Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹26.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹26.6 L+₹1,065.28 (0.04%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹26.6 L
EMD Value
₹54,000
Closing Date
14 Sept 2026, 12:30 pmClosed
EE RED LALITPUR
EE RED LALITPUR
Construction of a kitchen at the Atal Residential School in Gram Panchayat Dhaurra.
2026_REDUP_1182801_4
542/RED/NIVIDA/26-27 Dt. 01.07.2026
Open Tender
Civil Works
Percentage
180 days
birdha
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹54,000
29 Sept 2026
7 Sept 2026
14 Sept 2026
7 Sept 2026
14 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing Jungle including uprooting of rank vagetaion grass
bush, wood trees and saplings of girth up to 30cm. Measured at
height of 1 metre above ground level & removel of rubbish pto
a istance of 50 metres outside the periphery of area cleared.
Only Labour | 256 | sqm | 6.19 | ₹1,584.64 |
| 2 | Earth work in excavation by mechanical means (Hydraulic
excavator) / manual means in foundation trenches or drains (not
exceeding 1.5 m in width or 10 sqm on plan), including dressing
of sides and ramming of bottoms, for all lift, including getting out
the excavated soil and disposal of surplus excavated soil as
directed, within a lead of 50 m. All kinds of soil as per SI.No.
2.8.1 | 81.58 | cum | 180.06 | ₹14,689.29 |
| 3 | Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. | 11.58 | cum | 4,712.03 | ₹54,565.31 |
| 4 | RR/CR stone masonary work in 1:6 cement and C/sand in
foundation in plinth including supply of all material labour
T&P etc complete work.as per S.I. 7.6.1 | 38.74 | cum | 5,057.37 | ₹1,95,922.51 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 11.4 | cum | 7,507.25 | ₹85,582.65 |
| 6 | Centering and shuttering including stutting, propping etc. and removal of form. (ii) Column as per SI- 5.9.6 | 83.92 | sqm | 509.39 | ₹42,748.01 |
| 7 | Brick work with common burnt clay machine moulded perforated bricks of class designation 12.5 conforming to IS: 2222 in superstructure above plinth level up to floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) | 45.26 | cum | 6,432.97 | ₹2,91,156.22 |
| 8 | 12mm plaster in 1:4 C:Sand mortar including supply of all material labour T&P etc.(P.W.D. Shedule Item No-17.58) | 429.76 | sqm | 237.71 | ₹1,02,158.25 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.12 | cum | 7,507.25 | ₹15,915.37 |
| 10 | Centering and shuttering including stutting, propping etc. and removal of form. (ii) Column as per SI- 5.9.6 | 36.8 | Sqm | 582.4 | ₹21,432.32 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.26 MB
SBD_546.pdf
Tender Documents • 0.65 MB
BOQ_2224183.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .