021/D4 DATED 13.02.2021
Open Tender
Civil Works - Roads
Item Rate
180 days
Theni
As per tender document
3 documents required · 3 mandatory
₹0
₹32,000
21 Jun 2021
17 Feb 2021
24 Feb 2021
17 Feb 2021
24 Feb 2021
17 Feb 2021
Amount
Strengthening the road from Lakshmipuram road to Govindanagaram - Jangalpatty joint road Km 0/0-1/6 - in Theni Block
Clearing and grubbing by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300mm girth.
Picking old metalled / BT surface upto 10cm thick as directed by the departmental officers
Earthwork excavation from borrow pits for filling in all classes of soils such as gravelly soil, hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, gravel stone earth and earth mixed with 50% fair sized boulders and hard gravelly
Collection, Supply & Filling of Red Gravel from approved quarry including stacking charges and all other labour charges etc., complete as per standard specification.(100% compaction for side berms)
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Applying TACK COAT over WBM surface at 4Kg of RS-1 Bitumen Emulsion/ 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying premix carpet with seal coat type A, 20mmconsolidated thickness using IRC size machine broken HBG metal 0.18cum of 13.2mm and 0.09cum of machine crushed broken HBG metal of 11.20mm with 14.60kg of bitumen for premixing for 10sqm of premix carpet and 0.09cum0.09cum of 6.70mm IRC size machine broken HBG metal with 9.80kgs of bitumen for sealcoat including cost and conveyance of all materials from approved quarry including the cost of bitumen which will be supplied departmentally and cost will be recovered at the rates specified in the special condition appended herewith and including conveyance bitumen to work spot handling charges for the same at both ends including labour charges for heating the bitumen to required temperature and mixing the required quantity of metal and bitumen using mini hot mix plant conveying the mix by wheel borrow including labour charges for spreading the mix to grades, lines and profile and consolidation with power roller rolling etc., including hire, fuel charges and running charges for mini hot mix plant, power roller rolling etc., including hire, fuel charges and running charges for mini hot mix plant, power roller and all other tools and plants employed &all incidental charges such as barricading, providing danger lights etc., complete complying with standard specification(Payment shall be made for the finished item of work after compaction)No.509&513 of MOST
Provision for HM stone
Provision for KM stone
Provision for sign board
Provision for name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M.SANNASI CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .