Loading…
Loading…
Tender Value
₹88.5 L
EMD Value
₹1.8 L
Closing Date
8 Jun 2026, 11:00 am4d left
Nodal Officer
e-Procurement Cell, Office of The Executive Engineer, Building Construction Department, Building Division, Deoghar
Construction of Modular OT (EYE) under Sub Divisional Hospital at Madhupur Dist Deoghar for the Year-2025-26.
2026_BCD_114583_2
BCD/EE/04/DEOGHAR/2026-27
Open Tender
Medical Equipments/Waste
90 days
Deoghar
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.8 L
30 May 2026
30 May 2026
9 Jun 2026
30 May 2026
8 Jun 2026
30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1EGP. puff panels for O.T wall walls &ceiling | ||||||
| 1.01 | Supply, installation, testing and commissioning of modular OT Walland corner panels with insulated prefabricated puff Panels. The OT wall shall be constructed using EGP puff panels having 0.8 mm thick GI sheets on both sides. These panels should have been produced in a double band laminator, in which two continuously moving belts carrying 120 GSM galvanized steel sheets of 0.80 mm thickness are firmly bonded together by sprayed -in insulating foam, which hardens during the process. The core consists of rigid polyurethane foam, which has been injected under high pressure, with a minimum density of 40kg/m3. The thickness of Puff shall be minimum 40 mm. The sheet panel shall be of indigenous reputed make and be provided with manufactures test certificate. The puff panel shall be fixed to the floor with bottom track of 1.5 mm thick steel U channel section having min size of 50mm X 50mm. The bottom shall be fixed in the floor of the OT with 10mm thicknessand min. 60 mm long SS fasteners which shall be fully threaded and power drilled. The Panels of walls and ceiling shall be tied together by suitable SS coving. The individual wall panels of wall and ceiling shall be tied together by suitable SS coving. The individual wall panels shall be welded together by SS. All joints shall be filled with metal filler and shall be sand casted on site till smooth finish is obtained. Wall & panel joints shall not be visible after the final wall coating is applied. The gap between the masonry wall surfaces and the panel of the theatre shall be sufficient for | 73.6 | M2 | 1.25 | ₹92 | BI01010001010000000000000515BI0100001114 |
| 2G.I. puff panels for OT ceiling | ||||||
| 2.01 | Modular OT ceiling panels with insulated prefabricated puff Panels. The OT ceiling shall be constructed using GI puff panels having 0.8 mm thick GI sheets on both sides. These panels should have been produced in a double band laminator, in which two continuously moving belts carrying 120 GSM galvanized steel sheets of 0.80 mm thickness are firmly bonded together by sprayed -in insulating foam, which hardens during the process. The core consists of rigid polyurethane foam, which has been injected under high pressure, with a minimum density of 40kg/m3. The thickness of Puff shall be minimum 40 mm. The sheet panel shall be of indigenous reputed make and be provided with manufactures test certificate. The puff panel shall be fixed to the floor with bottom track of 1.5 mm thick steel U channel section having min size of 50mm X 50mm. The bottom shall be fixed in the floor of the OT with 10mm thicknessand min. 60 mm long SS fasteners which shall be fully threaded and power drilled. The Panels of walls and ceiling shall be tied together by suitable SS coving. The individual panels of wall and ceiling shall be tied together by suitable SS coving. The individual wall panels shall be welded together by SS. All joints shall be filled with metal filler and shall be sand casted on site till smooth finish is obtained. Wall & panel joints shall not be visible after the final wall coating is applied. The gap between the masonry wall surfaces and the | 32.59 | M2 | 1.25 | ₹40.74 | BI01010001010000000000000515BI0100001114 |
| 3Antibacterial / Antifungal Paint. | ||||||
| 3.01 | Providing and establishing anti-bacterial & anti fungicidal sterile coating of liquid plastic paint on GI Puff/SS panel of modular OT. The paint should be seamless, easy to clean, should have vapor permeability which allows substrate moisture to escape and protects against growth of bacteria, mound and yeasts, moisture resistance, freeze / thaw resistance. Anti- bacterial anti microbial quality should remain active throughout the life of the product. Vapors permeable structure should allow damp substrates to dry out without causing blistering. It should tolerate cleaning with hospital chemical agents. Filling of all joints and cavities should be with metallic epoxy filler and sand casted flush to provide a joint-less finish. This should include all fittings, accessories, hardware, support structures, etc. required for installation. Anti-bacterial and anti-fungus sterile coating shall be applied on the finished walls & ceiling with at least 2-3 coats to achieve a thickness of minimum 200 micron. Before application of sterile wall coating an appropriate primer shall be applied. The primer shall be supplied along with the paint and should be of the same make as that of paint. and shall be applied prior to coating of anti-bacterial & anti- fungus sterile paint on walls & ceiling 2-3 coats shall be applied to achieve a thickness of 200 | 356.1 | M2 | 1.25 | ₹445.13 | BI01010001010000000000000515BI0100001114 |
| 4Laminar Air Flow | ||||||
| 4.01 | The range of ventilated ceiling should provide the sterility and cleanliness required for OT environ ment. Perfect tightness should be guaranteed by a n epoxy seal between filters and holding structure disabling “by pass†of HEPA filters. Two nos . pressure measurement ports shall be provided in each HousingAirflow: 50 +-10% FPM Class 100/ISO c lass 5 as per international standard & meets DIN 1 946-4. D.O.P. tested point to p oint scanned MINIPLEAT HEPA FILTERS having followi ng technical specifications to be fixed in above H ousings F rame – Aluminium. Type – Flange Type. Media – Micro Fiber Glass . Se aling of media – By means of epoxy. I.P.D. -< 15 mm WG. F.P.D. – 50 mm WG. Separators – Concealed Al. or Hot melt G lue. Capacity – 500 CFM Size of LAF - 2400 x 2400 mmThe work should be executed as per the direction of Enginee r in charge | 1 | Nos | 1.25 | ₹1.25 | 197.49 |
| 5Homogeneous Conductive PVC Vinyl Flooring in O.T.,ICU,OPD. | ||||||
| 5.01 | Providing and fixing 2 mm thick homogeneous conductive PVC JEOFlor Electro + SD Roll acts as a Continous Conductive 10^6 <Rt<10^8. it has Preminum Antistatic Properites, ( <100 V) The Product has to be Groundedwith an ESD Copper Strip( cf. Finishes to meet its full performance The Product is non reactive to residual indentation with a value <0.02 mm. The Flooring is a group Twear Rating Suitableheavey duty Trafficareasand BfI-s1 fire resisteance. The Product is non -emissive of volatile organic compounds with < 10ug/m2 ( TVOC after 28 days ISO 1000-6.Total Thickness EN428 2mm, EN 430 g/sq.m 2900, width 426 cm/lm 200/20, EN (European Standard) EN 685 Classs 34-43, Fire Rating EN1081 0hm 1^^6< RT 10^8 Make JEO Flor ESD Coundictive Flooring | 35.06 | M2 | 1.25 | ₹43.83 | 197.49 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
F2_02.pdf
Tender Documents • 10.31 MB
BOQ_154840.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid