Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹1.2 LAWARDED | AWARDED |
Tender Value
₹1.3 L
EMD Value
₹3,800
Closing Date
11 Aug 2025, 10:30 pmClosed
Directorate of Municipal Administration
Construction of CD and cover slab on RCC drain near the house of retired judge Lohara in Ward No. 16
DMA/2025-26/OW/WORK_INDENT45697
DMA/2025-26/OW/WORK_INDENT45697
Open
Other Works
Electronic Documents, First(One Cover)
DMA Town Municipal Council Hangal
₹500
₹3,800
28 Jul 2025
28 Jul 2025
8 Aug 2025
Construction of CD and cover slab on RCC drain near the house of retired judge Lohara in Ward No. 16
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work
(PWD SR 2021-22 Vol:3 P.NO.17 I.N0 3.1)
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
PProviding and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. ...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to mee...
Pre-Cast Cover Slab
Providing and laying 100mm thick pre-cast cover slabs over drains & Rain pit of width not exceeding 800 mm using M20 concrete reinforced with Micro Alloyed High carbon steel with 3...
As per recommendation of technical working group for formwork shall be added on percentage basis to the finished concrete Centring and shuttering for foundation, sub structure of cross drainages (cons...
As per recommendation of technical working group for formwork shall be added on percentage basis to the finished concrete Centring and shuttering for foundation, sub structure of cross drainages (cons...
As per recommendation of technical working group for formwork shall be added on percentage basis to the finished concrete Centring and shuttering for foundation, sub structure of cross drainages (cons...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .