Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 02 ANNEXE 2ND FLOOR RAMACHANDRAPURAM HYDERABAD 500032 INDIA | HYDERABAD | HYDERABAD | TELANGANA | 500032 | Admitted-Finance |
| 2 | Admitted-Finance 0 NARA MEERUT ROAD MUZAFFARNAGAR UTTAR PRADESH 251001 | MUZAFFARNAGAR | UTTAR PRADESH | 251001 | Admitted-Finance |
| 3 | Admitted-Finance 2ND FLOOR DHANRAJ MAHAL CHHATRAPATI SHIVAJI MAHARAJ MARG COLABA MUMBAI MAHARASHTRA 400039 | 400039 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
24 Jun 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SR.GM
EIL GURUGRAM
Steam Generation System for Panipat Refinery Expansion Project (P25) of M/s Indian Oil Corporation Limited (IOCL), India.
2022_REFHQ_146182_2
SG/B269-477-PG-T-7490/21
Open Tender
Lump Sum TurnKey
Works
660 days
AS PER TENDER DOCUMENT.
Please refer Tender documents.
7 documents required · 7 mandatory
Exempted
8 Oct 2022
6 May 2022
27 Jun 2022
6 May 2022
24 Jun 2022
3 Jun 2022
180 days
Amount
LUMPSUM TURNKEY BASIS WITH SINGLE POINT RESPONSIBILITY INCLUDING BUT NOT LIMITED TO THE FOLLOWING ACTIVITIES OF WORKS: Residual Process Design, Detailed Design and Engineering, 3D Modeling, Hazop /Hazid, SIL , preparation and submission of engineering drawings & related documentation including Asbuilt/ Final documentation providing all services and completing the work in all respects as per provision of Bidding Document. Supply of all materials including - procurement services, shop fabrication, third party inspection, expediting, project management, planning, scheduling, monitoring, transportation, all loading and unloading; payable in the Contractor’s country; insurance in Contractor’s scope; all type of freights including ocean freight / air freight and inland freight, custom clearance, all type of handling including port handling, stevedoring, handling at worksite etc., supply of start-up / pre-commissioning / commissioning / mandatory spares,chemicals/consumables/ lubricants (Except Owner supplied chemicals) for first fill and 6 (six) months operation as per tech. specifications. Construction / Erection including loading/unloading of the materials at Contractor’s warehouse, transportation of the materials from Contractor’s workshop / Store to erection site, assembly / sub-assembly of the equipments, erection, installation, testing, Inspection, refrectory, dryout, alkali boilout, pre-commissioning, trial run, commissioning & PGTR, Training to owner personals, handing over to owner inlcluding all disciplines of work and supplly of material as per Tender requirements such as structural, civil, mechanical, piping, electrical, instrumentation, insulation, painting, supply of all accessories and materials for erection / testing; supply of all consumables, providing all construction plants, equipments, special tools and tackles; providing supervisory personnel, tradesman skilled / unskilled labour; insurance in Contractor’s scope; completing all works in all respects as per provisions of Bidding Document. Completion of all works in all respects as per provisions of the Bidding Document and directions of the Engineer-in-Charge, including any other activity of work required to complete the Plant in all respects to make the Plant functional.
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
GUARANTEED PARAMETERS FOR STEAM GENERATION PACKAGE AS PER BIDDING DOCUMENT AND SUBSEQUENT AMENDMENT, IF ANY
Total Guaranteed Fuel (RLNG) consumption for Normal Guarantee Operation
Internal electrical Power consumption in Rotating Equipments as per list given in Annexure-3 of Performance Guarantee and Loading & Penalty criteria (Doc no. B269-477-80-44-LPC-2011) for Normal Guarantee Operation
Description of Work / Item(s)
Amount
Lumpsum price for supply portion for completion of scope of work as per bidding document wich includes following but not limited to: Procurement, supply, Third Party Inspection, Transportation,Port handling, Shop fabrication, Assembly, Testing of all items, equipment’s, Components, Materials, bought out items, Procurement of raw materials and sub-ordered equipment, shop fabrication/assembly, inspection, Charges for Third party inspection agency(TPIA), testing, supply of all commissioning and mandatory spares, consumables, lubricants/ chemicals (Except Owner supplied chemicals) for first fill and 6 (six) months operation as per tech. specifications ,special tools and tackles , receipt, accounting, storing & preservation of materials as required for work as per Bidding Document per Bidding Document requirements
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
Lumpsum price for supply portion for completion of scope of work as per bidding document wich includes following but not limited to: Procurement, supply, Third Party Inspection, Transportation,Port handling, Shop fabrication, Assembly, Testing of all items, equipment’s, Components, Materials, bought out items, Procurement of raw materials and sub-ordered equipment, shop fabrication/assembly, inspection, Charges for Third party inspection agency(TPIA), testing, supply of all commissioning and mandatory spares, consumables, lubricants/ chemicals (Except Owner supplied chemicals) for first fill and 6 (six) months operation as per tech. specifications ,special tools and tackles , receipt, accounting, storing & preservation of materials as required for work as per Bidding Document per Bidding Document requirements
IN FOREIGN CURRENCY
Description of Work / Item(s)
Amount
Lump sum Engineering price for completion of scope of work as per bidding document witch includes following but not limited to: RESIDUAL PROCESS DESIGN , DETAILED ENGINEERING preparation of Datasheets, Smart plant P&IDs, PFDs, specifications for procurement, GAD, & Layouts, 3D Model, Hazop /Hazid, SIL, engineering fabrication drawings, Procurement & Construction schemes, Control Logics, Cause & Effect diagrams, Electrical System studies, Statutory approval from various Statutory state & central Government bodies, approval of drawings &documents from OWNER/EIL, submission of Final Technical documents, AS BUILT Documents and 3D Model, Pre-commissioning, Commissioning and Operating manuals for all units including packages as per Bidding Document requirements)
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
Lump sum price for construction portion as per requirement detailed out in various section of bidding document witch includes following but not limited to: Construction, installation completion of work in all respects for Package including required Cranes, Scaffolding, temporary barricading, Transportation and site handling of material/equipments, supply of consumables, tools and tackles, field engineering services, Receipt, storage, conservation, preservation of FIM and contractor supplied items etc. Fabrication, construction, assembly, erection at site for all piping, civil, structural, architectural, mechanical, electrical and instrumentation works within battery limit, refractory, insulation, coating, painting, testing, etc. providing all temporary works/structures and equipment for completion, obtaining statutory approvals, pre-commissioning, commissioning, performance guarantee test runs, Training to Owner personals, completing all the work in all respects to make system smooth, operable and handing over as per Bidding Document requirements and instructions of the Engineer In Charge
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
TOTAL OF DESIGN , ENGINEERING AND CONSTRUCTION PRICE [1 + 2]
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
GST on supply of Indigenous goods (on SP-01A)
Description of Work / Item(s)
Amount
Basic Customs Duty & other import duties on Supply of Imported Goods other than those mentioned below (Foreign Component of SP-01B)
SWS on Duties quoted at S.no. 2.1
IGST / (CGST+SGST) on {SP-01B + (Duties at Sr. 2.1 and 2.2 above)}
Description of Work / Item(s)
Amount
GST on supply of services offered by Indian Bidder/Indian Member of Consortium/JV, quoted in Indian Currency and Foreign Currency (part- breakup of SP-2 calculated based on percentage quoted in SP-5
Description of Work / Item(s)
Amount
AMOUNT OF FOREIGN COMPONENT
AMOUNT OF INDIAN COMPONENT
IITEM 1
IITEM 2
IITEM 3
IITEM 4
IITEM 5
IITEM 6
IITEM 7
IITEM 8
IITEM 9
IITEM 10
IITEM 11
IITEM 12
IITEM 13
IITEM 14
IITEM 15
IITEM 16
IITEM 17
IITEM 18
IITEM 19
IITEM 20
IITEM 21
IITEM 22
IITEM 23
IITEM 24
IITEM 25
IITEM 26
IITEM 27
IITEM 28
IITEM 29
IITEM 30
Description of Work / Item(s)
Amount
5 (Five) years Post Warranty Comprehensive Annual Maintenance Contract (PWCAMC) for Package PLC as per technical portion of bidding document & as per preamble to SOP
LUMPSUM CHARGES FOR 5 YEARS PWCAMC FOR SL.NO.1.00
5 (Five) years Post Warranty Comprehensive Annual Maintenance Contract (PWCAMC) for ANALYZERS (except density, moisture, PH/conductivity), as per technical portion of bidding document & as per preamble to SOP
LUMPSUM CHARGES FOR 5 YEARS PWCAMC FOR SL.NO.2
Thermax Babcock & Wilcox Energy Solutions Limited
Thermax Babcock & Wilcox Energy Solutions Limited
Thermax Babcock & Wilcox Energy Solutions Limited
Thermax Babcock & Wilcox Energy Solutions Limited
Isgec Heavy Engineering Ltd
Thermax Babcock & Wilcox Energy Solutions Limited
Thermax Babcock & Wilcox Energy Solutions Limited
Isgec Heavy Engineering Ltd
Thermax Babcock & Wilcox Energy Solutions Limited
Isgec Heavy Engineering Ltd
Thermax Babcock & Wilcox Energy Solutions Limited
Isgec Heavy Engineering Ltd
Thermax Babcock & Wilcox Energy Solutions Limited
Thermax Babcock & Wilcox Energy Solutions Limited
Thermax Babcock & Wilcox Energy Solutions Limited
Thermax Babcock & Wilcox Energy Solutions Limited
Isgec Heavy Engineering Ltd
Thermax Babcock & Wilcox Energy Solutions Limited
Thermax Babcock & Wilcox Energy Solutions Limited
Isgec Heavy Engineering Ltd
Thermax Babcock & Wilcox Energy Solutions Limited
Isgec Heavy Engineering Ltd
Thermax Babcock & Wilcox Energy Solutions Limited
Isgec Heavy Engineering Ltd
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
Portion of Quoted Rate in Currency
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .