Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.6 LAdmitted-Finance DHOLPUR | RAJASTHAN | 328001 | ₹77.6 L | L1 | Admitted-Finance |
| 2 | L2₹1.0 CrAdmitted-Finance | ₹1.0 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S JAIBIR SINGH L3 | M/S DEV CONSTRUCTION L1 | Ramniwas Contractor L2 |
|---|---|---|---|---|---|---|
| 1.01 | Regular desilting cleaning of existing effluent storm water carrying drainage system all types of section of small(open/covered/box type) drains of Industrial areas The scope of work includes regular cleaning of drains, approaches and cross drainage works (slab/box/hume pipe) upto bed level of the drain, culvert, CD work complete in all respect to ensure the uninterrupted flow in the drainage system of Industrial Area throughout the year. The work also includes proper disposal of Sludge/Silt/ Garbage etc and transportation of the same with all due care to a suitable ultimate disposal site or outside the Industrial area with all lead and lift as per the direction of Engineer in charge. The adjoining sides of the drain should be properly cleaned and dressed after removal of the Sludge/Silt/ Garbage etc as per the scopeof work mentioned in bid document and directions of EIC.
Note: Complete desilting of drains, approaches & CD works shall be done twice in a year. Initially in first 03 months from the date of commencement of work and then after 06 months of initial desilting. However, uninterrupted flow in drains shall be maintained throughout the year. | 1,86,000 | Per Mtr Per year | 41.19 ₹76.6 L | 32.95 ₹61.3 L | 47 ₹87.4 L |
| 1.02 | Desilting cleaning of existing effluent storm water carrying drainage (open big drain / Nallah / disposal drain) of Industrial areas. The scope of work includes regular cleaning of drains upto bed level of the drain complete in all respect to ensure the uninterrupted flow in the drainage system of Industrial Area throughout the year. The work also includes proper disposal of Sludge/Silt/ Garbage etc and transportation of the same with all due care to a suitable ultimate disposal site or outside the Industrial area with all lead and lift as per the direction of Engineer in charge. The adjoining sides of the drain should be properly cleaned and dressed after removal of the Sludge/Silt/ Garbage etc as per the scope of work mentioned in bid document and directions of EIC.
Note: Complete desilting of drains, approaches & CD works shall be done twice in a year. Initially in first 03 months from the date of commencement of work and then after 06 months of initial desilting. However, uninterrupted flow in drains shall be maintained throughout the year | 32,000 | Per Mtr Per year | 88.72 ₹28.4 L | 50.95 ₹16.3 L | 51.51 ₹16.5 L |
Tender Value
₹1.7 Cr
EMD Value
₹3.3 L
Closing Date
30 Apr 2026, 6:00 pmClosed
Senior Regional Manager, RIICO, Bhiwadi Unit-II
RIICO, Bhiwadi Unit-II, Rest House Road, RIICO Chowk, Bhiwadi, Distt. Alwar (Rajasthan)
Cleaning of Storm water drain at I/A Khushkhera, IID Centre Khushkhera, Tapukara and Karoli
2026_RIICO_552967_7
2026-2027/01
Open Tender
Civil Works
730 days
I/A Khushkhera, IID Centre Khushkhera, Tapukara an
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
SSO id of Contractor
₹3.3 L
5 May 2026
20 Apr 2026
1 May 2026
20 Apr 2026
30 Apr 2026
20 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1.01 | Regular desilting cleaning of existing effluent storm water carrying drainage system all types of section of small(open/covered/box type) drains of Industrial areas The scope of work includes regular cleaning of drains, approaches and cross drainage works (slab/box/hume pipe) upto bed level of the drain, culvert, CD work complete in all respect to ensure the uninterrupted flow in the drainage system of Industrial Area throughout the year. The work also includes proper disposal of Sludge/Silt/ Garbage etc and transportation of the same with all due care to a suitable ultimate disposal site or outside the Industrial area with all lead and lift as per the direction of Engineer in charge. The adjoining sides of the drain should be properly cleaned and dressed after removal of the Sludge/Silt/ Garbage etc as per the scopeof work mentioned in bid document and directions of EIC.
Note: Complete desilting of drains, approaches & CD works shall be done twice in a year. Initially in first 03 months from the date of commencement of work and then after 06 months of initial desilting. However, uninterrupted flow in drains shall be maintained throughout the year. | 1,86,000 | Per Mtr Per year | 65 | ₹1,20,90,000 | BI01010001010000000000000515BI0100001113 |
| 1.02 | Desilting cleaning of existing effluent storm water carrying drainage (open big drain / Nallah / disposal drain) of Industrial areas. The scope of work includes regular cleaning of drains upto bed level of the drain complete in all respect to ensure the uninterrupted flow in the drainage system of Industrial Area throughout the year. The work also includes proper disposal of Sludge/Silt/ Garbage etc and transportation of the same with all due care to a suitable ultimate disposal site or outside the Industrial area with all lead and lift as per the direction of Engineer in charge. The adjoining sides of the drain should be properly cleaned and dressed after removal of the Sludge/Silt/ Garbage etc as per the scope of work mentioned in bid document and directions of EIC.
Note: Complete desilting of drains, approaches & CD works shall be done twice in a year. Initially in first 03 months from the date of commencement of work and then after 06 months of initial desilting. However, uninterrupted flow in drains shall be maintained throughout the year | 32,000 | Per Mtr Per year | 66 | ₹21,12,000 | BI01010001010000000000000515BI0100001114 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
stormconditions.pdf
Tender Documents • 0.60 MB
BOQ_985418.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid