Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 CrAccepted-AOC H 99 6TH CROSS STREET R M COLONY DINDIGUL | ₹6.7 Cr | L1 | Accepted-AOC work order |
| 2 | L2₹6.8 Cr+₹7.1 L (1.05%)Rejected-Finance MADURAI MADURAI TAMIL NADU | MADURAI | TAMIL NADU | 625001 | ₹6.8 Cr+₹7.1 L (1.05%) | L2 | Rejected-Finance Rejected |
Tender Value
Refer Docs
EMD Value
₹6.0 L
Closing Date
25 Jun 2025, 3:00 pmClosed
The Project Director,DRDA,Dindigul
The Project Director,DRDA,Dindigul
Upgradation Strengthening the Roads 3 Nos in Package No TN05-03 Palani Block of Dindigul District Under SASCI 2025-2026 Roads
2025_RDTN_571642_1
DPIR.No.2866-2025- DATE 06.06.2025
Open Tender
Civil Works
Item Wise
270 days
DRDA
Upgradation Strengthening the Roads 3 Nos in Package No TN05-03 Palani Block of Dindigul District Under SASCI 2025-2026 Roads
3 documents required · 3 mandatory
₹0
₹6.0 L
DRDA,DINDIGUL
4 Aug 2025
20 Jun 2025
25 Jun 2025
20 Jun 2025
25 Jun 2025
20 Jun 2025
20 Jun 2025
Amount
Name of the work : 1.Strengthening of the Road From Eramanaikkenpatty to Manjanaickken patty road Km 0/0-2/4 H/O Eramanaikkenpatty (R88) Estimate amount : Rs.233.50 Lakhs
A. Construction work Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking the existing worn out BT surface hard gneiss, granite,quartz metal 50mm to 100mm thick and repacking the metal to bring the existing surface to camber including leveling and sectioning as indicated by the departmental officer including labour charges for picking tools and equipments employed and all other incidental charges etc., complete as per standard
Collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification..
Providing and laying bituminous Macadam with hout mix plant using crushed aggregates of grading as per Table 500.4 premixed using bitumious binder, transported to site upto lead of 100m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achive the desired compaction as per Technical Specification Clause 504.
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Provision for Km stone, Hm stone,Guardstone,Name board, Logo board and Cautionary sign boards etc.
KM Stone
HM Stone
Provision for 60 cm Equilateral triangle cautionary sign board
B. Construction of 1.50m RCC Slab culvert @ Ch 75m
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
1.50m RCC Slab Culvert
Providing and laying for plain cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
1.50m RCC Slab Culvert
Providing and laying for plain cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
1.50m RCC Slab Culvert
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
1.50m RCC Slab Culvert
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
1.50m RCC Slab Culvert
Providing and laying Reinforced cement concrete 1:1.5:3 using 20mm ISS HBG metal in superstructure as per drawings and MORD technical specification clauses 800,1250.4 & 1205.5 Design mix M25 for Bed block &Deck slab
1.50m RCC Slab Culvert
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete. for Below sill
Below Sill level
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete. for Above sill
Above Sill level
Supply and fabrication of S-415 steel required for all RCC items of works involved in the schedule including cost of steel at site including cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover, blocks and all other incidental charges etc complete, as per standard specification for culvert.for Bed block & Deck slab
1.50m RCC Slab Culvert
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
1.50m RCC Slab Culvert
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
1.50m RCC Slab Culvert
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
1.50m RCC Slab Culvert
C. Construction of 1.50m RCC Slab culvert @ Ch 115m
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
1.50m RCC Slab Culvert
Providing and laying for plain cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
1.50m RCC Slab Culvert
Providing and laying for plain cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
1.50m RCC Slab Culvert
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
1.50m RCC Slab Culvert
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
1.50m RCC Slab Culvert
Providing and laying Reinforced cement concrete 1:1.5:3 using 20mm ISS HBG metal in superstructure as per drawings and MORD technical specification clauses 800,1250.4 & 1205.5 Design mix M25 for Bed block &Deck slab
1.50m RCC Slab Culvert
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete. for Below sill
Below Sill level
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete. for Above sill
Above Sill level
Supply and fabrication of S-415 steel required for all RCC items of works involved in the schedule including cost of steel at site including cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover, blocks and all other incidental charges etc complete, as per standard specification for culvert.for Bed block & Deck slab
1.50m RCC Slab Culvert
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
1.50m RCC Slab Culvert
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
1.50m RCC Slab Culvert
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
1.50m RCC Slab Culvert
C. Construction of Retaining wall at Km 0/810-0/837
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Providing and laying for plain cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Providing and laying for cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete.
D. Construction of Retaining wall at Km 1/130-1/145, Km 1/326-1/341
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Providing and laying for plain cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Providing and laying for cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete.
E. Dry fixing 0.90m dia NP3 Hume pipe at Ch 1288m
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Providing and laying for plain cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Supplying and fixing of 0.90m dia NP3 hume pipe with including cost and conveyance of all materials to site and all labour charges etc., complete
F.Construction of 5.00 m RCC Slab culvert @ Ch 1326m
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
5.00m RCC Slab Culvert
Providing and laying for plain cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
5.00m RCC Slab Culvert
Providing and laying for plain cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
5.00m RCC Slab Culvert
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
5.00m RCC Slab Culvert
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
5.00m RCC Slab Culvert
Providing and laying Reinforced cement concrete 1:1.5:3 using 20mm ISS HBG metal in superstructure as per drawings and MORD technical specification clauses 800,1250.4 & 1205.5 Design mix M25 for Bed block &Deck slab
5.00m RCC Slab Culvert
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete. for Below sill
Below Sill level
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete. for Above sill
Above Sill level
Supply and fabrication of S-415 steel required for all RCC items of works involved in the schedule including cost of steel at site including cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover, blocks and all other incidental charges etc complete, as per standard specification for culvert.for Bed block & Deck slab
5.00m RCC Slab Culvert
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
5.00m RCC Slab Culvert
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
5.00m RCC Slab Culvert
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
5.00m RCC Slab Culvert
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
5.00m RCC Slab Culvert
G. Construction of Bed Level Causeway at Ch 1960m
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Providing and laying for plain cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete for 10m3
Filling the Carted M sand including cost and conveyance and filling charges etc., as per standard Specification
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse with form work joint fillar board
Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete.
H. Construction of 1.50m RCC Slab culvert @ Ch 2312m
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
1.50m RCC Slab Culvert
Providing and laying for plain cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
1.50m RCC Slab Culvert
Providing and laying for plain cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
1.50m RCC Slab Culvert
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
1.50m RCC Slab Culvert
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
1.50m RCC Slab Culvert
Providing and laying Reinforced cement concrete 1:1.5:3 using 20mm ISS HBG metal in superstructure as per drawings and MORD technical specification clauses 800,1250.4 & 1205.5 Design mix M25 for Bed block &Deck slab
1.50m RCC Slab Culvert
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete. for Below sill
Below Sill level
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete. for Above sill
Above Sill level
Supply and fabrication of S-415 steel required for all RCC items of works involved in the schedule including cost of steel at site including cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover, blocks and all other incidental charges etc complete, as per standard specification for culvert.for Bed block & Deck slab
1.50m RCC Slab Culvert
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
1.50m RCC Slab Culvert
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
1.50m RCC Slab Culvert
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
1.50m RCC Slab Culvert
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
Name of the work : 2. Strengthening of the Road From V.P.Pudur to Periya odai pathai road Km 0/0-4/8 H/O Kavalapatty (R59) Estimate amount : Rs.247.17 Lakhs
A. Construction work Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking the existing worn out BT surface hard gneiss, granite,quartz metal 50mm to 100mm thick and repacking the metal to bring the existing surface to camber including leveling and sectioning as indicated by the departmental officer including labour charges for picking tools and equipments employed and all other incidental charges etc., complete as per standard
Earth work excavation from borrow pits for filling in all classes of soil except sand and hard rock etc with initial lead and lift for raising and widening the existing road sidedrain etc, complete.as per SS20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification..
Providing and laying bituminous Macadam with hout mix plant using crushed aggregates of grading as per Table 500.4 premixed using bitumious binder, transported to site upto lead of 100m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achive the desired compaction as per Technical Specification Clause 504.
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Provision for Km stone, Hm stone,Guardstone,Name board, Logo board and Cautionary sign boards etc.
KM Stone
HM Stone
Provision for 60 cm Equilateral triangle cautionary sign board
B. Construction of Bed Level Causeway at Km 0/4 & Km 1/0
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse with form work joint fillar board
Wearing Coat at Km 0/4 & Km 1/0
C. Construction of Bed Level Cause way at Km 2/35
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse with form work joint fillar board
Wearing Coat at Km 2/35
C. Construction of Bed Level Cause way at Km 3/2
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse with form work joint fillar board
Wearing Coat at Km 3/2
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
Name of the work : 3. Strengthening of the Road From Ottanai pudhur road to Porunthal road Km 0/0-2/0 H/O Periyammapatti (R304) Estimate amount : Rs.122.90 Lakhs
A. Construction work Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking the existing worn out BT surface hard gneiss, granite,quartz metal 50mm to 100mm thick and repacking the metal to bring the existing surface to camber including leveling and sectioning as indicated by the departmental officer including labour charges for picking tools and equipments employed and all other incidental charges etc., complete as per standard
Earth work excavation from borrow pits for filling in all classes of soil except sand and hard rock etc with initial lead and lift for raising and widening the existing road sidedrain etc, complete.as per SS20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification..
Providing and laying bituminous Macadam with hout mix plant using crushed aggregates of grading as per Table 500.4 premixed using bitumious binder, transported to site upto lead of 100m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achive the desired compaction as per Technical Specification Clause 504.
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Provision for Km stone, Hm stone,Guardstone,Name board, Logo board and Cautionary sign boards etc.
KM Stone
HM Stone
Provision for 60 cm Equilateral triangle cautionary sign board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
M/S.SIGRUN VERTRAG PROJECTS (BID ID -1378956)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .