| # | Company | Status |
|---|---|---|
| 1 | Rejected-Technical SENGADU PO EDAPPULI NADU KOLLIHILLS TK PIN 637411 | KOLLIHILLS | NAMAKKAL | TAMIL NADU | 637411 | Rejected-Technical due to administrative reasons |
| 2 | Rejected-Technical | Rejected-Technical due to administrative reasons |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
27 May 2026, 2:00 pmClosed
Superintending Engineer/Generation/Tirunelveli
Anna Building /Maharaja Nagar/Tirunelveli
Drinking water storage tank-arresting leakage
2026_EB_676925_1
SE/GC/TIN/C03/2026-27
Open Tender
Civil Works - Others
Works
60 days
Koadayar
Enclosed
2 documents required · 2 mandatory
₹0
₹5,000
Yes
22 Jul 2026
13 May 2026
29 May 2026
13 May 2026
27 May 2026
13 May 2026
13 May 2026 - 27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for plinth protection depositing on bank in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders including cost of labour, T&P, lead, lift etc.,complete. | 29 | Cum | - | - |
| 2 | Clean removal of cement plaster & pointing from the existing walls and clearing away the debrises from the site as directed by the engineer at site including scaffolding charges, cost of labour, lead, lift, tools & plants, etc. complete. | 440 | Sqm | - | - |
| 3 | PCC 1:3:6 for Plinth using 20 mm HBG metal including cost of all materials, labour, lead, lift, head load, curing, etc., complete. | 4 | Cum | - | - |
| 4 | Plastering with C.M 1:3, 12mm thick with water proof compound including cost of all materials, curing, labour lead lift complete. | 286 | Cum | - | - |
| 5 | Pointing with cement mortar 1:3 for RR wall including all cost of materials, labour, lead, lift, etc complete. | 132 | Sqm | - | - |
| 6 | Flooring with cement mortar 1:5 of 20mm thick including cost of all materials, labour, lead, lift, head load, etc., complete. | 36 | Sqm | - | - |
| 7 | Supplying fabrication,erection,aligning and placing in position of structural steel materials like M.S. Angle including cost of all material.labour charges, welding charges, painting two coats of enamel over one coat of primer, lead, lift etc., complete. | 51 | kg | - | - |
| 8 | Painting with Water Proofing Paint with two coat by using Arresting Water leakage after through scrapping and washing /cleaning the old surface including the cost of all materials,lead, lift, labour, T&P,etc.,complete. | 410 | Sqm | - | - |
| 9 | White Washing with two coat by using white cement after through scrapping and washing /cleaning the old surface including the cost of all materials, lead, lift, labour, T&P, etc., complete. | 132 | Sqm | - | - |
| 10Supply and laying of water supply Pipe line specials like Flange, Valve, reducer, connecter etc., as approved by the Engineer incharge including cost of all materials, labour, transportation, lead, lift, head load, etc complete. | |||||
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_813411.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .