| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.5 Cr+₹11.7 L (8.57%)Rejected-AOC | ₹1.5 Cr+₹11.7 L (8.57%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.5 Cr+₹15.8 L (11.5%)Rejected-AOC | ₹1.5 Cr+₹15.8 L (11.5%) | L3 | Rejected-AOC L3 |
| 4 | L4₹1.5 Cr+₹17.2 L (12.6%)Rejected-AOC | ₹1.5 Cr+₹17.2 L (12.6%) | L4 | Rejected-AOC L4 |
| 5 | Not Admitted-Finance | - | - | Not Admitted-Finance Others-Bidder not submitted original affidavit as per clause 11.3, non responsive. Hence, Price Bid may not be Opened. |
| Sl No | Description | Qty | Unit | D S Akbal L1 | Jayakumar L4 | NATARAJAN L3 | Karthikeyan Construction L2 |
|---|---|---|---|---|---|---|---|
| 1.00Strengthening of the Bothakkadu-Devarajapalayam road KM-0/0-3/6 R-100 H/o.Bothakadu | |||||||
| 2.00Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | |||||||
| 3.00 | KM 0/0-3/600 | 4,320 | Sq.m | 5.53 ₹23,889.6 Lowest | 6 ₹25,920 | 6 ₹25,920 | 5.91 ₹25,531.2 |
| 4.00Picking up existing BT surface upto 5 to 10 cm of Old metalled surface, cambering, sectioing of carriageway etc., complete | |||||||
| 5.00 | KM 0/0-3/600 | 4,490.7 | Sq.m | 20.31 ₹91,206.12 Lowest | 23 ₹1,03,286.1 | 23 ₹1,03,286.1 | 20.64 ₹92,688.05 |
| 6.00Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20A | |||||||
| 7.00 | KM 0/0-3/600 | 1,454.96 | Cum | 100.05 ₹1,45,568.75 Lowest | 139 ₹2,02,239.44 | 138 ₹2,00,784.48 | 125 ₹1,81,870 |
| 8.00Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | |||||||
| 9.00 | KM 0/0-1/0 | 223.31 | Cu.m | 531.78 ₹1,18,751.79 | 605 ₹1,35,102.55 | 599 ₹1,33,762.69 | 525 ₹1,17,237.75 Lowest |
| 10.00 | KM 1/0-2/0 | 225 | Cu.m | 540.53 ₹1,21,619.25 Lowest | 615 ₹1,38,375 | 609 ₹1,37,025 | 553 ₹1,24,425 |
Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
20 Feb 2026, 3:00 pmClosed
The Joint Director/ Project Director
DRDA, Dharmapuri
Strengthening of the Bothakkadu-Devarajapalayam road KM-0/0-3/6 R-100 H/o.Bothakadu
2026_RDTN_657311_1
Roc.No.192/2026/R2 NABARD P07
Open Tender
Civil Works
Item Rate
180 days
DRDA
Can be seen in the tender documents
2 documents required · 2 mandatory
₹0
₹1.7 L
23 Jun 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
20 Feb 2026
14 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Strengthening of the Bothakkadu-Devarajapalayam road KM-0/0-3/6 R-100 H/o.Bothakadu | - | - | - | - |
| 2 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | - | - | - | - |
| 3 | KM 0/0-3/600 | - | Sq.m | - | - |
| 4 | Picking up existing BT surface upto 5 to 10 cm of Old metalled surface, cambering, sectioing of carriageway etc., complete | - | - | - | - |
| 5 | KM 0/0-3/600 | 1 | Sq.m | - | - |
| 6 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20A | - | - | - | - |
| 7 | KM 0/0-3/600 | - | Cum | - | - |
| 8 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | - | - | - | - |
| 9 | KM 0/0-1/0 | - | Cu.m | - | - |
| 10 | KM 1/0-2/0 | - | Cu.m | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.94 MB
Technical_Bid_07.pdf
Tender Documents • 0.57 MB
Price_Bid_07.pdf
Additional Documents • 0.49 MB
BOQ_788297.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .