| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.2 LAccepted-Finance | L1 | Accepted-Finance Bidder found to be L1 | |
| 2 | L2₹14.6 L+₹1.5 L (11.1%)Accepted-Finance | L2 | Accepted-Finance Bidder found to be L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical Not as per PQC |
Tender Value
₹13.8 L
EMD Value
₹27,600
Closing Date
21 Jun 2023, 5:00 pmClosed
Executive Engineer
Hydel Obra Power Station,Obra Sonebhadra
minor maintenance of 125/25 Ton Intake gate gantry crane at HOPS,Obra
2023_UPJVN_804996_1
T-06/HOPS/2023-24
Open Tender
Repair and Maintenance Works
Item Rate
90 days
Obra Sonebhadra
As per tender documents
2 documents required · 2 mandatory
₹1,180
Executive Engineer, HOPS
₹27,600
7 Aug 2023
23 May 2023
22 Jun 2023
23 May 2023
21 Jun 2023
23 May 2023
WORK PORTION (Work shall be as per scope of work )
Overhauling of auxiliary hoist mechanism of intake gate Gallioth Crane
Overhauling of Bogie carriage for Long Travel machinery of intake gate Goliath Crane
Overhauling of operator cabin, sheet shades, foot brake and rails
Replacement of lever type Limit switch of long travel.
Supply and replacement of power cable wiring & control cable wiring of long travel operating panel, motor, resistance box with suitable size pvc/rubber insulated copper flexible cable.
Complete overhauling of 4 no. 10 HP Motors, replacement of carbon brush. Overhauling of slip ring and complete rewiring of motor terminal block.
Replacement of DSL and associated wiring for cross travel.
Replacement of power cable wiring & control cable wiring of cross travel operating panel, motor, resistance box with suitable size pvc/rubber insulated copper flexible cable.
Replacement of Counter and Rotary Limit switch of Auxiliary Hoist.
Overhauling of Auxiliary Hoist thruster brake As per existing drum and overhauling of brake drum.
Replacement of power cable wiring & control cable wiring of Auxiliary hoist operating panel, motor, resistance box with suitable size pvc/rubber insulated copper flexible cable.
Complete overhauling of 40 HP Motor, replacement of carbon brush, overhauling of slip ring and complete rewiring of motor terminal block.
Replacement of brake shoe of 8" drum dia for 04 nos. electromagnetic brake for long travel and overhauling of brake coils.
Replacement of brake shoe of 8" drum dia for 01 no. electromagnetic brake for cross travel and overhauling of brake coils.
Complete Rewiring of all Bulkhead fitting with 1.5 mm PVC insulated conductor wire in existing conduit.
SUPPLY PORTION:-
Bearing SKF make11213
Bearing SKF make 22220
Bush (Gun Metal) of wheels (long travel)
2" * 2" MS- wire mesh
25 * 5 mm MS- Sheet
35 * 35 * 5 mm MS- Angle
18 swg MS- Sheet
Flexible GI conduit 1" size
5 mm thick Fibre glass
12mm thick plywood
8mm thick rubber sheet
Brass Grease Nipples
1.5 mm² PVC insulated, multistrand Cu conductor wire.
8" brake liner with bolts
3 core x 35 mm² power trailing cable.
supply of Master controller, 4 step,6- cam for 40 HP motor having off position interlock, contact rated for 50 A, 500 VAC with spring return arrangement
Counter and Rotary Limit switch of auxiliary Hoist
supply of Master controller, 4 step,6- cam for long travel having off position interlock, contact rated for 80 A, 500 VAC with spring return arrangement
Lever type Limit switch of Long travel.
Supply of DSL system for cross travel along with current collector and web bracket as per existing motor load
M/S VERMA CONSTRUCTION n SUPPLIER
Bidder Name
M/S J K ENTERPRISES
M/S VERMA CONSTRUCTION n SUPPLIER
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .