Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96.8 LAccepted-Finance GORAKHPUR | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | ₹96.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹96.9 L+₹9,762.04 (0.10%)Rejected-Finance | ₹96.9 L+₹9,762.04 (0.10%) | L2 | Rejected-Finance L2 |
| 3 | L3₹97.0 L+₹19,524.09 (0.20%)Rejected-Finance | ₹97.0 L+₹19,524.09 (0.20%) | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
27 Jun 2026, 5:00 pmClosed
EE
Nagar Nigam Gorakhpur
Ward number 28 Adhikari bag mein samay Mata long Mata sthan per tiles AVN vibhinn sthanon per RCC nali V CC sadak Nirman.
2026_DOLBU_1162448_1
FFC Ward 28 sn 31
Open Tender
Civil Works
Percentage
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Nagar Nigam Gorakhpur
₹2.0 L
3 Sept 2026
20 Jun 2026
29 Jun 2026
20 Jun 2026
27 Jun 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A | |||||
| 1.01 | Dismantaling of lime and cement mortor work including all complete of work. | 88.53 | Cum | 400 | ₹35,412 |
| 1.02 | Earth work in excavation in foul position soil lead 50mt.& lift 1.5 mt. incl. lab. T&P etc all complete. | 571.5 | Cum | 120 | ₹68,580 |
| 1.03 | Diversion by diesel pump including all complete. | 320 | Hrs | 105 | ₹33,600 |
| 1.04 | P/L of base concrete in 1:6:12 with cement, L-Sand and 40mm S/B including mat. Lab. T&P,etc all complete. | 52.38 | Cum | 4,007 | ₹2,09,886.66 |
| 1.05 | M 150 class brick work in 1:4 with cement &approved Course Sand mortar including supply all material and S.I.N. labor etc. | 99.86 | Cum | 5,817 | ₹5,80,885.62 |
| 1.06 | 12mm thick cement plaster in 1:4 cement mortor with 1 cement and 4 coarse sand including etc. all complete of work. | 482.4 | Sqm | 159 | ₹76,701.6 |
| 1.07 | P/L of CC 1:2:4 top of drain | 11.1 | Cum | 8,186 | ₹90,864.6 |
| 1.08 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (S.I No-289) | 277.46 | Cum | 9,082 | ₹25,19,891.72 |
| 1.09 | M.S. (Tor steel or plain) in plain work such as R.C.C or R.B work Including bending for proper shape as necessary including bending for proper completion of the work and Including supply of all steel & wastage, bend, hooks, and authorised overlapping shall be measured. (S.I-504) | 197.49 | Qtl | 7,690 | ₹15,18,698.1 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.38 MB
BOQ_2178774.xls
BOQ • 0.33 MB
d.pdf
Tender Documents • 2.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .