Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.2 LAccepted-AOC | L1 | Accepted-AOC Being lowest bidderER | |
| 2 | L2₹21.1 L+₹88,300 (4.37%)Rejected-Finance | L2 | Rejected-Finance Being other than lowest bidder | |
| 3 | L3₹24.9 L+₹4.7 L (23.3%)Rejected-Finance | L3 | Rejected-Finance Being other than lowest bidder | |
| 4 | L4₹25.3 L+₹5.1 L (25.4%)Rejected-Finance | L4 | Rejected-Finance Being other than lowest bidder |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
1 Aug 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE AF JAMMU
GE AF JAMMU
CA NO GE/AFJ-28/2023-24 PERIODICAL SERVICES TO OTM AND MD ACCN IN DOMESTIC AREA UNDER GE (AF) JAMMU
2023_MES_607262_1
CA NO GE/AFJ-28/2023-24
Open Tender
Civil Works
Item Rate
270 days
JAMMU
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE(AF) JAMMU
₹70,000
Yes
13 Oct 2023
30 Jun 2023
4 Aug 2023
30 Jun 2023
1 Aug 2023
18 Jul 2023
Amount
M&L preparation of old decorated surfaces of ceiling including scraping of old flakes with the help of mechnical electrical sander ,washing down with help of water and apply one coat of white wash on surface of ceiling including necessary formwork scaffolding required upto the 6th story complete all as specified and directed.
M&L for prepartion and scrapping down of old decoated surface of wall with mechanical/electrical sander and washing down the surfaces with the help of water completely and apply one coat of oil bound distemper of any tint on walls and filling gaps with putty so as to provide smooth finish over a coat of primer. The surface shall be even and smooth,free from any undulation as directed by Engr-in-charge. NOTE:-1. The contractor shall have the responsibility to clean, safe guard all electric fitting,window frame,door frame,fans and funiture from splashes of OBD.The work should be executed through specilized workmanship and MOU should signed between contractor and authorized applicator and should be submitted to the GE. 2. No extra cost to be borne by department
M&L for one coats of synthetic enamel paint on wooden surfaces followed by filling with filling material applying paint with mechnical sprayer complete all as specified and directed. Note : Work has to be executed through company employee and Make should approved by GE.
M&L for one coat of synthetic enamel paint on steel surfaces followed by filling with filling material, applying synthetic enamel paint with mechanical sprayer complete all as specified and directed. Note : Work has to be executed through company employee and Make should approved by GE
M&L Prepration of old decorated surfaces of wall including scraping of old flakes with the help of mechanical / electrical sander ,washing down with help of water and apply two coat of white wash on surface of wall complete all as specified and directed.
M&L for applying two coats of oil bound distemper paint on walls over a coat of primer with mechanical sprayer followed by roller including preparation of surface filling gaps with(POP/Putty)upto the desired finish complete all as specified and directed. Note: Each layer of OBD shall have a gap of 08 Hrs till previous layer has dried up and work has to be executed through company employee ,before all Make and executing agency shall have the approval of GE and MOU should signed betwen contractor and authorized applicator and should be submitted to the GE. No extra cost to be borne by the department .
Preparation of old surfaces of walls height upto 6th storied by brooming down with steel wire brushes, scrapping down smoke soot moulds moss and efflorescence salts washing,rubbing down and cleaning oil greasy spots etc and applying two coats of weather proof exterior emulsion paint of any colour/white on walls including necessary formwork scffolding required upto the 6th storey complete all as specified and directed.
M&L for two coats of synthetic enamel paint on wooden surfaces (including complete removal of existing treatment with paint remover) followed by filling with filling material , one coat of wooden pink primer with mechanical sprayer complete all as specified and directed. Note : Work has to be executed through company employee from Berger /Nerolac/Asian ,before all Make and executing agencey shall have the app of GE .
M&L for two coats of synthetic enamel paint on steel surfaces (including complete removal of existing treatment with paint remover) followed by filling with filling material , one coat of wooden red oxide zinc chrome primmer and two coats of synthetic enamel paint with mechanical sprayer complete all as specified and directed. Note : Work has to be executed through company employee from Berger /Nerolac/Asian ,before all Make and executing agencey shall have the approval of GE .
M & L, for complete removal of existing treatment on walls including preparation on old surface of wall height upto 6th storied applying Finishing walls with Acrylic Smooth exterior paint of required shade (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm complete all as specified and as directed by Engr in Charge.(make Burger long life, nerolac excel top guard ) NOTE:-1. Contractor shall have responsibility to clean, safe guard all electric fitting,window frame,door frame,fans and funiture from splashes of OBD. The work should be executed through specilized workmanship and MOU should signed between contractor and authorized applicator and should be submitted to the GE. 2. No extra cost to be borne by department
M&L Prepration of old decorated surfaces of ceiling incliuding scraping of old flakes with the help of mechanical /electrical sander ,washing down with help of water and apply three coat of white wash on surface of ceiling complete all as specified and directed.
Taking down cement plaster on brick/concrete surfaces etc including racking out joints, hacking for keys and scrubbing down with water etc and removing all debris to a distance exc 50 mtr but not exc 100 mtrs including necessary formwork/scaffolding required upto the 6th story complete all as specified and directed.
M&L Rendering 15mm thick in cement mortar 1:4 on fair faces of brick/concrete surfaces on walls mixed with integral liquid WPC by weight of cement as per manufacturer instruction, finished even and smooth without using extra cement complete all as specified. Note:-Supply only WPC will be measured and paid for separately
M&L for 15mm thick cement plaster on fair faces of brick work/stone work on walls in cement mortar 1:6, on concrete surface finished even and smooth without using extra cement,necessary formwork scaffolding required upto the 6th story complete all as specified and as directed.
M&L for making good the surface of chajja/facia/roof projection etc visible with reinforcement or not by providing PCC 1:2:4 type B-0,including with cement plaster 1:3 and necessary formwork scaffolding required upto the 6th story complete all as specified and directed and directed by Engr-in-charge.
M&L rendering 5 mm thick in cement plaster 1:3 on ceiling surface finished even and smooth without using extra cement ,necessary formwork scaffolding required upto the 6th storey complete all as specified and as directed.
Supply only integral water proofing compound, ISI marked complete all as specified.
M&L for preparation of new plastered surfaces of wall apply 3mm wall care putty ,necessary formwork scaffolding required upto the 6th storey complete all as specified and as directed.
Preparation of new plastered surfaces and applying two coats of exterial emulsion paint on walls over a coat of primer including necessary formwork scaffolding required upto the 6th storey complete all as specified and directed.
Applying two coats of distemper with oil emulsion over one coat of primer and 3mm putty including preparation of newly plastered surfaces of walls including necessary formwork scaffolding required upto the 6th storey complete all as specified and as directed.
Preparation of old painted surface of wall n.exc 0.5sqm in area and applying one coat of synthetic enamal paint and rewriting of bldg number by different colour complete all as specified and directed. NOTE:-1. After completion of welcome work scraped material,dust,droped paint,white wash,OBD etc will be cleaned by contractor by washing rubbing down and making good of surfaces. 2.Remove Kitchen reck,mirror etc and refix at its own existing place after painting work.
SCHEDULE 'A' PART-II (Schedule of credit) Credit amount of Rs (Refer schedule of credit) for retrieved material mentioned in Sch 'A' Part-II of Tender documents in PDF form will be deducted offline during acceptance of tender of lowest bidder.
M/S Shesh Paul Gupta
Rakesh Kumar Malia
M/S MOHAN LAL SHARMA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .