| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.4 LAccepted-Finance | ₹34.4 L | L1 | Accepted-Finance Lowest Amount Quoted |
| 2 | L2₹35.1 LAccepted-Finance 44 621708 | PERAMBALUR | TAMIL NADU | 621708 | ₹35.1 L | L2 | Accepted-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | KATHIRAVAN R L2 | RAJENDIRAN P S L1 |
|---|---|---|---|---|---|
| 1.00 | Construction of New Two Class Room School Building @ PUE School Labbaikudikadu (West) Panchayat Union Middle School in Veppur Union Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification. | 258.91 | cum | 270 ₹69,905.70 | 263 ₹68,093.33 |
| 2.00 | Supplying and filling in foundations and basement with filling M- sand in layers not exceeding 15 cm.thick,well watered,rammed and consolidated etc. complete complying with standard specifications. | 13.86 | cum | 1,825 ₹25,294.50 | 1,757 ₹24,352.02 |
| 3.00 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 17.42 | cum | 5,450 ₹94,939 | 5,391 ₹93,911.22 |
| 4.00 | Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid). | 99.65 | cum | 555 ₹55,305.75 | 547 ₹54,508.55 |
| 5.00 | Plain surfaces such as roof slab, floor slab, beams, lintels, loft, sill slab, staircase waist, portico slab and other similar works. | 172.04 | cum | 1,125 ₹1.9 L | 1,095 ₹1.9 L |
| 6.00 | Square and rectangular columns and small quantities such as sunshades, parapet cum drops, window boxing, fin projections and other similar works. | 81.32 | cum | 1,250 ₹1.0 L | 1,204 ₹97,909.28 |
| 7.00 | Providing and laying in position, M-20 Grade in accordance with IS:456-2000, using 20mm and down grade hard broken granite stone jelly for all RCC Items of works with minimum cement content of 350kg/m3 and maximum water cement ratio of 0.50, including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS:9130 to accelerate, rated setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m) 7730kg. of 20mm machine crushed stone jelly and with about (3.3cum) 5156 kg. of 10-12mm machine crused stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with Mechanical vibrators, finishing, curing, etc.,and providing fixtures like fan clamps in the RCC Floor / roof slabs wherever necessary without claiming extra, etc., Complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No Separate payment will be made by the Department for the excess usage of materials). | 30.69 | cum | 9,250 ₹2.8 L | 9,144 ₹2.8 L |
| 8.00 | Ground Floor | 25.43 | cum | 9,350 ₹2.4 L | 9,285 ₹2.4 L |
| 9.00 | Steel - Fe 500 D: Supply, fabrication and placing of reinforcement steel of high yield strength ribbed bars of various diameters and grade conforming to IS 1786 for reinforced concrete work. The work includes recoiling, straightening, cutting, bending, fabricating, and placing in position, at all levels including lead and lift, according to drawings, specifications etc. complete and supply & use of 18G black annealed binding wire double fold to tie the bars in position and providing precast cement/ PVC cover blocks for main reinforcement to ensure specified cover and complete., including all labor charges etc as directed by departmental officers. | 8,900 | Mt | 94 ₹8.4 L | 92 ₹8.2 L |
| 10.00 | Brick work in following Cement Mortar 1:5 using best quality II class table moulded bricks 8"3/4 x 41/4" X23/4" for foundation and basement including curing etc.,complete complying with standard specification.including scaffolding curing cost of reinforcement etc.all complete as per specifications and drawings as directed by the Engineer in-charge. | 15.15 | cum | 6,150 ₹93,172.50 | 6,118 ₹92,687.70 |
Updated dates
Tender Value
₹34.4 L
EMD Value
₹35,000
Closing Date
17 Dec 2025, 4:30 pmClosed
BDO VP Veppur
Block Development Officer Veppur
Construction of New Two Class Room School Building PUE School Labbaikudikadu West Panchayat Union Middle School in Veppur Union
2025_RDTN_632007_1
3333/2025/A2
Open Tender
Civil Works
180 days
Block Development office Veppur
As Per Tender Documents
2 documents required · 2 mandatory
₹0
₹35,000
13 Jun 2026
15 Dec 2025
17 Dec 2025
15 Dec 2025
17 Dec 2025
15 Dec 2025
Construction of New Two Class Room School Building @ PUE School Labbaikudikadu (West) Panchayat Union Middle School in Veppur Union Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification.
Supplying and filling in foundations and basement with filling M- sand in layers not exceeding 15 cm.thick,well watered,rammed and consolidated etc. complete complying with standard specifications.
Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid).
Plain surfaces such as roof slab, floor slab, beams, lintels, loft, sill slab, staircase waist, portico slab and other similar works.
Square and rectangular columns and small quantities such as sunshades, parapet cum drops, window boxing, fin projections and other similar works.
Providing and laying in position, M-20 Grade in accordance with IS:456-2000, using 20mm and down grade hard broken granite stone jelly for all RCC Items of works with minimum cement content of 350kg/m3 and maximum water cement ratio of 0.50, including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS:9130 to accelerate, rated setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m) 7730kg. of 20mm machine crushed stone jelly and with about (3.3cum) 5156 kg. of 10-12mm machine crused stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with Mechanical vibrators, finishing, curing, etc.,and providing fixtures like fan clamps in the RCC Floor / roof slabs wherever necessary without claiming extra, etc., Complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No Separate payment will be made by the Department for the excess usage of materials).
Ground Floor
Steel - Fe 500 D: Supply, fabrication and placing of reinforcement steel of high yield strength ribbed bars of various diameters and grade conforming to IS 1786 for reinforced concrete work. The work includes recoiling, straightening, cutting, bending, fabricating, and placing in position, at all levels including lead and lift, according to drawings, specifications etc. complete and supply & use of 18G black annealed binding wire double fold to tie the bars in position and providing precast cement/ PVC cover blocks for main reinforcement to ensure specified cover and complete., including all labor charges etc as directed by departmental officers.
Brick work in following Cement Mortar 1:5 using best quality II class table moulded bricks 8"3/4 x 41/4" X23/4" for foundation and basement including curing etc.,complete complying with standard specification.including scaffolding curing cost of reinforcement etc.all complete as per specifications and drawings as directed by the Engineer in-charge.
Ground Floor
Brick partition walls of 11.50cm thickness using best quality II class table moulded bricks 8"3/4 x 41/4" X23/4" in Cement Mortar 1:3 (One Cement and Three Sand) using hoop iron reinforcement if found necessary including curing etc. complete and as directed by the departmental officers.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Providing & applying 12 mm thick cement plaster in CM 1:5 (1 part of cement: 5 parts of sand) to walls internally in single coat at all levels to correct line and level including chicken wire mesh at all joints of brick and concrete surfaces with minimum overlap of 150 mm in all directions, scaffolding, rounding off or chambering of corners, offsets, fin/ bands, projections, etc. and cleaning of surface, raking out joints, roughening of surface, chiseling the undulated surface wherever necessary and curing, etc., all materials and labor complete in all respects including all lead, lift and descent and as directed.
Providing & applying 20 mm thick cement plaster in CM 1:5 (1 part of cement: 5 parts of sand) to walls externally in single coat at all levels to correct line and level including scaffolding, rounding off or chambering of corners, offsets, fin/ bands, projections, etc. and cleaning of surface, raking out joints, roughening of surface, chiseling the undulated surface wherever necessary and curing, etc., all materials and labor complete in all respects including all lead, lift and descent and as directed.
Paving the floor with best approved quality fine polished SHAHABAD stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining,curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers).
UPVC Window Specification: Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Windows of casement type (open) from the profile the size of outer frame 60mm x 58mm and shutter profile are reinforcement with GI/1mm 125GSM and 100% corrosion free, the profiles are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with over all the edges of frame and shutter the shutter will be provided with Espag multi power point locks and also it operates as handle. The corners and joints should be welded and cleaned. Radiations free pin headed plain or brown colour glass 4mm thick should be provided to the shutter and it should not allow leakage of water even at most ranging storms and should have key lockable action, security protective hinges, strong locking systems and as per size for arresting noise and energy loss. The connecting mechanism between sash and outer frame that enables opening of the window. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. The window should be got approved from the Executive Engineer before use on work
Providing UPVC (Un-Plasticized Polyvinyl Chloride) Door: Providing and fixing casement doors fabricated from un-plasticized polyvinyl chloride (uPVC) sections. Profiles: The profiles should be three chamber system which provides high insulation properties with outer frame 60mm x 55mm with an outer wall thickness of 2.4mm. The window unit should be designed with all corner joints mitred and fusion welded. Windows should be steel reinforced with 25 x 24 x 25mm steel reinforcement with a thickness of 1mm to have dimensional stability. The sash should be of 60 x 102mm. The mullion should be of 60 x 74mm. The profiles should have co-extruded seals. Hardware: All the hardware like friction stays, handles should be screwed with self tapping screws. The handles, locks should be designed so that they cannot be released from outside. Glazing: The window system should be glazed with 5mm plain float glass / 6mm bison lam Installation: The profiles should be cut to length and welded 45 degrees. The window should be designed such that the water drainage does not pass through the reinforcement chamber. The window system should be fixed directly to the plastered brick wall using self expanding nylon plug and driving ms electroplated screws into plug.
Supplying and Painting new ceiling plastered surface with two coats of distempering one coat of distemper primer
Supplying and Painting new plastered internal wall surface with two coats of distempering one coat of distemper primer
Supplying and painting the walls with one coat of wall primer and two coats of Exterior emulsion (apex or equivalent) as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The colour and shade of the cement paint shall be got approved by the Executive Engineer before use of work).
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Supplying and fixing cuddapah slab for cupboard shelf
Supplying and fixing PVC Rain water down fall pipes of following dia meter etc., complete.
Towards Cost For Supply and Fixing of SS Hand Rails inlcuding all Charges ect Complete
Towards Cost For Supply and Fixing ofEleectrical Arrangementsinlcuding all Charges ect Complete
Fan Point SD 25
LED Light
Plug Point SD 38
Fan SD 106
Service Wire SD 64
Earth Connection SD 125
Service Pipe SD 70
SD142 DP Switch
BaLA painting including GST
Display Notice board including GST
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.13 MB
Part.pdf
Tender Documents • 0.25 MB
BOQ_756049.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid