Tender Value
₹4.4 Cr
EMD Value
₹6.7 L
Closing Date
27 Mar 2025, 9:30 pmClosed
Public Works Department
Improvements to Halkundi - Burranayakanahalli (MDR) road from Km 4.00 to 5.50 in Ballari taluk Ballari District under 8443 -CEPMIZ - KMERC Projects for the year 2023-24
PWD/2024-25/RD/WORK_INDENT20271
PWD/2024-25/RD/WORK_INDENT20271
Open
Roads
Two Tender Document System(Two Cover)
PWD Division Office Ballari
₹5,000
₹6.7 L
17 Mar 2025
17 Mar 2025
28 Mar 2025
24 Mar 2025
20 Mar 2025
PAVEMENT CONSTRUCTIONS
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. i) The board will be a composite unit consisting of three plates of Aluminium Composite M...
Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 m3 in volume and stock piling at designated locations and disposal of dismantle...
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable...
Milling of existing Bituminous surface to a specified depth up to 40mm using Milling machine including disposal of removed
material. ---- with all lead, lifts, loading, un-loading charges, including ...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and ---- with all le...
Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on p...
Construction of dry lean cement concrete Sub- base over aprepared sub-grade with coarse and fine aggregate conformingto IS: 383, the size of coarse aggregate not exceeding 25 mm,aggregate cement ratio...
Construction of M40 Grade un-reinforced, dowel jointed,plain cement concrete pavement over a prepared sub base in recommended proportions, coarse and fine aggregate conforming to IS 383:2016, maximum ...
Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constru...
Providing and constructing "WIRE CUT BRICK MACHINEHOLE CHAMBERS" using Portland/Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approved qu...
Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Bituminous Macadam (...
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Materia...
CROSS DRAINAGE WORKS BOX CULVERT 1M X 1M -1 VENT
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever nec...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position Cement Concrete for levelling course for
all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Cod...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machinerie...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machinerie...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
CROSS DRAINAGE WORKS BOX CULVERT 1M X 1M -1 VENT ch 4.30
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever nec...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position Cement Concrete for levelling course for
all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Cod...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machinerie...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machinerie...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Construction of Field Culverts
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position Cement Concrete for levelling course for
all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Cod...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machinerie...
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation,...
CONSTRUCTION OF RCC DRAIN AND ROAD CROSSINGS
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever nec...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position Cement Concrete for levelling course for
all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Cod...
Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2...
Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of m...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machinerie...
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 5th kilometre stone (precast) ---- with all lead, lifts...
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone precast ---- with all lead, li...
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 mt stone precast ---- with all lead, lifts, loadin...
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2
area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC...
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made
of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting v...
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made
of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting v...
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made
of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting v...
Providing and erecting direction and place identification retro reflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick...
Supplying and Fixing of Molded Shank Raised Pavement
Markers / Cat's Eye made of polycarbonate and ABS moulded
body and reflective panels with micro prismatic lens capable of providing total internal...
Utility Shifting Electrical Poles Shifting
RCC pole 9 mtr Long 145 KG WL
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machine...
labour charges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of ...
PSCC pole Mtr long 200 kg WL
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machiner...
labour charges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of ...
LT pin cross arm with clamps bolts nuts and washers for RCC pole 9 mtr long 145 kg WL
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all ...
labour charges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of ...
LT pin cross arm with clamps bolts nuts and washers for RCC pole 9 mtr long 145 kg WL
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all ...
labour charges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of ...
1.1 kv pin insulator with GI pin
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and mach...
No8 stain insulator
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to si...
Guy set complete with No 8 stain insulator and concreting materials
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, trans...
Labour charges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of ...
Rabbit ACSR conductor
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to ...
LABOUR CHARGES ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of ...
Spiral earth electrode
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to...
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site o...
LABOUR CHARGES ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of ...
Anti climbing device ( 12 GI barbed wire ) Lumsusum
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all...
labour CHARGES ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of ...
supervision charges 10 percent ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machine...
Contigency 2 percent ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to si...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .