Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.8 CrAccepted-Finance MANSINGHDIH BENGABAD GIRIDIH JH 815312 | GIRIDIH | JHARKHAND | 815312 | ₹3.8 Cr | L-1 | Accepted-Finance Financial Bid L-1 |
| 2 | L-2₹4.1 Cr+₹23.2 L (6.03%)Rejected-Finance DHANBAD MUNICIPAL CORPORATION DHANBAD | ₹4.1 Cr+₹23.2 L (6.03%) | L-2 | Rejected-Finance Financial Bid |
| 3 | L-3₹4.3 Cr+₹44.9 L (11.7%)Rejected-Finance | ₹4.3 Cr+₹44.9 L (11.7%) | L-3 | Rejected-Finance Financial Bid |
Tender Value
₹4.7 Cr
EMD Value
₹9.3 L
Closing Date
15 Jul 2024, 5:00 pmClosed
Executive officer
nrep, giridih
Construction of Outdoor Stadium at Bengabad under Bengabad Block.
2024_NREPG_87973_1
NREP/GIRIDIH/6/2024-25_Gr.-1
Open Tender
Civil Works - Buildings
Percentage
450 days
Nrep Giridih
Please refer tender documents
2 documents required · 2 mandatory
₹10,000
₹9.3 L
11 Mar 2026
9 Jul 2024
18 Jul 2024
9 Jul 2024
15 Jul 2024
9 Jul 2024
Amount
Synthetic Sports flooring For Outdoor Running Track use STEP-BY-STEP CONSTRUCTION PROCEDURE FOR ACRYLIC RUNNING TRACK PREPARATION: 1. Earth Work in Excavation Description: • Task: Excavate running track trenches in ordinary soil 110mm (wide classification of soil item-A) and dispose of the excavated earth. • Process: o Excavation: Use suitable equipment (e.g., backhoe or excavator) to dig trenches according to the design specifications. o Depth and Width: Ensure trenches are excavated to the required depth and width. o Debris Removal: Remove roots of trees, shrubs, and other debris from the trenches. o Earth Disposal: Transport the excavated earth to a designated area up to 5 meters away. o Leveling and Ramming: Level and ram the foundation trenches to create a smooth, stable surface. 2. Construction of Granular Sub-Base Description: • Task: Construct a 50mm granular sub-base using coarse graded material. • Process: o Material: Use coarse graded material @ 1.28 m³/m³. o Spreading: Spread the material in uniform layers with a motor grader on the prepared surface. o Mixing: Mix the material in place using a rotavator at Optimum Moisture Content (OMC). o Compaction: Compact the material with a vibratory roller to achieve the desired density, as per MORT&H specification 401 (5th revision). 3. Wet Mix Macadam (Plant Mix Method) Description: • Task: Provide, lay, spread, and compact graded stone aggregate for wet mix macadam (50mm specification). • Process: o Premixing: Premix the material with water at OMC in a mechanical mix plant. o Transportation: Transport the mixed material by tipper to the site. o Laying: Lay the material in uniform layers with a paver in sub-base/base course on a well-prepared surface. o Compaction: Compact the material with a vibratory roller to achieve the desired density. 4. Providing and Applying Primer Coat Description: • Task: Apply a primer coat with SS1 grade bitumen emulsion on the prepared surface of the granular base. • Process: o Surface Preparation: Clear the road surface. o Spraying: Spray the primer at the rate of 0.70 kg/sqm using mechanical means. 5. Tack Coat on Bituminous Surfaces (2 Times) Description: • Task: Apply tack coat with bitumen emulsion on the prepared bituminous surface. • Process: o Cleaning: Clean the bituminous surface with a mechanical broom. o Application: Apply the tack coat using an emulsion pressure distributor at the rate of 0.20 kg per sqm. 6. Providing and Laying Dense Graded Bituminous Macadam Description: • Task: Provide and lay dense graded bituminous macadam (25mm) using crushed aggregates. • Process: o Material: Use crushed aggregates of specified grading, premixed with bituminous binder @ 4.0% by weight of the total mix and filler. o Transportation: Transport the hot mix to the work site. o Laying: Lay the mix with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment. o Rolling: Roll with smooth wheeled, vibratory, and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 7. Providing and Laying Bituminous Concrete Description: • Task: Provide and lay bituminous concrete (30mm) using crushed aggregates. • Process: o Material: Use crushed aggregates of specified grading, premixed with bituminous binder @ 5.2% by weight of the mix and filler. o Transportation: Transport the hot mix to the work site. o Laying: Lay the mix with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment. o Rolling: Roll with smooth wheeled, vibratory, and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507. 8. Preparation Surface Inspection • Inspect Bitumen Base: Ensure the bitumen track is clean, dry, and free from cracks or other damage. • Repair Base: Repair any cracks, holes, or imperfections in the bitumen surface to create a smooth, even base. Cleaning • Cleaning Surface: Clean the surface thoroughly to remove dust, debris, and Pressure washing is recommended. 9. Primer Application Primer Layer • Primer Application: Apply a suitable primer to the bitumen surface to enhance adhesion of the subsequent layers. Use a brush, roller, or spray equipment as per manufacturer’s instructions. • Curing: Allow the primer to cure as per the specified time. 10. Cushion Layers First Cushion Layer (Dense Cushion) • Material Preparation: Mix the dense cushion material as per manufacturer instructions. • Application: Apply the first layer of dense cushion using a squeegee or trowel. Ensure an even, uniform layer. • Curing: Allow the layer to cure completely before proceeding to the next layer. Second Cushion Layer (Dense Cushion) • Application: Apply the second layer of dense cushion over the first, ensuring uniform thickness and coverage. • Curing: Allow this layer to cure thoroughly. Third Cushion Layer (Fine Cushion) • Material Preparation: Mix the fine cushion material as per manufacturer instructions. • Application: Apply the first layer of fine cushion over the dense cushion layers. Ensure a smooth, even surface. • Curing: Allow the layer to cure completely. Fourth Cushion Layer (Fine Cushion) • Application: Apply the second layer of fine cushion over the first fine cushion layer, ensuring uniformity. • Curing: Allow this layer to cure thoroughly. 11. Acrylic Color Layers First Color Layer • Material Preparation: Mix the acrylic color material as per manufacturer instructions. • Application: Apply the first color layer using a squeegee or roller. Ensure an even, consistent application. • Curing: Allow this layer to cure completely. Second Color Layer • Application: Application: Apply the second color layer over the first. Ensure a uniform color and coverage. • Curing: Allow this layer to cure thoroughly. Third Color Layer • Application: Apply the third color layer over the second. Ensure a smooth, consistentfinish. • Curing: Allow this layer to cure completely. 12. Resurface Layer Resurface Layer • Material Preparation: Mix the resurface material as per manufacturer instructions. • Application: Apply the resurface layer over the cured color layers using a squeegee or roller. Ensure a uniform, smooth surface. • Curing: Allow the resurface layer to cure thoroughly. 13. Line Marking Game Line Marking • Measurement and Layout: Measure and layout the game lines according to the standard dimensions and specifications. • Masking: Use masking tape to define the lines accurately. • Painting: Apply the line marking paint using a brush or roller. Ensure crisp, clear lines. • Drying: Allow the paint to dry completely before removing the masking tape. 14. Final Inspection and Quality Control Inspection • Inspect Surface: Check the entire surface for uniformity, smoothness, and adhesion of all layers. • Quality Control: Ensure all lines and markings are precise and meet the required standards. Safety Check • Safety Inspection: Conduct a safety inspection to ensure there are no hazards or imperfections. 15. Maintenance Plan Regular Maintenance • Cleaning: Regularly clean the track to remove debris and maintain surface quality. • Repairs: Promptly repair any damage to the surface to prevent further deterioration. By following these steps meticulously, you can ensure the successful construction of an 8- layer acrylic running track that meets high standards of quality, performance, and safety.
Add GST @ 18%
Add L.Cess @ 1%
Bidder Name
Amount
Manish Kumar Singh (GSTN-20DIZPS4212Q1ZJ) BID ID -604221
UMESH KUMAR SINGH (GSTN-20AGKPS5585N1ZQ) BID ID -605135
Basant Kumar Rai (GSTN-20AFPPR3753K1Z4) BID ID -605139
UMESH KUMAR SINGH
Basant Kumar Rai
UMESH KUMAR SINGH
Basant Kumar Rai
stage.html
html • 0.05 MB
technical_118407.pdf
techsummary_118407.pdf
finance_118407.pdf
BOQ Comparative Chart
xlsx
finsummary_118407.pdf
cancelled_1.pdf
pdf • 2.85 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
SBD.pdf
Tender Documents • 0.81 MB
BOQ_118407.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .