Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.0 LAdmitted-Finance | +0.00% | ₹10.0 L | L1 | Admitted-Finance |
| 2 | L2₹10.3 L+₹29,954.98 (3.00%)Admitted-Finance | +3.00% | ₹10.3 L+₹29,954.98 (3.00%) | L2 | Admitted-Finance |
| 3 | L3₹10.4 L+₹39,939.97 (4.00%)Admitted-Finance | +4.00% | ₹10.4 L+₹39,939.97 (4.00%) | L3 | Admitted-Finance |
Tender Value
₹10.0 L
EMD Value
₹9,990
Closing Date
23 Jul 2026, 5:00 pmClosed
Executive Enginner (W) Div Degloor Z.P. Nanded
Executive Enginner (W) Div Degloor Z.P. Nanded
CONSTRACTION OF C.C. ROAD FROM H/O VEANKAT KASHINATH PATIL TO H/O RAJESH DHADEWAR AT. SANGVI(UMAR ) TQ. DEGLOOR.
2026_NANDE_1317821_9
ZPN/WD/DEG/e.TEN02/UEE/26-27
Open Tender
Civil Works
Percentage
180 days
CONSTRACTION OF C.C. ROAD FROM H/O VEANKAT KASHIN
Please refer Tender documents.
5 documents required · 5 mandatory
₹590
₹9,990
14 Aug 2026
16 Jul 2026
24 Jul 2026
16 Jul 2026
23 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)40 mm Metal, By breaking rubble obtained by blasting.(Hand broken). | 1 | CUM | - | - |
| 2 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)40 mm Metal, By breaking rubble obtained by blasting.(Hand broken). | 1 | CUM | - | - |
| 3 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge | - | CUM | - | - |
| 4 | Providing and laying in situ / ready mix cement concrete of M-10 proportion with trap/ granite/ quartzite/ gneiss metal in foundation including necessary form work, compacting and curing etc. complete. (with reversible drum type mixer with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc ) | - | CUM | - | - |
| 5 | Providing and laying in situ / ready mix M-20 cement concrete of trap /granite /quartzite /gneiss metal for approach slab / Rigid pavement including compacting, finishing, curing etc. complete. (excluding reinforcement) (with reversible drum type mixer/ concrete batch mix plant (pan mixer) with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc ), cement 6.40 bags/cumt) | - | CUM | 1 | - |
| 6 | Fixing in position Road Junction/ Informatory Sign Board in ground with C.C.1:4:8 block of 60cm x 60cm x 75cm size including all leads complete. | - | NO | - | - |
| 7 | Laboratory testing charges are not considered in the Rate Abstracts. Where ever required separate item shall be taken in the estimate for material testing charges, on the basis of testing frequency and charges fixed by Vigilance & Quality Control Circle, for the current year and shall form part of tender. testing of material by Quality control and certified quality must be use by contractor. for cc Cube | - | NO | - | - |
| 8 | ROYALTY CHARGES :- Supply of Rubble, Murum, Soil, 60mm./40mm. metal (Hand broken), royalty charges are not included in the rates.[As per Govt. of Maharashtra, Revenue and Forest Departments Gazette No.67 Dt.15 May,2015. States that the royalty charges of Rs.141.34/Cu.M. ) are considered. The surcharge levied on Royalty shall also be payable to the contractor. ROYALTY FOR OTHER MINERALS | 1 | CUM | - | - |
| 9 | ADD 18%FOR GOODS AND SERVICE TAX | - | No | 0.29 | - |
| 10 | ADD for 0.5% Insurance | - | No | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.30 MB
Tendernotice_2.pdf
PDF • 1.13 MB
BOQ_2259018.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .