| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.7 LAccepted-AOC 221 | HARDOI | UTTAR PRADESH | 209869 | ₹72.7 L Quoted ₹74.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹78.2 LRejected-Finance 233 ANAND NAGAR RATAPUR KANPUR UTTAR PRADESH | KANPUR | KANPUR | UTTAR PRADESH | ₹78.2 L | L2 | Rejected-Finance L2 |
| 3 | L3₹82.5 LRejected-Finance 371 BUDHWA TALAB KE PASCHIM SUBHASH NAGAR DIST HARDOI | HARDOI | UTTAR PRADESH | 209869 | ₹82.5 L | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹6.9 L
Closing Date
17 Mar 2026, 12:00 pmClosed
S. E. UNNAO CIRCLE, PWD UNNAO
OFFICE OF S. E. UNNAO CIRCLE, PWD UNNAO
Construction work of missing link Village Pihani-Karawan road to Mahoba to Karawan Farm (Gurudwara) and 5 years maintenance work in District Hardoi.
2026_CEUCZ_1123133_7
1015M/1MT/E-TENDRING/ U.C./25-26 Dt. 28.02.26
Open Tender
Civil Works
180 days
HARDOI
Construction work of missing link Village Pihani-Karawan road to Mahoba to Karawan Farm (Gurudwara) and 5 years maintenance work in District Hardoi.
2 documents required · 2 mandatory
₹2,714
₹6.9 L
Yes
OFFICE OF S. E. UNNAO CIRCLE, PWD UNNAO
6 Apr 2026
11 Mar 2026
17 Mar 2026
11 Mar 2026
17 Mar 2026
11 Mar 2026
13 Mar 2026
Construction of Embankment with Material Obtained from Borrow Pits construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain andfoundation of other structures graded andcompacted to meet requirement of Tables300.1 and 300.2 as per Technical Specification Clause 301.5 Including Labour Cess but Excluding G.S.T.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302. Including Labour Cess but Excluding G.S.T.
Construction of embankment /Patri with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.Including Labour Cess but Excluding G.S.T.
Providing, laying and spreading material on a prepared sub grade, adding cement @ 2% by weight to the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to from a layer of sub-base.Including Labour Cess but Excluding G.S.T.
Providing, laying and spreading material on prepared sub-base, cement @ 4% by weight to the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to from a layer of base. Including Labour Cess but Excluding G.S.T.
Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70kg/sqm usingmannual means .
Providing and applying tack coat with VG_10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared surface cleaned with hydraulic broom . Including cost of Bitumen, Labour Cess but Excluding G.S.T.
Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line ,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat . Including cost of Bitumen, Labour Cess but Excluding G.S.T
Providing and laying seal coat 'C' Type sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall . Including cost of Bitumen, Labour Cess but Excluding G.S.T
H.P Culvert Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302. Including Labour Cess but Excluding G.S.T.
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.Including Labour Cess but Excluding G.S.T.
Laying reinforced cement concrement pipe of 1000 mm dia for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets Including Labour Cess but Excluding G.S.T.
Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600, 1202 & 1203 Including Labour Cess but Excluding G.S.T.
Pointing with Cement Mortar (1:3) on brickwork as per technical specification Clause 613.3 Including Labour Cess but Excluding G.S.T.
Maintenance of constructed road for next five years after the actual date of completion, the contractor shall be paid total maintenance cost as Rs. 746284.54 for five year in the form of installment as below, The payment shall the inclusive of cess but excluding GST. Payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor. (Including Labour cess but Excluding GST) (i) Ist Year zero and 2nd year after the actual date of completion @ 0.75% of total Construction cost
(ii)3rd year @ 1.5% of total Construction cost
(iii) 4th year @ 2.25% of total Construction cost
(iv) 5th year @ 3.0% of total Construction cost
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.21 MB
T21015.pdf
Tender Documents • 1.02 MB
BOQ_2092071.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid