Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.7 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹60.4 L+₹13.7 L (29.3%)Rejected-AOC | L2 | Rejected-AOC REJECTED | |
| 3 | L3₹61.2 L+₹14.5 L (31.0%)Rejected-AOC | L3 | Rejected-AOC REJECTED | |
| 4 | L4₹84.5 L+₹37.8 L (81.0%)Rejected-AOC | L4 | Rejected-AOC REJECTED | |
| 5 | L5₹95.0 L+₹48.3 L (103.4%)Rejected-AOC BASHAT CHENANI TEH CHENANI DISTT UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L5 | Rejected-AOC REJECTED |
Tender Value
₹80.5 L
EMD Value
₹1.6 L
Closing Date
23 Jan 2023, 5:00 pmClosed
Office of The Chief Engineer PMGSY(JKRRDA) Jammu
Office of The Chief Engineer PMGSY(JKRRDA) Jammu at 1stFloor, Mechanical Engineering Department (MED) Complex University Road Jammu
Balance Work of Construction of road from L029 Koi to Kolakh, Package No. JK14-508, Stage-I, Regular PMGSY-I (Batch-I, 2017-18), Block- Chenani, District Udhampur.
2023_JKRRD_122736_3
e-NIT No CEJ/PMGSY/729 OF 2022-23 DTD10-01-2023
Open Tender
Civil Works - Roads
Percentage
90 days
Chenani
Please refer Tender documents.
6 documents required · 6 mandatory
₹6,000
₹1.6 L
Office of The Chief Engineer PMGSY(JKRRDA) Jammu
23 Mar 2023
12 Jan 2023
25 Jan 2023
12 Jan 2023
23 Jan 2023
16 Jan 2023
14 Jan 2023 - 16 Jan 2023
14 Jan 2023
eProcurement System for Pradhan Mantri Gram Sadak Yojana (PMGSY) Created By: PARSHOTAM SHARMA Created Date/Time: 02-Mar-2023 01:48 PM Tender Title: Balance Work of Construction of road from L029 Koi to Kolakh, Package No. JK14-508, Stage-I, Regular PMGSY-I (Batch-I, 2017-18), Block- Chenani, District Udhampur. Tender ID: 2023_JKRRD_122736_3
Tender Inviting Authority: CHIEF ENGINEER PMGSY JKRRDA JAMMU ON BEHALF OF GOVERNOR OF JAMMU AND KASHMIR UT
Name of Work: Balance Work of Construction of road from L029 Koi to Kolakh, Package No. JK14-508, Stage-I, Regular PMGSY-I (Batch-I, 2017-18), Block- Chenani, District Udhampur
Contract No. JK14-508 Length: 7.794 Kms
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 Mohd Yousuf Shan(GSTN-NA) 8048320.40 -42.00 4668025.83 Fourty Six Lakh Sixty Eight Thousand Twenty Five
2.00 MOHD HANIEF SHAN(GSTN-NA) 8048320.40 -24.00 6116723.50 Sixty One Lakh Sixteen Thousand Seven Hundred and Twenty Three
3.00 Farooq Ahmed(GSTN-NA) 8048320.40 18.00 9497018.07 Ninty Four Lakh Ninty Seven Thousand Eighteen
4.00 mohd rafiq shan(GSTN-NA) 8048320.40 -25.00 6036240.30 Sixty Lakh Thirty Six Thousand Two Hundred and Fourty
5.00 Abdul Quyoom Shan(GSTN-NA) 8048320.40 5.00 8450736.42 Eighty Four Lakh Fifty Thousand Seven Hundred and Thirty Six
Lowest Amount Quoted BY: Mohd Yousuf Shan(4668025.83)
BOQ Summary Details Tender Title: Balance Work of Construction of road from L029 Koi to Kolakh, Package No. JK14-508, Stage-I, Regular PMGSY-I (Batch-I, 2017-18), Block- Chenani, District Udhampur. Tender ID: 2023_JKRRD_122736_3
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Mohd Yousuf Shan 4668025.83 L1
2 mohd rafiq shan 6036240.30 L2
3 MOHD HANIEF SHAN 6116723.50 L3
4 Abdul Quyoom Shan 8450736.42 L4
5 Farooq Ahmed 9497018.07 L5
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .