| Sl No | Description | Qty | Unit | PERUMAL L1 |
|---|---|---|---|---|
| 1.00 | Dismantling the existing damaged Cement Concerete wall etc., complete direction of departmental officers. | 55 | M3 | 530 ₹29,150 Lowest |
| 2.00 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 345 | M3 | 180 ₹62,100 Lowest |
| 3.00 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 56 | M3 | 5,600 ₹3,13,600 Lowest |
| 4.00Centering with steel centering for revertment, drain and culvert upto 1.20m depth etc., complete | ||||
| 4.01 | i. Side wall | 1,227 | M2 | 490 ₹6,01,230 Lowest |
| 4.02 | ii.Slab bottom | 24 | M2 | 1,290 ₹30,960 Lowest |
| 5.00 | Cement concrete 1:3:6 (one cement, three sand and six aggregate) using 20mm gauge hard broken granite stone jelly for All CC items of work xcluding centering, but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 191 | M3 | 6,500 ₹12,41,500 Lowest |
| 6.00 | Plastering with cement mortar 1:5(one cement and five sand) 12mm thick in all floors complying with standard specifications. | 223 | M2 | 150 ₹33,450 Lowest |
| 7.00 | Conveying the excavated earth,desilting materials dismantling concrete from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers. | 320 | M3 | 57 ₹18,240 Lowest |
| 8.00 | Supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying etc. | 6 | Qtl | 9,300 ₹55,800 Lowest |
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
17 Jul 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of Storm water Drain and Culvert at Thanneer Thotti Street in ward no.40,West Zone.
2025_MAWS_578304_16
e36/2025 -Two Cover
Open Tender
Civil Works
Works
150 days
Coimbatore corporation
As Per Tender Document
4 documents required · 4 mandatory
₹0
₹30,000
1 Nov 2025
15 Jul 2025
18 Jul 2025
15 Jul 2025
17 Jul 2025
15 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .