| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 LAccepted-AOC | ₹10.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.1 LRejected-AOC | ₹11.1 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M Rajasekar L1 | Kannan K L2 |
|---|---|---|---|---|---|
| 1.00Repairs of RCC Building Two Class Room (West Facing) P.U.E.School Ammankovil kadu H/O Adaiyur | |||||
| 2.00 | Dismandling of old Damaged R C C Roof Carefully stacking material useful for Re use for any thickness of wall including cost of all labour charges to site | 11.38 | m3 | 4,305 ₹48,990.90 | 4,500 ₹51,210 |
| 3.00 | Chipping of damaged Granolithic Floor Finishing Including Cost of all Labour Charges to site etc Completed | 80.02 | m2 | 40 ₹3,200.80 | 50 ₹4,001 |
| 4.00 | Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft | 7.72 | m3 | 5,958 ₹45,995.76 | 6,000 ₹46,320 |
| 5.00 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc | 110.14 | m2 | 269 ₹29,627.66 | 270 ₹29,737.80 |
| 6.00 | Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer | 82.51 | m2 | 141 ₹11,633.91 | 145 ₹11,963.95 |
| 7.00 | Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358 | 136.53 | m2 | 214 ₹29,217.42 | 220 ₹30,036.60 |
| 8.00 | Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) | 21.76 | m2 | 150 ₹3,264 | 160 ₹3,481.60 |
| 9.00 | Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. | 87.85 | m2 | 1,610 ₹1.4 L | 1,650 ₹1.4 L |
| 10.00 | Painting two coats with best approved quality of mixed paint(Red lead=Linseed oil) including cost of mixed paint,brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2 for old Black board | 35.84 | m2 | 149 ₹5,340.16 | 150 ₹5,376 |
Tender Value
₹11.0 L
EMD Value
₹11,000
Closing Date
30 Jun 2025, 3:00 pmClosed
BDO (BP)
BDO Office, Edappadi Panchayat Union
Repairs of RCC Building Two class Room (West Facing) P.U.E. School Ammankovil kadu H/O Adaiyur Panchayat Edappady Block at Salem District - SIUS - 2025-26
2025_RDTN_572732_1
Roc.No.3224/2024/A2
Open Tender
Civil Works
120 days
BDO Office, Edappadi Panchayat Union
As per tender document
3 documents required · 3 mandatory
₹0
₹11,000
20 Feb 2026
23 Jun 2025
30 Jun 2025
23 Jun 2025
30 Jun 2025
23 Jun 2025
Amount
Repairs of RCC Building Two Class Room (West Facing) P.U.E.School Ammankovil kadu H/O Adaiyur
Dismandling of old Damaged R C C Roof Carefully stacking material useful for Re use for any thickness of wall including cost of all labour charges to site
Chipping of damaged Granolithic Floor Finishing Including Cost of all Labour Charges to site etc Completed
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
Painting two coats with best approved quality of mixed paint(Red lead=Linseed oil) including cost of mixed paint,brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2 for old Black board
Supplying and painting two coats new iron work such as steel doors ventilators, window bars etc., (WITHOUT PRIMER)
Supply and Delivery of following steel tube as per standard specification etc completed (50 x 25 x 2mm (RHS) Rectangular Steel Hollow Section)
Supply and Delivery of following steel tube as per standard specification etc completed (100 x 50 x 3mm (RHS) Rectangular Steel Hollow Section)
Supply & Fixing of Continuous sandwich PUF panels 50 mm thick either as single piece, prefabricated, modular, factory made units which consist of an insulating layer of rigid polyurethane foam between two layers of metal sheets, comprises of PUF bonded between two sheets of Pre-coated GI sheets of 0.5 mm thick to produce straight-to-finish panels with all necessary fixtures to complete the work in all respect. The rate is inclusive of design ,shop drawing preparation, submission for approval etc., and also inclusive of any other incidental charges such as lifting using cranes, labour charges for erection, cost of all materials involved and as directed by the departmental officers.
Electrification Works
Light Point & Fan SD 26
Tube Light SD 88
Ceiling Fan SD 106
Special design Art work with first class quality emulsin paint including wall putty ,Primng coat etc.complete .rate for 100 Sq.feet (BALA PAINTING)
Supply and Fixing of Magnetic Fiber
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying and fixing following thickness of cuddapah slab for cupboard 20-30mm thick
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Kannan K (BID ID -1384734)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid