| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹91.6 CrAccepted-AOC P 26 CITY CENTER SECTOR 4 BOKARO | L1 | Accepted-AOC L1 Letter No. 3697(S)WE Date-06.09.2024 | |
| 2 | Rejected-Technical | - | Rejected-Technical Non Responsive |
Tender Value
₹97.8 Cr
EMD Value
₹97.8 L
Closing Date
28 Nov 2023, 12:00 pmClosed
Executive Engineer, RCD, Road Division, Giridih
Executive Engineer, RCD, Road Division, Giridih
W,S/ Recons. of Banpura (on Bagodar-Sariya Road, MDR-116) to Gorhar (NH-19) Via Manrokudar Road and Link Road (i) Kadhwar to Ghanghri Road (Length - 3.37 kM.) and (ii) Dondlo link road (Length - 1.155 Km.) (Total Length - 28.795 Km.) (Including Cons
2023_CECOM_77947_1
RCD/GIRIDIH/1431
Open Tender
Civil Works
Item Rate
600 days
Bagodar
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹97.8 L
Chief Engineer(Comm), RCD, Jharkhand Ranchi,Dhurwa
19 May 2025
21 Nov 2023
30 Nov 2023
21 Nov 2023
28 Nov 2023
23 Nov 2023
23 Nov 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.)
By machnical means in area of light jungle | - | Hect | 88,499.5 | - |
| 2 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
Girth from 300 mm to 600 mm | - | Each | 612.7 | - |
| 3 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
Girth from 600 mm to 900 mm | - | Each | 925.6 | - |
| 4 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
Girth from 900 mm to 1800 mm | - | Each | 1,434.8 | - |
| 5 | Dismantling of Cement Concrete Pavement (Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately)
M-15 & M-20 | - | M3 | 442.6 | - |
| 6 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres)
Dismantling Brick / Tile work
In cement mortar | - | M3 | 286.3 | - |
| 7 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres)
Dismantling Stone Masonry
By Mecanical means
Rubble stone masonry in cement mortar | - | M3 | 452.4 | - |
| 8 | Removing all type of hume pipes and stacking within a lead of 1000 metres including earthwork and dismantling of masonry works.
Up to 600 mm dia | - | M | 693.7 | - |
| 9 | Removing all type of hume pipes and stacking within a lead of 1000 metres including earthwork and dismantling of masonry works.
Above 600 mm to 900 mm dia | - | M | 796 | - |
| 10 | Removing all type of hume pipes and stacking within a lead of 1000 metres including earthwork and dismantling of masonry works.
Above 900 mm | - | M | 1,000.5 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_104347.xls
BOQ Document • 0.32 MB
133854695.pdf
Tender Document • 0.46 MB
SBD.pdf
Tender Document • 4.04 MB
133854697.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .