Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 CrAccepted-Finance FARIDPUR PACHKHORA BALLIA U P | BALLIA | BALLIA | UTTAR PRADESH | ₹9.7 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹9.8 Cr+₹9.1 L (0.94%)Rejected-Finance | ₹9.8 Cr+₹9.1 L (0.94%) | L2 | Rejected-Finance L2 |
| 3 | L3₹10.1 Cr+₹38.0 L (3.92%)Rejected-Finance VILLAGE PATHRA POST BADGO THANA KHORABAR DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | ₹10.1 Cr+₹38.0 L (3.92%) | L3 | Rejected-Finance L3 |
| 4 | L4₹10.3 Cr+₹63.5 L (6.56%)Rejected-Finance | ₹10.3 Cr+₹63.5 L (6.56%) | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical As Per Uploaded |
| Sl No | Description | Qty | Unit | A.K. Associates L4 | M/S AJIT CONSTRUCTION AND ORDER SUPPLIER L3 | Pratap Construction L1 | M/S AZAD PRATAP RAO L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Cartage earth Earth Work in filling plinth with cartage earth | 8,826 | CUM | 200 ₹17,65,200 Lowest | 330 ₹29,12,580 | 270 ₹23,83,020 | 314.21 ₹27,73,217.46 |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 1,738.14 | CUM | 197.05 ₹3,42,500.49 | 120 ₹2,08,576.8 Lowest | 130 ₹2,25,958.2 | 168.48 ₹2,92,841.83 |
| 3.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 159.26 | CUM | 1,607.68 ₹2,56,039.12 | 1,300 ₹2,07,038 Lowest | 1,500 ₹2,38,890 | 1,374.57 ₹2,18,914.02 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) ,including cost of form- work,in foundation and floors.(Make for Cement-Ultratech/ACC/JK cement) | 706.38 | CUM | 4,800 ₹33,90,624 | 4,500 ₹31,78,710 | 4,500 ₹31,78,710 | 4,408.96 ₹31,14,401.16 Lowest |
| 5.00 | Making apron(with Drain & other )analysis | 428.79 | RM | 933.38 ₹4,00,224.01 | 800 ₹3,43,032 | 933.38 ₹4,00,224.01 | 798.04 ₹3,42,191.57 Lowest |
| 6.00 | Diluting and injecting chemical emulsion for pre-constructional anti-termite treatment Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floorWith Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 1,645.58 | SQM | 234.71 ₹3,86,234.08 | 190 ₹3,12,660.2 Lowest | 234.71 ₹3,86,234.08 | 200.68 ₹3,30,234.99 |
| 7.00 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (Zone III) derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources). (Make for Cement-Ultratech/ACC/JK cement) | 156.78 | SQM | 311.01 ₹48,760.15 | 250 ₹39,195 Lowest | 311.01 ₹48,760.15 | 265.91 ₹41,689.37 |
| 8.00 | Providing and applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with apiece of cloth lightly soaked in kerosene oil. (Make for Petroleum Bitumen-IOCL/BPCL/HPCL) | 167.65 | SQM | 110.64 ₹18,548.8 | 90 ₹15,088.5 Lowest | 110.64 ₹18,548.8 | 94.6 ₹15,859.69 |
| 9.00 | R.C.C work with cement approved coarse sand and 2 cm gauge approved stone grit in proportions of 1:1.5:3 (In Raft/foundation ) (Make for Cement-Ultratech/ACC/JK cement) | 448.63 | CUM | 6,000 ₹26,91,780 | 6,500 ₹29,16,095 | 5,800 ₹26,02,054 Lowest | 5,854.72 ₹26,26,603.03 |
| 10.00 | R.c.c. work with cement approved coarse sand and 2 cm. (3/4") guage approved stone ballast in the proportion 1:1.5:3,(1cement :1.5corse sand 3 grit)k in beams, Culvert beams,suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels,bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level excluding supply of reinforcement and its fixing and bending but including its fixing and binding the same necessary with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works.(Make for Cement-Ultratech/ACC/JK cement) | 797.22 | CUM | 8,000 ₹63,77,760 | 7,800 ₹62,18,316 | 6,000 ₹47,83,320 Lowest | 7,446.76 ₹59,36,706.01 |
Tender Value
Refer Docs
EMD Value
₹22.9 L
Closing Date
27 Aug 2026, 5:00 pmClosed
Superintending Engineer
Superintending Engineer, Gandak Flood Circle, Basti
Construction of Type-I, Type-II, Type-III and Type-IV Residence Building in Campus of Banganga Canal Colony in Distt. Siddharthnagar.
2026_UPIDC_1178277_1
04/SE/2026-27
Open Tender
Civil Works
Item Wise
300 days
Siddharthnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,354
₹22.9 L
Superintending Engineer, Gandak Flood Circle, Bast
14 Sept 2026
20 Aug 2026
27 Aug 2026
20 Aug 2026
27 Aug 2026
20 Aug 2026
20 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cartage earth Earth Work in filling plinth with cartage earth | - | CUM | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | CUM | - | - |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | CUM | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) ,including cost of form- work,in foundation and floors.(Make for Cement-Ultratech/ACC/JK cement) | - | CUM | - | - |
| 5 | Making apron(with Drain & other )analysis | - | RM | - | - |
| 6 | Diluting and injecting chemical emulsion for pre-constructional anti-termite treatment Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floorWith Chlorpyriphos/Lindane E.C. 20% with 1% concentration | - | SQM | - | - |
| 7 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (Zone III) derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources). (Make for Cement-Ultratech/ACC/JK cement) | - | SQM | - | - |
| 8 | Providing and applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with apiece of cloth lightly soaked in kerosene oil. (Make for Petroleum Bitumen-IOCL/BPCL/HPCL) | - | SQM | - | - |
| 9 | R.C.C work with cement approved coarse sand and 2 cm gauge approved stone grit in proportions of 1:1.5:3 (In Raft/foundation ) (Make for Cement-Ultratech/ACC/JK cement) | - | CUM | - | - |
| 10 | R.c.c. work with cement approved coarse sand and 2 cm. (3/4") guage approved stone ballast in the proportion 1:1.5:3,(1cement :1.5corse sand 3 grit)k in beams, Culvert beams,suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels,bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level excluding supply of reinforcement and its fixing and bending but including its fixing and binding the same necessary with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works.(Make for Cement-Ultratech/ACC/JK cement) | - | CUM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.50 MB
BOQ_2214150.xls
BOQ • 0.51 MB
L_01.pdf
Tender Documents • 2.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .