| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC | ₹3.8 L | L1 | Accepted-AOC AOC |
| 2 | L2₹3.9 L+₹7,827.74 (2.07%)Rejected-Finance | ₹3.9 L+₹7,827.74 (2.07%) | L2 | Rejected-Finance STOOD L2 |
| 3 | L3₹3.9 L+₹8,912.28 (2.36%)Rejected-Finance 16 RADHANATH CHOWDHURY ROAD KOLKATA WEST BENGAL 700015 | KOLKATA | WEST BENGAL | 700015 | ₹3.9 L+₹8,912.28 (2.36%) | L3 | Rejected-Finance STOOD L3 |
| Sl No | Description | Qty | Unit | BHATTACHARJEE AIR CONDITIONING L1 | BURDWAN REFRIGARATION SERVICE L2 | RAJ CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling the Following sizes of Split type AC machine carefully by Co. tools & tackles by Scaffolding arrangement for each machine from the nearest base.
i). For 1.0/1.5/2.0 Ton Split type Air Conditioner. | 26 | Each | 950 ₹24,700 Lowest | 960 ₹24,960 | 960 ₹24,960 |
| 2.00 | Transpotation charges for shifting the existing Split type AC machines from the Existing building to the new building loading & unloading at the both end.(Approx 3km) | 26 | Each | 130 ₹3,380 Lowest | 135 ₹3,510 | 135 ₹3,510 |
| 3.00 | Cost of through over-howling and cleaning of the following type of AC's hanging out top of the wall & part by part open of the condenser coil & Cooling coil, body, compressor unit, copper tube & necessary ‘U’ band by through air presser and help of special type chemical, detergent, water, tools, tackles and skilled labor etc. and re-fitting the same. Complete the job in all respect as per direction of E.I.C.
i). For 1.0/1.5/2.0 Ton Split type Air Conditioner. | 26 | Each | 350 ₹9,100 Lowest | 355 ₹9,230 | 355 ₹9,230 |
| 4.00 | Lifting,Shifting,Installation,Testing & Commissioning of IDU & ODU of Split Air Conditioners machines,after making hole in wall on mending good the damages to the original finish as required & necy. scaffolding arrangement, labour cost etc.on both side(IDU & ODU Installation). | 26 | Each | 760 ₹19,760 Lowest | 765 ₹19,890 | 800 ₹20,800 |
| 5.00 | Supply & Fixing of Indoor mounting plate in wall by necessary fastners arrangement. | 26 | Each | 400 ₹10,400 Lowest | 405 ₹10,530 | 405 ₹10,530 |
| 6.00 | Supply & Fixing of Heavy duty metal ODU stand in outer wall by drilling holes & fastners antivibration pad etc. arrangement. | 26 | Each | 1,100 ₹28,600 Lowest | 1,110 ₹28,860 | 1,110 ₹28,860 |
| 7.00 | Supply & Fixing of Copper Refrigeration pipe line for liquid and suction line with fittings, elbows, bends, supports & brackets etc. with 9mm nitrile rubber foam tube with proper insulation aluminium tape rapping is required.
(Make- Ryoku/Totaline/Jobu/ Nippon/EIC Approved).
i)Suction Line (5/8 OD with 0.7mm thick) | 134 | RM | 265 ₹35,510 Lowest | 270 ₹36,180 | 270 ₹36,180 |
| 7.01 | ii)Suction Line (3/8" or 1/2" OD with 0.6 mm thick) | 100 | RM | 155 ₹15,500 Lowest | 160 ₹16,000 | 160 ₹16,000 |
| 7.02 | iii)Liquid Line (1/4" OD with 0.6 mm thick) | 234 | RM | 125 ₹29,250 Lowest | 130 ₹30,420 | 130 ₹30,420 |
| 8.00 | Supply and laying Control copper Cable (PVC insulated & unshethed,un-armoured) from Condensing Unit to IDU control panel (Make: Havells/RR Kable /finolex/EIC Approved )
i)4 core 2.5 sq mm cable. | 234 | RM | 176 ₹41,184 Lowest | 180 ₹42,120 | 180 ₹42,120 |
Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
29 Sept 2025, 6:55 pmClosed
EE.AED.PWD
Office of the Executive Engineer, PWD, Asansol Electrical Division Bijoy Pal Sarani, Opposite to Polo Ground,Asansol 713304, Paschim Bardhaman.
Proposed Construction of Collectorate Complex at Kalyanpur Housing for the office of the District Magistrate, Paschim Bardhaman...Existing Split type AC machine shifting and installation work.
2025_WBPWD_905565_1
WBPWD/EE/AED /eNIQ-20/2025-26
Open Tender
ELECTRICAL WORKS ORG
Item Rate
14 days
ASANSOL
Please refer Tender documents.
4 documents required · 4 mandatory
₹8,000
Office of the Executive Engineer P.W.D. Alsanso
1 Sept 2026
18 Sept 2025
3 Oct 2025
18 Sept 2025
29 Sept 2025
23 Sept 2025
22 Sept 2025
Amount
Dismantling the Following sizes of Split type AC machine carefully by Co. tools & tackles by Scaffolding arrangement for each machine from the nearest base. i). For 1.0/1.5/2.0 Ton Split type Air Conditioner.
Transpotation charges for shifting the existing Split type AC machines from the Existing building to the new building loading & unloading at the both end.(Approx 3km)
Cost of through over-howling and cleaning of the following type of AC's hanging out top of the wall & part by part open of the condenser coil & Cooling coil, body, compressor unit, copper tube & necessary ‘U’ band by through air presser and help of special type chemical, detergent, water, tools, tackles and skilled labor etc. and re-fitting the same. Complete the job in all respect as per direction of E.I.C. i). For 1.0/1.5/2.0 Ton Split type Air Conditioner.
Lifting,Shifting,Installation,Testing & Commissioning of IDU & ODU of Split Air Conditioners machines,after making hole in wall on mending good the damages to the original finish as required & necy. scaffolding arrangement, labour cost etc.on both side(IDU & ODU Installation).
Supply & Fixing of Indoor mounting plate in wall by necessary fastners arrangement.
Supply & Fixing of Heavy duty metal ODU stand in outer wall by drilling holes & fastners antivibration pad etc. arrangement.
Supply & Fixing of Copper Refrigeration pipe line for liquid and suction line with fittings, elbows, bends, supports & brackets etc. with 9mm nitrile rubber foam tube with proper insulation aluminium tape rapping is required. (Make- Ryoku/Totaline/Jobu/ Nippon/EIC Approved). i)Suction Line (5/8 OD with 0.7mm thick)
ii)Suction Line (3/8" or 1/2" OD with 0.6 mm thick)
iii)Liquid Line (1/4" OD with 0.6 mm thick)
Supply and laying Control copper Cable (PVC insulated & unshethed,un-armoured) from Condensing Unit to IDU control panel (Make: Havells/RR Kable /finolex/EIC Approved ) i)4 core 2.5 sq mm cable.
ii).3 core 4.0 sq mm cable.
Supply and laying of 25mm Drain Water piping work out of PVC/HDPE hard pipes of following sizes incl. fiting accessories bends, elbows, tees flanges, tapings, wall sleeves hangers, supports, anchors etc. as required. (Make : Supreme / Astral/ EIC approved).
Supply & Fixing 240 V,25 A, 3 pin Modular type plug top with indicator (North West/Orient) & necy. Connections as required.
Supply & filling of following type refrigerant Gas as per direction of EIC in the existing AC machine. i) R-32
Add GST @18% On total from item no 1 to 11.01.
Add LWC @1% On total from item no 1 to 12.
BURDWAN REFRIGARATION SERVICE (BID ID -6993459)
RAJ CONSTRUCTION (BID ID -7003247)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .