Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.6 LAdmitted-Finance | ₹28.6 L | L1 | Admitted-Finance |
| 2 | L2₹31.8 L+₹3.2 L (11.1%)Admitted-Finance | ₹31.8 L+₹3.2 L (11.1%) | L2 | Admitted-Finance |
| 3 | L3₹31.9 L+₹3.3 L (11.6%)Admitted-Finance 1 SRI GOKULAM COMPLEX 15 155B MARAPALAM MADUKKARAI COIMBATORE DISTRICT 641 105 | COIMBATORE | TAMIL NADU | 641105 | ₹31.9 L+₹3.3 L (11.6%) | L3 | Admitted-Finance |
| 4 | L4₹32.2 L+₹3.6 L (12.5%)Admitted-Finance 3 165 1A KAMARAJ NAGAR KANGAYAMPALAYAM SULUR COIMBATORE TAMIL NADU 641 401 | COIMBATORE | COIMBATORE | TAMIL NADU | 641401 | ₹32.2 L+₹3.6 L (12.5%) | L4 | Admitted-Finance |
| 5 | L5₹33.0 L+₹4.4 L (15.3%)Admitted-Finance 18 CORPORATION ROAD DEVAKOTTAI | SIVAGANGA | TAMIL NADU | 630001 | ₹33.0 L+₹4.4 L (15.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | pskassociate L9 | Vishnu Infrastructures L4 | M S ENGINEERS L6 | KADAIESWARI AND CO L2 | M/s.MS ENGINEERS AND BUILDERS L8 | ABBI ASSOCIATES L3 | V MEENAL AND CO L5 | SHREE KUMARAN CONSTRUCTION L7 | KUMARAN KUDIL CONSTRUCTIONS L11 | M/S THANGARAJ & CO L10 | SRI KUMARAGURU INFRA L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavations in all soils and sub-soils and the full depth as may be directed by the Deptl.officers with initial leads and lifts and cleaning and leveling the site etc, complete complying with standard specification | 592 | m3 | 100 ₹59,200 | 110 ₹65,120 | 100 ₹59,200 | 92.57 ₹54,801.44 | 75 ₹44,400 | 70 ₹41,440 Lowest | 95.35 ₹56,447.2 | 96.81 ₹57,312.76 | 72 ₹42,624 | 98 ₹58,016 | 99 ₹58,608 |
| 2.00 | Conveying the excavated earth and for milling materials to the work site to designated dumping yard from the site to the distance of 0 to 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges | 356 | m3 | 53 ₹18,868 | 60 ₹21,360 | 50 ₹17,800 | 51.89 ₹18,472.84 | 30 ₹10,680 Lowest | 30 ₹10,680 Lowest | 81.95 ₹29,174.2 | 54.27 ₹19,320.4 | 45 ₹16,020 | 55 ₹19,580 | 100 ₹35,600 |
| 3.00 | ProvidingGranular surfacebase to the requiredsurfaceusingmurram, Granular soil of size varying from4mm to 75mm including cost of material and cost of labour for stacking, spreading and consolidating layerby layer (Each layernotexceeding100mm) includinghirecharges of Roller etc, complete as per the direction of Departmental officers. | 444 | m3 | 1,789 ₹7,94,316 | 1,400 ₹6,21,600 Lowest | 1,800 ₹7,99,200 | 1,611.17 ₹7,15,359.48 | 1,750 ₹7,77,000 | 1,500 ₹6,66,000 | 1,659.53 ₹7,36,831.32 | 1,685.09 ₹7,48,180.23 | 2,300 ₹10,21,200 | 2,200 ₹9,76,800 | 1,580 ₹7,01,520 |
| 4.00 | Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base /base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 296 | m3 | 2,348 ₹6,95,008 | 2,300 ₹6,80,800 | 2,400 ₹7,10,400 | 2,112.2 ₹6,25,211.2 | 2,250 ₹6,66,000 | 2,100 ₹6,21,600 Lowest | 2,175.67 ₹6,43,998.32 | 2,209.11 ₹6,53,896 | 2,300 ₹6,80,800 | 2,236 ₹6,61,856 | 2,260 ₹6,68,960 |
| 5.00 | Providing and laying Prime Coat 7Kg/10 M2 With Bitumen Emulsion (Slow Setting) Including Cost of Bitumen emulsion At The Site Including Labour Charges For Preparing The Surface And Applying Required Quantity of Bitumen Emulsion As Prime Coat Using Bitumen Sprayer Etc. Complete Over Wet Mix Macadam As Per Clause 502 of Mort & H Specifications. | 2,956 | m2 | 94 ₹2,77,864 | 100 ₹2,95,600 | 80 ₹2,36,480 | 84.15 ₹2,48,747.4 | 80 ₹2,36,480 | 75 ₹2,21,700 | 87.47 ₹2,58,561.32 | 88.01 ₹2,60,160.52 | 54 ₹1,59,624 Lowest | 89 ₹2,63,084 | 73 ₹2,15,788 |
| 6.00 | Providing and laying Tack Coat 2.5 kg/10 m2 with Bitumen Emulsion (Rapid Setting 1) including cost of bitumen emulsion at the site, including labour charges for preparing the surface and applying required quantity of bitumen emulsion as Tack Coat using bitumen sprayer etc., complete over the primed surface as per clause 503 of MoRT& H Specifications Rev.5 | 2,956 | m2 | 24 ₹70,944 | 25 ₹73,900 | 30 ₹88,680 | 21.42 ₹63,317.52 | 18 ₹53,208 | 15 ₹44,340 Lowest | 22.06 ₹65,209.36 | 22.4 ₹66,222.68 | 45 ₹1,33,020 | 22.7 ₹67,101.2 | 18 ₹53,208 |
| 7.00 | Providing and laying Bituminous Concrete30mm thick using 19 – 9.50 mm metal, 9.5-2.36 mm Metal, 2.36 mm and below Metal of specified grading aggregates and Quarry Dust with 37.73 kg of VG30 (60/70grade) bitumen ( Procured from State/ Central Public sector undertakings only) for premixing per 10sq.m including cost and conveyance of all materials to work site and stacking them on road side to standard departmental metric gauge for pre-measurement, heating the bitumen in bitumen boiler heating the aggregates and mixing them with bitumen in mini hot mix plant, spreading the mix in the required temperature for uniform thick of 30mm over a previously prepared surface to specified grade and cross section and compaction by power roller, including labour charges, spreading etc., including Hire charges for machineries etc., complete as per clause 509 of MoRT & H Specifications to achieve the desired compaction. | 119 | m3 | 13,551 ₹16,12,569 | 12,250 ₹14,57,750 | 11,830 ₹14,07,770 | 12,184.54 ₹14,49,960.26 | 13,850 ₹16,48,150 | 13,300 ₹15,82,700 | 12,648.98 ₹15,05,228.62 | 12,743.59 ₹15,16,487.54 | 13,005 ₹15,47,595 | 12,900 ₹15,35,100 | 9,450 ₹11,24,550 Lowest |
Tender Value
₹50 L
EMD Value
₹50,000
Closing Date
2 Sept 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Formation of BT Surface at Sri Nagar in Ward No. 9 ,East Zone.
2026_MAWS_694694_8
E57/2026-Two Cover-EZ
Open Tender
Civil Works - Roads
Works
150 days
Coimbatore city municipal corporation, Townhall
As per tender conditions
5 documents required · 5 mandatory
₹0
₹50,000
18 Sept 2026
17 Aug 2026
3 Sept 2026
17 Aug 2026
2 Sept 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavations in all soils and sub-soils and the full depth as may be directed by the Deptl.officers with initial leads and lifts and cleaning and leveling the site etc, complete complying with standard specification | 592 | m3 | - | - |
| 2 | Conveying the excavated earth and for milling materials to the work site to designated dumping yard from the site to the distance of 0 to 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges | 356 | m3 | - | - |
| 3 | ProvidingGranular surfacebase to the requiredsurfaceusingmurram, Granular soil of size varying from4mm to 75mm including cost of material and cost of labour for stacking, spreading and consolidating layerby layer (Each layernotexceeding100mm) includinghirecharges of Roller etc, complete as per the direction of Departmental officers. | 444 | m3 | - | - |
| 4 | Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base /base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 296 | m3 | - | - |
| 5 | Providing and laying Prime Coat 7Kg/10 M2 With Bitumen Emulsion (Slow Setting) Including Cost of Bitumen emulsion At The Site Including Labour Charges For Preparing The Surface And Applying Required Quantity of Bitumen Emulsion As Prime Coat Using Bitumen Sprayer Etc. Complete Over Wet Mix Macadam As Per Clause 502 of Mort & H Specifications. | 2,956 | m2 | - | - |
| 6 | Providing and laying Tack Coat 2.5 kg/10 m2 with Bitumen Emulsion (Rapid Setting 1) including cost of bitumen emulsion at the site, including labour charges for preparing the surface and applying required quantity of bitumen emulsion as Tack Coat using bitumen sprayer etc., complete over the primed surface as per clause 503 of MoRT& H Specifications Rev.5 | 2,956 | m2 | - | - |
| 7 | Providing and laying Bituminous Concrete30mm thick using 19 – 9.50 mm metal, 9.5-2.36 mm Metal, 2.36 mm and below Metal of specified grading aggregates and Quarry Dust with 37.73 kg of VG30 (60/70grade) bitumen ( Procured from State/ Central Public sector undertakings only) for premixing per 10sq.m including cost and conveyance of all materials to work site and stacking them on road side to standard departmental metric gauge for pre-measurement, heating the bitumen in bitumen boiler heating the aggregates and mixing them with bitumen in mini hot mix plant, spreading the mix in the required temperature for uniform thick of 30mm over a previously prepared surface to specified grade and cross section and compaction by power roller, including labour charges, spreading etc., including Hire charges for machineries etc., complete as per clause 509 of MoRT & H Specifications to achieve the desired compaction. | 119 | m3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
ROADDOC.pdf
Tender Documents • 0.92 MB
BOQ_835328.xls
BOQ • 0.27 MB
ITB.pdf
Additional Documents • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .