Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹32.7 LAccepted-AOC | L 1 | Accepted-AOC L 1 | |
| 2 | L 2₹34.4 L+₹1.6 L (5.03%)Rejected-Finance | L 2 | Rejected-Finance L 2 | |
| 3 | L 3₹37.0 L+₹4.3 L (13.1%)Rejected-Finance | L 3 | Rejected-Finance L 3 |
Tender Value
₹38.5 L
EMD Value
₹77,000
Closing Date
25 Jan 2022, 5:00 pmClosed
Chief Engineer (EMIT)
3rd Floor, V.S. Bhavan, Anushaktinagar, Mumbai - 400094
Annual contract for Operation and Comprehensive maintenance of MBBR based Sewage Treatment Plant, STP of 1.5 MLD, 0.75 MLD X 2 Nos. and associated works at western Sector, Anushaktinagar, Mumbai.
2022_DCSEM_668143_1
DCSEM/CQD/QSC/ STP-WS-AMC/NIT/27/21-22 dtd 13.01.
Open Tender
Civil Works - Others
Works
365 days
Anushaktinagar, Mumbai
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹77,000
Yes
17 Oct 2022
14 Jan 2022
27 Jan 2022
14 Jan 2022
25 Jan 2022
14 Jan 2022
14 Jan 2022 - 20 Jan 2022
Amount
PART-A: PLANT OPERATION & ASSOCIATED WORKS
PART-B: COMPREHENSIVE MAINTENANCE & ASSOCIATED WORKS
PART-C: ASSOCIATED WORKS OF STP
Description of Work / Item(s)
Amount
PART-A: PLANT OPERATION & ASSOCIATED WORKS
Operation of 1.5 MLD (0.75 MLD x 2 Nos) MBBR technology based Sewage Treatment Plant (STP) of M/s. Ion Exchange (I) Ltd. at western sector in daily three shifts i.e. 24x7x365 days basis for Twelve months as per schedule. The work shall be completed as per Clause no. 2 of Schedule I of Technical Specifications.
Supply of Sodium hypo chloride solution ( 10% to 15% concentration of Chlorine) at required proportion as per instruction of EIC.
Description of Work / Item(s)
Amount
PART-B: COMPREHENSIVE MAINTENANCE & ASSOCIATED WORKS Important Notes: Please refer Clause no. 3 of Schedule I of Specifications
Comprehensive maintenance of Pump set as per clause no. 4 of Schedule I of specifications.
Raw sewage pump ( 4 Nos. x 4 times in one year)
CISF U/G Flushing tank Pumps ( 2 Nos. x 4 times in one year)
Overhead Flushing tank Pumps ( 2 Nos. x 4 times in one year)
Gardening Pump ( 3 Nos. x 4 times in one year)
Filter Feed Pumps ( 4 Nos. x 4 times in one year)
Sludge Transfer Pump ( 4 Nos. x 4 times in one year)
Screw Pump ( 2 Nos. x 4 times in one year)
Chlorine dosing pump ( 2 Nos. x 4 times in one year)
Poly Dosing Pump ( 1 No. x 4 times in one year)
Dewatering Pump ( 1 No. x 4 times in one year)
Comprehensive maintenance of Air Blowers as per clause no. 5 of Schedule I of specifications.
Air Blower for equilisation & Sludge Holding tanks ( 2 Nos. x 4 times in one year)
Air Blower for MBBR tanks ( 4 Nos. x 4 times in one year)
Comprehensive maintenance of Filter Press as per clause no. 6 of Schedule I of specifications.
Filter Press with motor ( 1 No. x 4 times in one year)
Comprehensive maintenance of Ozonator (Ozone Generating Equipment) as per clause no. 7 of Schedule I of specifications.
Ozonator sets ( 2 Nos. x 4 times in one year)
Comprehensive maintenance of (UV) Ultraviolet light as per clause no.8 of Schedule I of specifications.
UV light sets ( 2 Nos. x 4 times in one year)
Pressure sand filter & Activated carbon filter and associated works as per clause no. 9 of Schedule I of specifications.
Pressure sand filter ( 2 Nos. x 4 times in one year)
Activated carbon Filter ( 2 Nos. x 4 times in one year)
Description of Work / Item(s)
Amount
PART-C: ASSOCIATED WORKS OF STP
Carrying out calibration of various types pressure gauges through accredited laboratory including making proper setting for within range indication if required & submitting its original calibration certificate having one year’s validity before due date complete as per site requirement
Collection of incoming sewage & outgoing effluent samples from site on monthly basis, delivery & testing of the same at NABET accredited, MOEF, MPCB or Govt. approved laboratory. Sample testing includes the parameters like PH, COD, BOD, TSS, Oil & grease, Dissolved Oxygen (D.O.) & submission of its original test report before 1st week each next month as per instruction and as directed by Engineer-In-charge (E.I.C.). Note: Sealed container for sample collection is in scope of contractor.
Carrying out complete cleaning of following RCC members of MBBR STP unit by removing all existing excretal, sewage, sludge, debris, muddy water etc. complete by mechanical / manual means and disposal of the same to drying bed of old STP including making required pumping arrangement, lifting, loading, unloading, transportation, taking all safety precautions, removing & refixing of bar screens, carrying out all related works etc. complete as per site requirement and as directed by Engineerin-charge.
Bar screen chembers (RCC chember of size 1.5mX1mX1.3m =1.95 cum)
Oil & grease tank (RCC chember of size 3.1mX2mX4m= 24.8 cum)
Grit tank (RCC chember of size 3.15mX2mX4m= 25.2 cum)
Sewage equalization tank (RCC tank of size 14.3mX9.85mX5m= 700.7 cum)
MBBR Pre-Aeration tank (RCC tank of size 6.6mX0.9mX3.5m= 20.79 cum)
MBBR Aeration tank (RCC tank of size 6.6mX4.6mX2.7m= 81.97 cum)
Pre-lamella tank (RCC tank of size 6.6mX0.6mX2.7m= 10.69 cum)
Lamella tank (RCC tank of size 6.6mX1.5mX2.7m= 26.73 cum)
Chlorine contact tank (RCC tank of size 6.6mX1mX2.35m= 15.51 cum)
Clarified water tank (RCC tank of size 7mX6.3mX5m= 220.5 cum)
Treated water tank (RCC tank of size 10mX8.16mX4.8m= 391.68 cum)
Sludge holding tank (RCC tank of size 6mX2mX3.7m= 44.4 cum)
Supply, installation, testing & commissioning of Air bubble diffuser alongwith membrane made of M/s EDI, USA or equivalent shall consistes of set of EPDM membranes, SS 304 clips, PVC support pipes, PVC fittings, pvc flexible air pipe, nylon rope braided hose with all accessories complete for STP Reactor Aeration Chamber I & II etc. to make it retrievable & to provide clog-free oxygen for aeration tanks as per requirement & as per OEM recommendations. This work includes to carry out complete cleaning of tank to replace damaged diffuser by removing all existing excretal, sewage, sludge, muddy water etc. complete by mechanical / manual means and disposal of the same to drying bed of old STP including making required pumping arrangement, lifting, loading, unloading, transportation, taking all safety precautions, etc. complete as per site requirement & as directed by E.I.C. Type of diffuser: Fine type & Air flow rate : 8 - 12 m3 / hr, Pressure Rating : HDPE/UPVC - 10 kg / cm2 , size of diffuser : 90 mm dia & 1000 mm long & MOC : EPDM. Note: Tank cleaning will be measured & paid seperately as per item no.3.6 of this SOQ.
Supply, installation, testing & commissioning of Air bubble diffuser alongwith membrane made of M/s EDI, USA or equivalent shall consistes of set of EPDM membranes, SS 304 clips, PVC support pipes, PVC fittings, pvc flexible air pipe, nylon rope braided hose with all accessories complete for Equilisation tank & Sludge holding tanks etc. to make it retrievable & to provide clog-free oxygen for aeration tanks as per requirement & as per OEM recommendations. This work includes to carry out complete cleaning of tank to replace damaged diffuser by removing all existing excretal, sewage, sludge, muddy water etc. complete by mechanical / manual means and disposal of the same to drying bed of old STP including making required pumping arrangement, lifting, loading, unloading, transportation, taking all safety precautions, etc. complete as per site requirement & as directed by E.I.C. Type of diffuser: Coarse type & Air flow rate : 4 - 8 m3 / hr, Pressure Rating : HDPE/UPVC - 10 kg / cm2 , size of diffuser : 90 mm dia & MOC : EPDM Note: Tank cleaning will be measured & paid seperately as per item no.3.4 of this SOQ.
Carrying out complete cleaning of lamella clarifier with inclined plate mechanism and attending all noticed issues / deficiencies in all respect including supply & fixing of all required materials/spares/hardwares, carrying out repair or replacement of all worn out / damaged parts /inclined FRP plates, carrying out all related works etc. complete as per site requirement. This work includes to carry out complete cleaning of tank to replace damaged FRP plates by removing all existing excretal, sewage, sludge, muddy water etc. complete by mechanical / manual means and disposal of the same to drying bed of old STP including making required pumping arrangement, lifting, loading, unloading, transportation, taking all safety precautions, etc. complete as per site requirement & as directed by E.I.C. Note: Tank cleaning will be measured & paid seperately as per item no.3.8 of this SOQ.
Supply, installation, testing & commissioning of following items for Ultra voilet light system ( 02 Nos) as directed & as per instruction of EIC. (Make: M/s UV Alfa, Model No. HF8-HD- Flange W/UVM 5000, Auto Wiper Type)
Ballast -270104006
UV lamp - 270134027
Quartz Sleeve - 120207043
Aquatech Engineers
JM Enviro Technologies Pvt. Ltd.
Oxybee solutions Pvt Ltd
JM Enviro Technologies Pvt. Ltd.
Aquatech Engineers
JM Enviro Technologies Pvt. Ltd.
Aquatech Engineers
Oxybee solutions Pvt Ltd
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .