Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.3 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹42.1 L+₹66,033.50 (1.59%)Rejected-Finance FLAT NO 201 GREEN VALLEY CHS PLOT NO 26 SECTOR 19 NERUL EAST NAVI MUMBAI 400 706 | THANE | MAHARASHTRA | 400706 | L2 | Rejected-Finance NOT ADMITTED BEING L2 | |
| 3 | L3₹43.1 L+₹1.6 L (3.80%)Rejected-Finance 1501 BHAGWATI EMINENCE SAVITRIBAI PHULE MARG BESIDES R R PATIL GARDEN SECTION 13 NERUL E NAVI MUMBAI | RAIGAD | MAHARASHTRA | 400702 | L3 | Rejected-Finance NOT ADMITTED BEING L3 | |
| 4 | L4₹43.3 L+₹1.8 L (4.30%)Rejected-Finance | L4 | Rejected-Finance NOT ADMITTED BEING L4 | |
| 5 | L5₹44.4 L+₹3.0 L (7.14%)Rejected-Finance | L5 | Rejected-Finance NOT ADMITTED BEING L5 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
31 Oct 2023, 6:00 pmClosed
GE NW KARANJA
NAVAL STATION KARANJA, URAN, RAIGAD, MAHARASHTRA
MAINT OF LIGHTNING PROTECTION INCLUDING REPLACEMENT OF EARTHING WITH GI CU STRIP TEST POINT AND TESTING OF EXISTING EARTHING AND MISC WORKS UNDER AGE EM I AT NAVAL STATION KARANJA
2023_MES_622659_1
8745/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
GE NW KARANJA
D and above b i
8 documents required · 8 mandatory
₹500
Yes
GE NW KARANJA
₹90,000
Yes
16 Dec 2023
11 Oct 2023
2 Nov 2023
11 Oct 2023
31 Oct 2023
24 Oct 2023
Amount
Notes : (i) The work consists of 01 Job as under:- JOB (A) : TPP 23-24 Ser No. 57 (ii) Please refer schedule 'A' notes before quoting the tender. (iii) Amount of Schedule of Credit shall be deducted off line by the department.
Note:- The Unit Rate quoted in r/o Ser item No 1.02 to 1.71 are deemed to include for the following and nothing extra will be paid for these works: 1. Supplying, erecting and use of scaffolding upto required height (max 25 to 30m) or upto 8th floor height with necessary H-frames, pipes, couplers, buckles, bracing, top platform with support railing at top etc. at all levels of building including carriage of the materials to the location, erecting, fixing the scaffolding and dismembering the same after working and taking away the scaffolding materials etc. complete as per direction of Engineer-in-charge. 2. Supplying, erecting & use of temporary bamboo scaffolding around the building as required. The scaffolding is to be secured properly in position by bracings, ties clamps, etc. complete including providing and erecting working platform at all heights as required, including removal after completion of work all as per direction of Engineer-in-Charge.
S&F in replacement air termination single pointed aluminium rod 12 mm dia and 300 m long with necessary fixing arrangement on blocks on roof, complete all as specified and directed
S&F in replacement air termination single pointed copper rod 12 mm dia and 300 m long with necessary fixing arrangement on blocks on roof, complete all as specified and directed
All as per BOQ srl item No 1.02 above but 1.00 mtr long 12 mm dia and making suitable arrangement for fixing of 1 mtr rod on roof complete all as specified and directed.
S&F in repairs copper strip 32 mm x 6 mm buried in ground for earth continuity conductor or fixed to porcelain, insulator fixed to wall , complete all as specified and directed
All as per BOQ item no 1.05 above but of 20x3.15mm complete all as specified and directed
All as per BOQ item no 1.05 above but of 25x3.15mm complete all as specified and directed
Removal of air termination single pointed aluminium rod 12 mm dia and 300 mm long by tightening with necessay fixing arrangement & fixing on existing/new PCC blocks on roof and making good complete all as specified and directed.
Removal of air termination single pointed copper rod 12 mm dia and 300 mm long by tightening with necessay fixing arrangement & fixing on existing/new PCC blocks on roof and making good complete all as specified and directed.
All as per BOQ srl item No 1.08 above but 1.00 mtr long but fixed on ceiling on roof complete all as specified and directed
S&F in repairs aluminium strip of size 25 x 3.15 mm fixed with suitable saddles & fixing screw etc on roof with rubber & bitumen washer & fixed to insulator on wall for down conductor , complete all as specified and directed
All as per BOQ item no 1.11 above but GI strip of 32x6mm on wall/surface for conductors or as earth continuity conductor complete all as specified and directed. Note for item No. 1.11 to 1.12 :- Porcelain Insulator & PCC required shall be measured and paid for separately under relevant items of Sch
S&F in repairs GI strip 32mm x 6 mm burried in ground for loop earthing and ground grid including excavation and earth work in any type of soil complete all as specified and directed
S&F in repairs test point terminal block made of gun metal or phosphorus bronze size 75 x 75 x 25 mm thick drilled and screwed including 3 Nos 8 mm dia 25 mm long hexagonal head screws fixed to GI strip bracket fixed to porcelain insulator in wall , complete all as specified and directed Note :- Porcelain insulator will be measured & paid for separetly.
S&F vitreous china porcelain insulator with busbar support white type, complete all as specified and directed
Fixing only in repair only aluminium strip of size 20/25 mm x 3.15 mm fixed to procelain insulator fixed with suitable saddles & fixing screws etc for roof with rubber & bitumen washer & fixed to insulator only on wall for down conductor, complete all as specified and directed
Fixing only in repair only copper strip of size 25 mm x 3.15 mm fixed to procelain insulator fixed with suitable saddles & fixing screws etc for roof with rubber & bitumen washer & fixed to insulator only on wall for down conductor, complete all as specified and directed
Fixing only in repair only copper strip of size 20mm x 3.15 mm fixed to procelain insulator fixed with suitable saddles & fixing screws etc for roof with rubber & bitumen washer & fixed to insulator only on wall for down conductor, complete all as specified and directed
Fixing only in repair only copper strip of size 32mm x 6 mm fixed to procelain insulator fixed with suitable saddles & fixing screws etc for roof with rubber & bitumen washer & fixed to insulator only on wall for down conductor, complete all as specified and directed
All as per BOQ item no 1.19 above but GI strip of 32x6mm complete all as specified and directed
M&L for testing of Lightning Conductor & earthing except new earthing of various Tech Accn in NAD area & Tunir Area in the presence of users representative & Engineer-in-Charge & maintaining record of tests for lightning conductor as per IAFW -2215 by removing all connection and the resistance of earthing & lightning protection network should not exceed 5 Ohm in every technical building showing the details of defective earthing & lightening protection system. Items to be repaired/renewal during record of sets for lightening conductors as per IAFW 2215 & also test results to be recorded after repair/renewal and should be signed by users also Note :- (i) The earthing showing result beyond 10 ohm to be renewed and shall be measured & paid for separately under relevant item of Sch 'A'. (ii) The test result after renewal of earthing and replacement of defective conductor also be recorded in earthing test book as per IAFW-2215 for lightening conductor & cost for the same is deemed to be included in unit rate of above item. (iii) The unit rate quoted shall be deemed to be included for the test results of all existing earthing point, date of testing and renewal etc to be written on wall of each building in clear format like stenzil etc as per direction from engr-in-charge with out any extra cost. (iv) The testing of new earthing covered under item Nos 1.22 & 1.23 of BOQ are not covered in this item.
M&L earthing complete with GI earth plate electrode of size 60 cm x 60 cm x 6 mm thick burried directly in ground (earth pit not less than 2.25 m deep below ground level) with top edge of the plate not less than 1.5 m below the normal ground level connected with GI strip 32 x 6 mm by means of bolts, nuts, check nuts & washers of galvanished iron steel including necessary excavation and earth work in any type of soil, removing surplus soil to a distance not exc 50 m, with and including PCC chamber in PCC (1:2:4) , type B1, using (20 mm graded stone aggregate), mild steel angle iron frame made out of MS angle iron of size 40x40x6 mm thick duly painted with two coats of synthetic enamel paint over one coat of red oxide zinc chrome primer hinged with and including 6mm thick CI cover with handle, watering arrangement with funnel internally secured with wire mesh with 20 mm dia medium grade pipe for watering ,40 mm dia light grade GI pipe for lead protection in & including alternate layers of charcoal dust and common salt complete all as shown in electrical plate No 3 of SSR Part-1(2009) connected to earthing test point all as specified and indicated including testing on completion
All as per BOQ srl item No. 1.22 above, but with copper earth electrode of size 60 cm x 60 cm x 3.15 mm thick & earth continunity lead of size 20 mm x 3 mm copper strip, complete all as specified and directed 'Note :-for item No. 1.22 & 1.23 :- (i) copper strip upto 7.5 m will be deemed to be inluded in quoted rate of item No. 21 & 22 respectively. (ii) The earth chamber shall be constructed 50 cm away from the edge of earth pit & the cost of the same is deemed to be included in rate quoted for above items.(iii) The rates quoted for item Nos 21 & 22 are also deemed to be included for cost of new test point as specified.
Supply and installation a set of maintanance free earthing system consisting of 03 number of copper bonded earth rod of 17.2mm dia x 2 mtr length with coated with 250 micron electrolytic grade copper tested on 25 KA fault current by CPRI with driving head and tip to directly drive the earth rod to the ground with each rod interconnected with 20x3.15mm copper strip at the interval of 2mtr to form a square complete all as specified and directed . NOTE:-The rate includes testing of earthing system and getting the earthing value less than 3 ohm in any soil condition.
M&L PCC (1:2: 4) type BO, (using 12.5 mm graded stone aggregate) of blocks size and IE rules including necessary use and waste of form work as in grounting of porcelain insulator, complete all as specified and directed
M&L for PCC (1:2:4) type B1, (using 20 mm graded stone aggretgate) for earth chambers as in repairs, coping for GI pipe post including necessary form work, excavation in soft loose soil, returning in filling and removing surplus soil to a distance n. exc 50 mtr and deposing complete all as specified and directed
Removing existing worn out CI cover with angle iron frame of earth chamber and supply and fix new CI cover of size 30 cm x 30 cm x 6 mm thick fixed in frame made out of mild steel angle iron 40 mm x 40 mm x 6 mm thick with and including locking and lifting arrnagement, painting with two coats of synthetic enamel paint over a coat of red oxide zinc chrome primer complete all as specified and directed
S&F 40 mm dia GI pipe medium grade for post not exceeding 3 mtrs in length truly vertical position embbed in PCC including n.exc and earth work as in repairs, complete all as specified and directed. Note : PCC of of pole embeded will be measured and paid separately under relevant items of Sch.
Supply and laying 40mm dia, GI pipe, light grade, burried in trenches as earth continuity protection as in repairs, including necessary excavation and earth work in hard/dense soil, returining & filling in, watering and well ramming, removal of surplus soil to a distance not exc 50 mtrs complete all as specified and directed.
M.K Enterprises
SREE HARITHA ASSOCIATES
PRASHANT ENTERPRISES
LAXMI ENTERPRISES
R A Electric Co.
ELECTRO ASSOCIATES
ENJOY
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .