| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.8 LAccepted-AOC THALAPALLAM PILIYANUR PIKKAMPATTY POST PENNAGARAM TK DHARMAPURI DT | L1 | Accepted-AOC L1 | |
| 2 | L2₹75.2 L+₹5.4 L (7.74%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M KULANTHAISAMY L2 | Arun Constraction and Contractors L1 |
|---|---|---|---|---|---|
| 1.00Strengthening of the road from Samathal BT road to Pasipalli Kombai road Km.0/0-2/0 H/o.Perumbalai | |||||
| 2.00 | Clearing the scrub jungles including the cutting the scrubs and removing away from site etc complete | 2,400 | Sqm | 8 ₹19,200 | 5 ₹12,000 Lowest |
| 3.00 | Picking 5 Cm to 10 Cm old metalled surface and sectioning -1 sqm | 2,510.42 | Sqm | 35 ₹87,864.7 | 21 ₹52,718.82 Lowest |
| 4.00Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10m initial lift of 2m in Hard gravel soil including cost and conveyance of all and labour charges etc., complete as per SS 20A | |||||
| 5.00 | Km 0/0-2/0 | 1,080 | Cum | 145 ₹1,56,600 | 131 ₹1,41,480 Lowest |
| 6.00Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, SHOULDERS | |||||
| 7.00 | Km 0/0-1/0 | 135 | Cum | 950 ₹1,28,250 | 871 ₹1,17,585 Lowest |
| 8.00 | Km 1/0-2/0 | 135 | Cum | 950 ₹1,28,250 | 880.86 ₹1,18,916.1 Lowest |
| 9.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 10.00 | Km 0/0-1/0 | 472.65 | Cum | 2,500 ₹11,81,625 | 2,246.99 ₹10,62,039.82 Lowest |
Tender Value
₹70.8 L
EMD Value
₹71,000
Closing Date
16 May 2025, 3:00 pmClosed
The Addl. Collector (Dev) / Project Director
DRDA, Dharmapuri
Strengthening the road from Samathal BT road to Pasipali Kombai 0/0 -2/000 H/O Perumbalai
2025_RDTN_553260_1
Roc.No.736/2025/R2 MGSMT P18
Open Tender
Civil Works - Roads
Item Rate
120 days
DRDA
Can be seen in the tender documents
2 documents required · 2 mandatory
₹0
₹71,000
DRDA, Dharmapuri
2 Sept 2025
1 May 2025
16 May 2025
1 May 2025
16 May 2025
7 May 2025
7 May 2025
Amount
Strengthening of the road from Samathal BT road to Pasipalli Kombai road Km.0/0-2/0 H/o.Perumbalai
Clearing the scrub jungles including the cutting the scrubs and removing away from site etc complete
Picking 5 Cm to 10 Cm old metalled surface and sectioning -1 sqm
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10m initial lift of 2m in Hard gravel soil including cost and conveyance of all and labour charges etc., complete as per SS 20A
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, SHOULDERS
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg of Bituminous Emulsion SS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and lyaing TACK COAT ove the WMM surface (treated with primer) using 2.50 KG of Bituminous Emulsion RS1 for 10 sqm. including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
Road marking with hot applied thermoplastic compound with Reflectorising glass beads on bituminous surface etc.,
Provision for Sign Board
Provision for Hectometer Stone
Provision for Kilometer Stone
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M KULANTHAISAMY (BID ID -1335040)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .