Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.7 LAccepted-AOC | L1 | Accepted-AOC Being a lowest | |
| 2 | L2₹38.3 L+₹64,625 (1.72%)Rejected-Finance | L2 | Rejected-Finance Not a lowest tender | |
| 3 | L3₹44.8 L+₹7.2 L (19.0%)Rejected-Finance | L3 | Rejected-Finance Not a lowest tender | |
| 4 | L4₹47.1 L+₹9.4 L (25.1%)Rejected-Finance | L4 | Rejected-Finance Not a lowest tender | |
| 5 | L5₹48.8 L+₹11.1 L (29.6%)Rejected-Finance | L5 | Rejected-Finance Not a lowest tender |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
1 Jun 2023, 6:00 pmClosed
GE AF TA Gwalior
GE AF TA Gwalior 474020
COMPREHENSIVE MAINTENANCE OF AHU, COOLING TOWERS OF DIFFERENT CAPACITY INCLUDING OUTSOURCING SERVICES FOR MANNING AND OPERATION OF CENTRAL AC PLANTS AT WSA AND TECH FLT OF AFS GWALIOR
2023_MES_594460_1
8900/1499/GWL/E8
Open Tender
Miscellaneous Works
Item Rate
335 days
AF STN Gwalior
As per tender documents
7 documents required · 7 mandatory
₹500
GE AF TA Gwalior
₹98,000
Yes
20 Jun 2023
10 May 2023
5 Jun 2023
10 May 2023
1 Jun 2023
19 May 2023
Amount
Outsourcing of services for operation of Central AC plants, DG sets & water supply installations round the clock everyday from Monday to Sunday, using one operator (SKILLED) in each shift (i.e. 03Shifts in 24 Hours, each shift of 8 hours) with the operation of following plants/Equipments etc at Bump Dump & WSA under Air Force Station Gwalior:- (A) Central AC Plant Chilled water Type of Capacity 2 x 26 TR Working and 01 x 26 TR standby at Bomb Dump and Central AC Plant Chilled water Type of Capacity 2 x 38 TR Working and 01 x 38 TR stand by at WSA (Bomb Dump) and Central AC plant chilled water type of capacity 2x11 TR working and 01 x 11 TR stand by at new Bomp Dump :- (i) 26 TR, 38 TR and 11 TR capacity chiller unit complete comprising of Scroll compressors with Condensers etc., and incl LT Panel with Starters - 09 Sets. (ii) Chilled water/condenser water circulating Mono block pump with electric motor Capacity 7.5 HP - 08 Sets (iii) FRP induced draft cooling tower of 80 TR and 66 TR capacity - 02 Sets (iv) Air Handling unit complete of 6000 CFM, 8000 CFM and 14000 CFM capacity electric blower motor – 05 Nos. (v) Humidification pump complete driven by electric motor & starter- 02 Nos. (vi) LT Control panel comprising starters of all connected equipments of AC plants - 03 Sets (vii) Standby DG Set of 125 KVA capacity including control panels – 01 Set (viii) Standby DG Set of 160 KVA capacity including AMF panels – 01 Set (ix) ON/OFF of street light control panel installed in front of bomp dump gate. (x) Hot water Generator set capacity of 36 KW and 2x30 KW - 03 Sets (xi) Hot water mono block pump set capacity 3HP and 1.5HP - 06 Sets (xii) Chilled water/condenser water circulating Mono block pump with electric motor Capacity 5 HP - 04 Sets (B) Water supply Installation (i) Operation of submersible pump set with panel capacity 15 HP - 01 Set at bump dump pump house and maintain daily log sheet all as directed. (ii) Operate control valves for distribution/rising water supply pipe line to over head tank - 01 Set (iii) Operation of chlorine plant at bomp dump pump house and maintain chlorine levels as directed and maintain record of chlorination properly all as directed by Engr-in-Charge.
Outsourcing of services for operation of Central AC plants & DG sets round the clock everyday from Monday to Sunday, using one operator (SKILLED) in each shift (i.e. 03Shifts in 24 Hours, each shift of 8 hours) with the operation of following plants/Equipments etc at Tech Flt under Air Force Station Gwalior:- (A) Central AC Plant Chiller type of Capacity 2 x 75 TR working and 01 x 75 TR Standby at Tech FLT :- (i) (i) 75 TR capacity chiller unit complete comprising of scroll compressors with Air cooled condensers etc including LT panel with starters - 3 Sets (ii) Chilled water circulating mono block Pump with electric motor 7.5 HP - 03 Nos. (iii) Hot water generator 170 KW - 01 No. (iv) Hot water pump set 5 HP - 02 Nos. (v) Air handling unit 17500 CFM-03 Nos. (vi) LT control panel comprising of starters of all connected equipments - 04Nos (vii) DG Set 500 KVA including AMF panel & LT panel - 01 Set (viii) ON/OFF of street lights (B) Water supply Installation (i) Operation of submersible pump set with panel capacity 17.5 HP - 01 Set at C Flt pump house and maintain daily log sheet all as directed. (ii) Operate control valves for distribution/rising water supply pipe line to over head tank - 01 Set (iii) Operation of chlorine plant at C Flt pump house and maintain chlorine levels as directed and maintain record of chlorination properly all as directed by Engr-in-Charge.
Outsourcing of services for operation of DG sets & Air compressor round the clock everyday from Monday to Sunday, using one operator (SKILLED) in each shift (i.e. 03Shifts in 24 Hours, each shift of 8 hours) with the operation of following plants/Equipments etc at CR & SS under Air Force Station Gwalior :- (A) DG Sets Installations & Air Compressors:- (i) DG Set 250 KVA including LT panel - 01 Set (ii) Air compressor unit with refrigerant based Dryer and receiver 10 bar pressure, 2.8cum/Hr (Make:- Ingresol Rand ) - 02 Nos.
Note For Item No. 01 To 03 (i) Contractor shall maintain adequate temperature and relative humidity as per design parameter of each AC Plant. (ii) Cleaning of complete AC plant, Pre metallic filters, cooling towers & surrounding area is also contractor`s responsibility. (iii) Checking of electric connections of all components, refrigerant gas leakage, rectification and recharge of refrigerant gas, checking of complete AC plant & checking of LP, HP & Oil pressure. (iv) Replacement of minor parts such as Flair nuts, LT cable joints with suitable size lugs are contractor’s responsibility. (v) Payments shall be made as per minimum labour wages latest fixed by State Govt/Central Govt whichever is higher. (vi) The quoted rate of bidder shall not be less than minimum fair wages fixed by State Govt/Central Govt (whichever is higher) including GST, LWC, EPF, ESIC etc as applicable, if quoted rate of bidder is lesser than a complete detailed justification for the same shall be uploaded in cover-I. (vii) FOL, refrigerant gas and lubricants shall be issued by the department store yard under Schedule ‘B’ free for filling and it will be the contractors responsibilities for filling of oil / lubricant in to fuel tank of DG sets all as specified & directed and empty containers shall be returned by the contractor to the MES store under GE AF TA Gwalior. (viii) It will be the contractor’s responsibility to operate the DG sets, panels and distribution system to maintain the smooth function of installation round the clock. (ix) It will be the contractor’s responsibility to operate the pumps, panels and distribution system to maintain the user’s requirement round the clock. (x) All operator shall be ITI holder or minimum 3 years of work experience. (xi) All operator will wear proper uniform as approved by GE. (xii) For panel recovery on account of non-operation of installation/absent of operators from duty, the recovery amount shall be calculated @ double of rate of minimum fair wages of operator and shall be recovered from the due payments.
(xiii) All tradesmen shall be individually life insured. The insurance certificate shall be kept on record. Qualification/Experience certificate of the employed tradesmen shall be kept on record. (xiv) Stationery for operation of installation shall be contractors responsibility (Daily Log Sheet, Attendance register, Wages Register, Routine maintenance Register) (xv) Log sheets shall be submitted weekly by contractor. (xvi) Operator shall carry out routine checkup likely battery & radiator water level and will maintain it, if any abnormal noise/fault seems in DG set, operator will immediately inform to concern JE E/M or Engineer-in- Charge.(A record in this regard shall be responsibility of the contractor ). (xvii) The same operator will operate the pump/panel & distribution system to maintain the user's requirement round the clock. (xviii) Contractor submit the nominal roll of persons to be employed alongwith qualification/experience certificates, Police verification identification certificate to Engineer-in-Charge before deployment of the staff. (xix) Contractor will submit nominal roll within 10 days of acceptance of contract and qualification and experience certificate of tradesmen to Engr-in-charge for approval of GE before commencement of the work. (xx) Every tradesmen should have his own valid identity card for being Indian citizen. (xxi) All provisions contained in various Labour Laws/Acts and IAFW 2249 as amended from time to time are meticulously followed. (xxii) The operator will maintain record of log sheet & connected register as directed by Engr-in-Charge and to be produce at the end of month, failing which a penalty of Rs. 3000/- per month will be recovered from the contractor till production of relevant record. (xxiii) Cleaning of workplace instrument/machinery/rest room shall be responsibility of contractor.
Comprehensive Annual Maintenance and break down attendance of DG sets for eleven months as mentioned here in after including periodical services, B-Check falls during currency of contract and preventive maintenance checks as directed by the Engr-in-charge installed at Bomb Dump , WSA, Tech Flight, CR&SS, and 24 End. Comprehensive Annual Maintenance for eleven months and break down attendance of central Air conditioning plant (High Side & Low Side) as mentioned here in after. All checks and periodical services and preventive maintenance of plants as specified and recommended by the respective manufacturers in addition if any installed at Bomb Dump, WSA, Tech Flight, CR&SS complete with replacement of defective parts during breakdowns, consumables and necessary tools & plants as required etc. DG Sets :- (a) DG Set 125 KVA , 3 Phase , with AMF Panel - 01 No. (b) DG Set 160 KVA, 3 Phase, with AMF Panel - 01 No. (c) DG Set 250 KVA, 3 Phase, with AMF Panel - 01 No (d) DG Set 40 KVA, 3 Phase, with AMF Panel - 01 No Central AC Plants:- (A) Central AC Pant chilled water type of capacity 2 X 26 TR working and one 1 X 26 TR std by with following equipments.(WSA) a) Condenser motor and mono block pump 7.5 HP – 04 Nos b) FRP cooling tower complete 60 TR – 01 Nos c) 13 TR Scroll Compressor – 06 Nos d) AHU Capacity – 6000 CFM – 03 Nos e) AHU motor 3HP – 02 Nos f) Hot Water Generator 30 KW – 02 Nos g) Hot water pump motors capacity 3 HP – 02 Nos h) Electrical 3 pole power contactors of different capacity from 12 to 40 Amp and relays 9 to 12 Amp with timers and NONC. h) Chilled water pipe lines of different sizes with insulation, ducts and diffuers. (B) Central AC Pant chilled water type of capacity 2 X 38 TR working and one 1 X 38 TR std by with following equipments(WSA) a) Condenser motor and mono block pump 7.5 HP – 04 Nos b) FRP cooling tower complete 66 TR – 01 Nos c) 13 TR Scroll Compressor – 12 Nos Contd../-
d) AHU Capacity – 14000 CFM – 03 Nos e) AHU motor 7.5HP – 02 Nos f) Hot Water Generator 36 KW – 01 Nos g) Hot water pump motors capacity 3 HP – 02 Nos h) Electrical 3 pole power contactors of different capacity from 12 to 40 Amp and relays 9 to 12 Amp with timers and NONC i) Chilled water pipe lines of different sizes with insulation, ducts and diffusers. C) Central AC Pant chilled water type of capacity 2 X 11 TR working and one 1 X 11 TR std by with following equipments(Bomb Dump New) a) Condenser motor and mono block pump 5 HP – 04 Nos b) FRP cooling tower complete 30 TR – 01 Nos c) Cooling tower return 2 HP motor – 01 Nos c) 5.5 TR Scroll Compressor – 06 Nos d) AHU Capacity – 8000 CFM – 02 Nos e) AHU motor 3 HP – 01 Nos f) Hot Water Generator 30 KW – 01 Nos g) Hot water motor and pump 2 HP – 02 Nos h) Electrical 3 pole power contactors of different capacity from 12 to 40 Amp and relays 9 to 12 Amp with timers and NONC h) Chilled water pipe lines of different sizes with insulation, ducts and diffusers. D) Central AC Pant Air Cooled type of capacity 2 X 75 TR working and one 1 X 75 TR std by with following equipments(C-Flight) a) Condenser motor and mono block pump 10 HP – 04 Nos b) FRP cooling tower complete 30 TR – 01 Nos c) Fan Moto with blade 3 HP – 12 Nos c) 19/20 TR Scroll Compressor – 12 Nos d) AHU Capacity – 18000 CFM – 03 Nos e) AHU motor 12.5 HP – 03 Nos f) Hot Water Generator 170 KW – 01 Nos g) Hot water motor and pump 17.5 HP – 02 Nos h) Electrical 3 pole power contactors of different capacity from 12 to 40 Amp and relays 9 to 12 Amp with timers and NONC h) Chilled water pipe lines of different sizes with insulation, ducts and diffusers.
(A) NOTE for DG Set under Item No.6 & 7:- 1. The scope of AMC service includes maintenance, serviceability and supply of healthy DG power supply till the point of AMF Panel output switch gear. Beyond the point shall be maintained by MES. The AMC includes 4 No preventive Maintenance schedules and unlimited breakdown calls. The contractor has to replace all the spares including Lubricating oil complete all as specified by OEM. 2. The contractor shall be responsible for critical spares on shelf recommended by OEM or any other agency as approved by GE for uninterrupted serviceability of DG sets.The preventive maintenance Schedule shall include replacement of Engine oil, Fuel Filters, O rings, coolant etc. 3. The Contractor will ensure Quarterly inspection by qualified technician approved by GE and ensure servicing of DG sets as recommended by OEM and report to this effect shall be produced to GE/AGE E/M soon after every inspection. 4. Minor repairs/maintenance or breakdown attendance can be carried out either by OEM or by deploying any skilled technician. However the spares replaced and workman ship must be acceptable to Engr-in-charge during the periodical inspections. 5. All electrical and mechanical spares (Controller card, Display, AMF Panel Spares) including Major and Minor repairs at Engine side and Alternator side is covered in the Comprehensive Maintenance. 6. Replacement of reputed make of Batteries as required at site included in the Comprehensive Maintenance. 7. Maintenance and de-scaling of Radiator, fan belts and painting of DG set with synthetic enamel paint of approved color and writing MES and SM numbers during the currency of the contract is included in the scope of work 8. POL shall be issued from E/M Tech Area Stores under Sch B free for filling only in the DG sets as nad when required. The required transportation is included in the quoted rate. 9. It is the responsibility of the Contractor to ensure smooth and uninterrupted services of DG set round the clock till the user end.
(B) NOTE for AC Plant under Item No.6 & 7:- 1. The AC plants (High Side) shall be inspected and serviced once in 3 months by authorized service engineer of OEM or any other qualified technician approved by GE. A detailed inspection / service report hall be submitted to the Eng-in-Charge after every Visit of technician of the OEM or any other agency as approved by GE. In case of repair/ breakdown, rectification shall be attended & Plant shall be made functional within 48 hours from the time of reporting the complaint in the complaint register specifically maintained for this purpose. Attendance of repairs and servicing of main plant (High end equipment) is to be carried out by technician as approved by GE only. The Maintenance of Low End System to be carried out as per relevant item as described below. Comprehensive Annual Maintenance for eleven months and break down attendance of central air conditioning plant (Low Side) equipment other than mentioned in Item above from AHU to final diffusers including Electrical control panels as mentioned here in after. All checks and periodical services and preventive maintenance and replacement of defective items of plants as specified and recommended by the respective manufacturers. List of tentative jobs to be carried out for complete AC plant is appended below. a) Complete checking and inspection (Quarterly) of Air Handling unit and replacement of Belts, spares of AHU and replacement of damaged insulation, rewinding of electric Motors (Chilled water, Condenser water.AHU, Cooling tower) Contractor has to provide standby spares to ensure continuous operation of the pants till the spare is repaired or rectified. b) All electrical Motors insulation checks if required and as directed by the Engr-in-charge. Replacement of defective Scroll compressors, chilled water pipe lines with all types and sizes of connected valves, chilled water pipe line with insulation, if required shall be replaced which is deemed to be included in the quoted rate. c) No of breakdown calls Unlimited in a 11 Months including 4 nos routine maintenance visits. (Contd.....)
d) Repairs to, or replacement of water piping and all types of valves associated with water piping such as gate valve, globe valve, NRV, modulating and mixing valve, makeup water, expansion tanks, File dampers, Modulating Valves, Motorized fire damper, Balancing valves, including any other equipment including insulation works. e) Main electrical panel components for air-conditioning system if required to be repaired/replaced.. f) Painting of plants, insulations on AHU and Ducts, repairs and replacement of diffusers, on equipments and its associated equipments all as directed by Engr-in-charge. g) Repairs to, or replacement of electrical installation like cabling, switch boards, isolators, Contactors, NONC, PCB , controller cards , Relays and timer panels with associated ammeters and voltmeters complete all as specified. h) Refrigerant Gas hall be issued from E/M Tech Area Stores under Sch B free for filling only in the AC Plants as and when required. The required transportation is included in the quoted rate. i) Minimum 4 Nos of De-scaling schedules for cooling tower and condenser are covered in the AMC as and when required. Replacement of nozzles and fills and cleaning of pipe lines, replacement of valves if required are deemed to be included in the quoted rate. Note:- 1.The payment for Comprehensive Maintenance Item will be paid on Pro-rata basis to the Contractor. 2. Bidder should have experience in terms of Manning/Operation and Maintenance collectively of plant and machinery simultaneously for the same installation set up to be evaluated before financial bidding
M/S YOGANSH CONSTRUCTION CO.
MTR GROUP & COMPANY
Radhe Krishn Engineering
UNIVERSAL AGENCY
M/s Sagar Construction
M/S AUTOMATION AND SWITCHGEAR CONTROL
lodhi builders
Om Electricals
M/S Rakesh Verma
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .