| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.8 CrAdmitted-Finance | ₹27.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹28.8 Cr+₹97.6 L (3.51%)Admitted-Finance | ₹28.8 Cr+₹97.6 L (3.51%) | L2 | Admitted-Finance |
| 3 | L3₹33.4 Cr+₹5.6 Cr (20.3%)Admitted-Finance 0 RAGHAVPUR ORHA TIKAMGARH DISTRICT TIKAMGARH MADHYA PRADESH | TIKAMGARH | TIKAMGARH | MADHYA PRADESH | ₹33.4 Cr+₹5.6 Cr (20.3%) | L3 | Admitted-Finance |
| 4 | L4₹36.3 Cr+₹8.5 Cr (30.6%)Admitted-Finance | ₹36.3 Cr+₹8.5 Cr (30.6%) | L4 | Admitted-Finance |
| 5 | L5₹37.0 Cr+₹9.2 Cr (33.2%)Admitted-Finance | ₹37.0 Cr+₹9.2 Cr (33.2%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | VASU ENTERPRISES L2 | M/s Suresh Chand Gupta L3 | STARCON INFRA PROJECT INDIA PRIVATE LIMITED L6 | siemens construction corporation L5 | Tripatra India Private Limited L1 | GOEL CONSTRUCTIONCO L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Conducting Plot Boundary survey for the proposed area mentioned in the document, including supply and installation of Boundary Marking Stones, including all costs to conduct the survey and submit the complete report - Orai location in the following Areas. Neither deduction in payment nor extra payment will be applicable, if the actual perimeter length and number of boundary stones are different than indicated below. | |||||||||
| 1.10 | a. Area 1
Perimeter - 7.7 km (indicative)
Boundary marking stones - 324 Nos (indicative
b. Area 2
Perimeter - 8.9 km (indicative)
Boundary marking stones - 334 Nos (indicative)
c. Area 3
Perimeter - 9.7 km (indicative)
Boundary marking stones - 250 Nos (indicative)
d. Area 4
Perimeter - 9.8 km (indicative)
Boundary marking stones - 394 Nos (indicative) | 1 | LOT | 11,00,200.11 ₹11,00,200.11 Lowest | 16,50,000 ₹16,50,000 | 42,60,500 ₹42,60,500 | 1,02,30,000 ₹1,02,30,000 | 13,00,000 ₹13,00,000 | 30,00,000 ₹30,00,000 |
| 2.00Conducting Plot Boundary survey for the proposed area mentioned in the document, including supply and installation of Boundary Marking Stones, including all costs to conduct the survey and submit the complete report - Pathrahi location in the following Areas. Neither deduction in payment nor extra payment will be applicable, if the actual perimeter length and number of boundary stones are different than indicated below. | |||||||||
| 2.10 | a. Area 1
Perimeter - 5.4 km (indicative)
Boundary marking stones - 205 Nos (indicative)
b. Area 2
Perimeter - 10 km (indicative)
Boundary marking stones - 670 Nos (indicative)
c. Area 3
Perimeter - 10 km (indicative)
Boundary marking stones - 538 Nos (indicative)
d. Area 4
Perimeter - 3.8 km (indicative)
Boundary marking stones - 270 Nos (indicative)
e. Area 5
Perimeter - 2.7 km (indicative)
Boundary marking stones - 166 Nos (indicative)
f. Area 6
Perimeter - 3.2 km (indicative)
Boundary marking stones - 214 Nos (indicative)
g. Area 7
Perimeter - 16.7 km (indicative)
Boundary marking stones - 705 Nos (indicative)
h. Area 8
Perimeter - 2.7 km (indicative)
Boundary marking stones - 168 Nos (indicative)
i. Area 9
Perimeter - 7 km (indicative)
Boundary marking stones - 346 Nos (indicative) | 1 | LOT | 18,90,200.11 ₹18,90,200.11 Lowest | 27,50,000 ₹27,50,000 | 1,07,39,600 ₹1,07,39,600 | 1,84,50,000 ₹1,84,50,000 | 21,00,000 ₹21,00,000 | 51,00,000 ₹51,00,000 |
| 3.00Construction of Boundary wall, complete, as per drawings. | |||||||||
| 3.10 | a. Orai (Total)
* Area 1
* Area 2
* Area 3
* Area 4 | 36.1 | KM | 28,49,500.11 ₹10,28,66,953.97 | 33,30,000 ₹12,02,13,000 | 39,50,000 ₹14,25,95,000 | 34,50,000 ₹12,45,45,000 | 27,75,000 ₹10,01,77,500 Lowest | 35,50,000 ₹12,81,55,000 |
| 3.20 | b. Pathrahi (Total)
* Area 1
* Area 2
* Area 3
* Area 4
* Area 5
* Area 6
* Area 7
* Area 8
* Area 9 | 61.5 | KM | 28,49,500.11 ₹17,52,44,256.77 | 33,30,000 ₹20,47,95,000 | 39,50,000 ₹24,29,25,000 | 34,50,000 ₹21,21,75,000 | 27,75,000 ₹17,06,62,500 Lowest | 35,50,000 ₹21,83,25,000 |
| 4.00Construction of Gates, complete, as per drawing | |||||||||
| 4.10 | a. Orai | 10 | Nos | 2,70,800.11 ₹27,08,001.1 | 2,00,000 ₹20,00,000 | 3,75,000 ₹37,50,000 | 2,00,000 ₹20,00,000 | 1,50,000 ₹15,00,000 Lowest | 3,50,000 ₹35,00,000 |
| 4.20 | b. Pathrahi | 14 | Nos | 2,70,800.11 ₹37,91,201.54 | 2,00,000 ₹28,00,000 | 3,75,000 ₹52,50,000 | 2,00,000 ₹28,00,000 | 1,50,000 ₹21,00,000 Lowest | 3,50,000 ₹49,00,000 |
Tender Value
₹40.3 Cr
EMD Value
₹60 L
Closing Date
11 Jul 2025, 5:30 pmClosed
General Manager (Civil Contracts-I)
Room No. 218, 2nd Floor, Jyoti Sadan, NHPC OFFICE COMPLEX, Sector-33, Faridabad-121003, Haryana, India
Works of Boundary survey and marking, Gates chain link fencing of PSS with compound walls and gates all around the periphery of 2x 300MW (Phase-II) Solar Power Park for the development of 1200MW Jalaun Solar Power Park at Pathrahi and Amrod in Jalaun
2025_NHPC_864157_1
NH/CCW/CC-I/CO-395/BSUL/ PR/JSP/2025-26/20
Open Tender
Civil Works
Item Rate
350 days
Jalaun, Uttar Pradesh
As per tender document
8 documents required · 8 mandatory
₹5,000
NHPC Limited
₹60 L
Yes
12 Jan 2026
12 Jun 2025
17 Jul 2025
12 Jun 2025
11 Jul 2025
14 Jun 2025
Amount
Conducting Plot Boundary survey for the proposed area mentioned in the document, including supply and installation of Boundary Marking Stones, including all costs to conduct the survey and submit the complete report - Orai location in the following Areas. Neither deduction in payment nor extra payment will be applicable, if the actual perimeter length and number of boundary stones are different than indicated below.
a. Area 1 Perimeter - 7.7 km (indicative) Boundary marking stones - 324 Nos (indicative b. Area 2 Perimeter - 8.9 km (indicative) Boundary marking stones - 334 Nos (indicative) c. Area 3 Perimeter - 9.7 km (indicative) Boundary marking stones - 250 Nos (indicative) d. Area 4 Perimeter - 9.8 km (indicative) Boundary marking stones - 394 Nos (indicative)
Conducting Plot Boundary survey for the proposed area mentioned in the document, including supply and installation of Boundary Marking Stones, including all costs to conduct the survey and submit the complete report - Pathrahi location in the following Areas. Neither deduction in payment nor extra payment will be applicable, if the actual perimeter length and number of boundary stones are different than indicated below.
a. Area 1 Perimeter - 5.4 km (indicative) Boundary marking stones - 205 Nos (indicative) b. Area 2 Perimeter - 10 km (indicative) Boundary marking stones - 670 Nos (indicative) c. Area 3 Perimeter - 10 km (indicative) Boundary marking stones - 538 Nos (indicative) d. Area 4 Perimeter - 3.8 km (indicative) Boundary marking stones - 270 Nos (indicative) e. Area 5 Perimeter - 2.7 km (indicative) Boundary marking stones - 166 Nos (indicative) f. Area 6 Perimeter - 3.2 km (indicative) Boundary marking stones - 214 Nos (indicative) g. Area 7 Perimeter - 16.7 km (indicative) Boundary marking stones - 705 Nos (indicative) h. Area 8 Perimeter - 2.7 km (indicative) Boundary marking stones - 168 Nos (indicative) i. Area 9 Perimeter - 7 km (indicative) Boundary marking stones - 346 Nos (indicative)
Construction of Boundary wall, complete, as per drawings.
a. Orai (Total) * Area 1 * Area 2 * Area 3 * Area 4
b. Pathrahi (Total) * Area 1 * Area 2 * Area 3 * Area 4 * Area 5 * Area 6 * Area 7 * Area 8 * Area 9
Construction of Gates, complete, as per drawing
a. Orai
b. Pathrahi
VASU ENTERPRISES (BID ID -3245843)
M/s Suresh Chand Gupta (BID ID -3245992)
GOEL CONSTRUCTIONCO (BID ID -3246680)
siemens construction corporation (BID ID -3246660)
STARCON INFRA PROJECT INDIA PRIVATE LIMITED (BID ID -3243032)
stage.html
html • 0.04 MB
techsummary_908679.pdf
BOQ Comparative Chart
xlsx
cancelled_1.pdf
pdf • 0.81 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.12 MB
BOQ_908679.xls
BOQ • 0.32 MB
TenderDocFinal_Compressed.pdf
Tender Documents • 6.32 MB
BOQ.xls
BOQ • 0.32 MB
Tenderdocument.pdf
Tender Documents • 6.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .