| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.3 CrAccepted-AOC H NO 1100 SECTOR 3 124001 | ROHTAK | HARYANA | 124001 | ₹5.3 Cr Quoted ₹5.6 Cr | L-1 | Accepted-AOC Ok |
| 2 | L-2₹5.6 Cr+₹3.7 L (0.66%)Rejected-AOC 1804 SECTOR 2 HUDA 124001 | ROHTAK | HARYANA | 124001 | ₹5.6 Cr+₹3.7 L (0.66%) | L-2 | Rejected-AOC Ok |
| 3 | L-3₹5.7 Cr+₹11.7 L (2.10%)Rejected-AOC NOT SPECIFIED | ₹5.7 Cr+₹11.7 L (2.10%) | L-3 | Rejected-AOC Ok |
| 4 | L-4₹5.7 Cr+₹14.7 L (2.63%)Rejected-AOC HOUSE NO 953 SECTOR 23 HUDA BHIWANI TEHSIL AND DISTRICT BHIWANI | BHIWANI | BHIWANI | HARYANA | ₹5.7 Cr+₹14.7 L (2.63%) | L-4 | Rejected-AOC Ok |
| 5 | L-5₹5.9 Cr+₹33.4 L (5.98%)Rejected-AOC 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹5.9 Cr+₹33.4 L (5.98%) | L-5 | Rejected-AOC Ok |
Tender Value
₹4.9 Cr
EMD Value
₹9.7 L
Closing Date
20 Nov 2024, 3:00 pmClosed
ASHWANI SANGWAN
Jhajjar PHED No. 1
Birohar Const. of 1 No. Pump Chamber at water works size i.e. 8.53 x 3.96 Mtrs. Const. of 2 Nos. RCC CWT size i.e. 9.45 x 6.40 Mtrs. Const. of 2 Nos. RCC HLT size i.e. 9.45 x 6.40 Mtrs. Const. of 2 Nos. RCC SS Tank size i.e. 46.64 x 46.64 x 3.04 M
2024_HRY_408754_1
20248398BC0E B556 4B11 AC06 4D394AE38CCF590PUH
Open Tender
Civil Works
Works
600 days
BIROHAR
2 documents required · 2 mandatory
₹15,000
₹9.7 L
Yes
25 Mar 2025
5 Nov 2024
20 Nov 2024
5 Nov 2024
20 Nov 2024
5 Nov 2024
Amount
Supplying, errection, testing and commissioning of Horizontal Motor pumping set for raw water having 12 mtr. as per indicated requirements of discharge in LPM 1300 and power capacity in 7.50 BHP (Make :- KSB, CRI, Kirlosker, Crompton Greeve, Lubi)
Operation and Maintenance of water works for complete scope of work mentioned in the DNIT and of whole existing water supply scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate) complete in all respects as per approved NIT. 1) Operation and maintenance during defect liability period after 3 month trial run period (operation only)
Operation and Maintenance of water works for complete scope of work mentioned in the DNIT and of whole existing water supply scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate) complete in all respects as per approved NIT. 2.)Operation and maintenance for 1st year
Operation and Maintenance of water works for complete scope of work mentioned in the DNIT and of whole existing water supply scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate) complete in all respects as per approved NIT. 3.)Operation and maintenance for 2nd year
Operation and Maintenance of water works for complete scope of work mentioned in the DNIT and of whole existing water supply scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate) complete in all respects as per approved NIT. 4.)Operation and maintenance for 3rd year
Operation and Maintenance of water works for complete scope of work mentioned in the DNIT and of whole existing water supply scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate) complete in all respects as per approved NIT. 5.)Operation and maintenance for 4th year
Operation and Maintenance of water works for complete scope of work mentioned in the DNIT and of whole existing water supply scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate) complete in all respects as per approved NIT. 6.)Operation and maintenance for 5th year
Bidder Name
Amount
Kulbir Singh Contractor (GSTN-06ATZPS6352H1ZW) BID ID -1170238
Narender Singh Contractor (GSTN-06AXBPS0272N1Z8) BID ID -1170309
M/S Jai Hanuman Builder (GSTN-NA) BID ID -1170998
Rajesh Kadiyan Contractor (GSTN-NA) BID ID -1170996
MAHA LAXMI CONSTRUCTION COMPANY (GSTN-NA) BID ID -1171006
Kulbir Singh Contractor (BID ID -1170238)
M/S Jai Hanuman Builder (BID ID -1170998)
Narender Singh Contractor (BID ID -1170309)
Rajesh Kadiyan Contractor (BID ID -1170996)
Kulbir Singh Contractor (BID ID -1170238)
M/S Jai Hanuman Builder (BID ID -1170998)
MAHA LAXMI CONSTRUCTION COMPANY (BID ID -1171006)
Rajesh Kadiyan Contractor (BID ID -1170996)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .