Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC F 4 FIRST FLOOR SECTOR 27 NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹1.1 Cr | L1 | Accepted-AOC L1 FOR ONLINE PARTIAL DISCHARGE MONITORING SYSTEM |
| 2 | L1₹5.5 CrAccepted-AOC | ₹5.5 Cr | L1 | Accepted-AOC L1 FOR ITEM ONLINE AIRGAP AND FILED STRENGTH MONITORING SYSTEM |
| 3 | Rejected-Technical PLOT NO 7 8 DEV INDUSTRIAL ESTATE BIDC GORWA VADODARA GUJARAT 390016 UDYAM GJ 24 0010601 24AADCI4007K1ZT R M MII STATUS AS VERIFIED | VADODARA | GUJARAT | 390016 | - | - | Rejected-Technical Techno commercially not qualified |
| 4 | Rejected-Technical | - | - | Rejected-Technical Techno commercially not qualified |
| 5 | Rejected-Technical 1 430 GARIAHAT ROAD SOUTH 3RD FLOOR KOLKATA KOLKATA WEST BENGAL 700068 | KOLKATA | WEST BENGAL | 700068 | - | - | Rejected-Technical Techno commercially not qualified |
Tender Value
₹10.5 Cr
EMD Value
₹20 L
Closing Date
16 Jul 2019, 3:00 pmClosed
General Manager C and P
NHDC Parisar Shyamla Hills Bhopal
Supply, Installation and Commissioning of Online Condition Monitoring System for 8x125 MW Indira Sagar Power Station
2019_NHDC_469343_1
NHDC 1C 655 19 2352
Open Tender
Electronics Equipment
Supply
365 days
NHDC CO Bhopal
As per tender document
17 documents required · 17 mandatory
₹5,900
Yes
NHDC Ltd
₹20 L
Yes
20 Apr 2020
14 May 2019
17 Jul 2019
14 May 2019
16 Jul 2019
14 May 2019
14 May 2019 - 9 Jul 2019
Supply of Online Air Gap Monitoring System and Online Field Strength Monitoring System for all 8 units including spares parts as per Scope of work- Clause 2.0 mentioned in section III (Special Condition of Contract) and Technical particulars as per clause 2.1 of Section-IV (Technical Specification)
Installation, testing and Commissioning, onsite training charges and Result interpretation services for all 8 units (02 times during guarantee/ warantee period) for item at Si. No. 1 above as per scope of work- clause 2.0 mentioned in section III (Special Condition of Contract) excluding spare parts.
Description of Work / Item(s)
Supply of Online Partial Discharge Monitoring System for all 8 units, including Spare parts, as per Scope of work- Clause 2.0 mentioned in section III (Special Condition of Contract) and Technical particulars as per clause no. 2.2 of section-IV (Technical Specification).
Installation, testing and Commissioning, onsite training charges and Result interpretation services for all 8 units (02 times during guarantee/ warantee period) for item at Si. No. 1 above as per scope of work- clause 2.0 mentioned in section III (Special Condition of Contract) excluding spare parts.
Kingsly Instrumentation and Communication P Ltd.
Kingsly Instrumentation and Communication P Ltd.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .