Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹6.7 L
EMD Value
₹7,000
Closing Date
27 Feb 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE
400KV S/S Sarnath Varanasi
Construction of 132 and 33KV Bays for adding 63MVA T/F, Erection work of 63MVA T/F and Shifting of 08 MVA T/F installed at 132KV S/S Kerakat Under ETD-II Jaunpur
2023_UPTCL_770034_2
Short Term E-Tender No. 23 ETC-II (VNS)/2022-23
Open Tender
Construction Works
Piece-work
120 days
JAUNPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹826
EE ETD Ghazipur
₹7,000
31 Mar 2023
22 Feb 2023
28 Feb 2023
22 Feb 2023
27 Feb 2023
22 Feb 2023
Amount
Shifting , Counting and loading of S/S main & auxiliary Structure at EFU, Naini Prayagraj (CCM-02, CGM-01, ABR-01, BBL-02, BCT-03, ABL-02 & ALP-15)
Transporation of S/S main & auxliary structure from EFU Naini Prayagraj to 132 KV S/S Kerakat distanc approx 135 Km.
Unloading and Stacking of S/S main & auxiliary Structure at 132 KV S/S Kerakat (CCM-02, CGM-01, ABR-01, BBL-02, BCT-03, ABL-02 & ALP-15)
Erection of S/S main & auxliary Structure for installation of equipment e.g. 145 kV C.B, CT, BSI, 33 KV CB, Isolator, CT etc. The work included shifting of all materials from storage places to works site, Proper erection of structure as per drawing and all associated work.
Erection of following equipment as per instruction manual of various equipment and technical specification including shifting of equipment from store to site and all other associated work to complete the job satisfactorily.
145 KV CB with structure
145 KV Bus Isolator
Junction Box for 145 kV CT
Junction Box for 145 kV Isolators
T/F Control relay panel
33 kV Tripple feeder Panel
Energy metre .2 accu. Class ( ABT)
36 kV VCB with structure
36 kV BSI
Junction box for 33 kV CT
Junction for33 kV Isolator
Laying of following size control cable in the cable trench from contol relay panel to various equipments, junction box as per cable schedule and drawing, its shadling/binding at every meter disatance with aluminium strip 25x1mm size inclding carriage of cable drum from store to site and shifting back balance material to store and all other associated work.
Termination of following size of cable as laid above as per cable schedule including making necessary holes in glands, plate or box where ever required. Supply and fixing of cable gland of appropriate size, supply and fixing ferruls for each core as required and termination with proper size of lug and all other associated work to complete the job satisfactory as per technical specification.
Stringing of 36 metre (approx ) long 132 kV Bus bar (1x3P) ACSR panther conductor for adding 63 MVA T/F including hosting of disc insulator bolted type tension fitting with all associated work.
Making and jointing of jumpers from main bus to different type equipment with panther conductor including shifting of ACSR panther conductor from store to jumper site, cutting proper size jumper fixing of jumper in proper sag, tighting PG clamp connector and other all associated work.
Fixing of single suspensing fitting for panther conductor on 132 kV gantry including fitting of disc insulator.
Cutting straightening bending laying of 50x6mm M.S flat for earthing of main and auxilary structure equipment structure equipment etc. including welding with main earthmat below 500-700 mm below ground level with object to earth excavation of trenches its back filling painting with synthetic enamel green color above ground and all associated work to complete the job satisfactory excluding cost of M.S flat.
Delta earthing for L.A consisting of fabrican of 3 Nos 3 metre long electrodes, its piercing inside ground and connection of all three nos. electrodes with 36mm rod and connection of same with above LA including cost of M.S flat but excluding cost of bar which shall be supplied by the department.
Shifting of main tank of 63 MVA T/F from unloading place to plinth with the help of rail, pulling device, slippers etc. upto 20 meter distance including truning the tank and performing all other associated work.
Additional shifting of main tank upto 80 meter @ 5.00 meter/job.
Complete erection of 63 MVA T/F including radiators, conservator tank, HV/LV Neutral bushing, turrets, connectiong all pipe lines, cooling fans, control cables, motor drive mechanism of OLTC, RTCC panels etc, topping up of transformer (not circulation) and attending leakage if any and all other associated work for satisfactorily completion of work.
Complete earthing of 63 MVA T/F as per standard practice with 50x6 mm M.S. Flat main tank of the T/F, marshalling box, drive mechanism of cooling fans etc. shall be earthed as per standard practice including painting. M.S. flat shall be provided by contractor at his own cost.
Earthing of 63 MVA T/F neutral with 75x10 mm and 50x6 mm flat run old ladder, its grounding painting and connecting with delta with flat at two point, painting of flat and other associated work M.S. flat to be provided by the contractor at his own cost.
Jumpring of the 63 MVA T/F
HV side with Single ACSR panther conductor.
LV side with Single ACSR Twin Moose conductor.
Complete control cable termination in Transformer in marshalling box, OLTC box, RTCC panel, colling fans including laying of new cables as required with all associated work.
Centrifuging of complete Transformer by centrifuging machine and taking the VDB, value of oil periodically till the required value is achieved.
Dismantling the accessories of 8 MVA, 33/11 KV Transformer after opening of jumpers, removal of earthing and opening of cables & cable connection, All other T&P etc. shall be arranged by the contractor at his own cost.
Shifting of main tank of dismantle 8 MVA, 33/11 KV transformer from dismantle point up to plinth, approximate 40 mtrs distance including turning of tank, if required including all T&P and all other works required to complete the job satisfactory as per tech specn.
Complete, erection of 8 MVA T/F by making control cables connection, buchholz relay, jumpering, earthing etc. for completing the work, topping of T/F oil and final oil filling in tank, radiator, conservator tank and all other associates work for completion of work.
Shifting of damage 5 MVA discom T/F laying in switchyard of kerakat S/S approx distance 30 Mtr. Out side of switchyard with all other associated work
U K S ENTERPRISES
Gupta Elect and Engg Works
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .