Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-Finance | ₹1.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹1.5 L+₹1,395 (0.93%)Rejected-Finance TAKDAH T E DARJEELING | DARJEELING | DARJEELING | WEST BENGAL | ₹1.5 L+₹1,395 (0.93%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.5 L+₹2,400 (1.60%)Rejected-Finance | ₹1.5 L+₹2,400 (1.60%) | L3 | Rejected-Finance L3 |
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
20 Mar 2026, 6:00 pmClosed
Pradhan
Lamahatta GP
Construction of Retaining wall below Ashok Thapa House,sansad no.VII
2026_GTA_1022468_2
04/LMGP/15th FC/2025-26
Open Tender
CIVIL WORKS
Percentage
40 days
LAMAHATTA
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹3,000
20 Jul 2026
13 Mar 2026
23 Mar 2026
14 Mar 2026
20 Mar 2026
14 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary | - | cum | 119.27 | - |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) . | - | cum | 77.54 | - |
| 3 | Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming. | 1 | sqm | 50 | ₹49.95 |
| 4 | Cost of Boulder | 1 | cum | 1,272 | ₹1,270.73 |
| 5 | Plum concrete work with 40 % cement concrete with 30 mm down graded
stone metal and 60 % stone boulder of size 150 mm and above, placed in
position as directed excluding shuttering if any. | - | cum | 3,964.8 | - |
| 6 | Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). | - | Sqm | 334 | - |
| 7 | Add extra for unseen items | - | l/s | 1,308 | - |
| 8 | Add GST 18% | - | l/s | 22,655 | - |
| 9 | Add Cess 1% | - | l/s | 1,485.15 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.98 MB
BOQ_2512949.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .