Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 CrAccepted-AOC 59 INDU HOUSE RAMA ROAD INDUSTRIAL AREA 110015 | DELHI | WEST DELHI | DELHI | 110015 | ₹3.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.9 Cr+₹16.4 L (4.37%)Rejected-Finance AT MALANI COMPLEX 58 KOTECHA NAGAR KALAVAD ROAD RAJKOT 360001 GUJARAT INDIA | RAJKOT | GUJARAT | 360001 | ₹3.9 Cr+₹16.4 L (4.37%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical work completion and bid capacity not attached |
Tender Value
₹3.8 Cr
EMD Value
₹7.5 L
Closing Date
6 May 2024, 5:00 pmClosed
Ravi Ladwal
ED Rewari
Construction of Govt. Medical College at village Koriyawas in Distt Mohindergarh. (PDG. LO SYSTEM ONLY)
2024_HRY_353867_2
2024BCE880B6 5843 423F B264 1AAF421E4CF7668BAR
Open Tender
Civil Works
Works
210 days
Koriyawas
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
₹7.5 L
Yes
1 Jul 2024
14 Mar 2024
7 May 2024
14 Mar 2024
6 May 2024
14 Mar 2024
Amount
S/I/T/C of 13 KL plus 13 KL LMO Tank (capacity vacuum plus Perlite or Vacuum plus super insulated vertical storage tank) designed to EN-13458 code (Empty LMO Tank) GROSS VOLUME 19220 LIT approx NET CAPACITY 18441 LIT approx INNER VESSEL MATERIAL: STAINLESS STEEL DESIGN and MANUFACTURING CODE EN13458 MAX. ALLOWABLE WORKING PRESSURE 17 KG/CM2 (g) DESIGN PRESSURE (Corrected for vacuum) 18.633 KG/CM2 (g) DESIGN TEMPERATURE - 196 TO plus 40 DEG. C CLEANING DUTY OXYGEN INSULATION VACUUM plus PERLITE OR VACUUM plus SUPERINSULATED OUTER VESSEL MATERIAL CARBON STEEL DESIGN CODE EN13458 RATING PRESSURE VACUUM EMPTY WEIGHT [APPROX] 8340 Kg. EXTERNAL SURFACE MECHANICAL CLEANING, PRIMER / FINAL PAINT (POLYURETHANE) TWO COATS EACH, Exact volume could be plus /-3% after stretching complete in all respect including petty accessories / works up to the entire satisfaction of Engineer-in-Charge of the work. make Inox / VRV / New Field Industrial
S/I/T/C of Low pressure vaporizer for 13 KL plus 13 KL Liquid Medical Oxygen Tank: DUTY (Nominal). 08 HRS INLET/DESIGN TEMP. - 196 to plus 65 DEG.C OUTLET TEMP. 15 Deg. below ambient Temp. (DEG.C) CAPACITY FLOW (LOX) 1200 Nm3/hr HEATING MEDIUM AMBIENT AIR MAX. OPERATING PRESSURE 38 KG/CM2 (g) DESIGN PRESSURE 40 KG/CM2 (g) PNEUMATIC TEST PRESSURE 44 KG/CM2 (g) CLEANING DUTY - OXYGEN DESIGN and MFG. CODE - ASME SEC.VIII DIV.I complete in all respect including petty accessories / works up to the entire satisfaction of Engineer-in-Charge of the work. make Inox / VRV / Cryovaltic
S/I/T/C of Stainless Steel Pipe with stainless steel flange for interconnection of Low pressure vaporizer to 13 KL plus 13 KL Liquid Medical Oxygen Tank complete in all respect including petty accessories / works up to the entire satisfaction of Engineer-in-Charge of the work.
S/I/T/C of LED Screen 65` or above size approx complete in all respect including petty accessories / works up to the entire satisfaction of Engineer-in-Charge of the work. Make SONY / LG / Samsung
S/I/T/C of CPU with HDMI cable and Keyboard, mouse and networking switch complete in all respect including petty accessories / works up to the entire satisfaction of Engineer-in-Charge of the work make DELL/HP/LENOVA.
S/I/T/C of UPS 1 KVA with battery back 15min complete in all respect including petty accessories / works up to the entire satisfaction of Engineer-in-Charge of the work. Make Hitachi/ 3EM Power/Uniline
S/I/T/C of 6 U Rack for fixing CPU and accessories complete in all respect including petty accessories / works up to the entire satisfaction of Engineer-in-Charge of the work.
S/I/T/C of Remote Telemetry Unit is mandatory to be installed with Medical Liquid Oxygen Tanks as per recommendations of PESO. It should allow user to see the Level and Pressure of tank in digital format. It should have efficient low power design with Lithium Battery. It should have Free Mobile Application with Notifications. It should have Free access to Unlimited web users. It should have Free Emails / SMS alerts every hour. It should send Alerts when tank level reaches to 50%, 30%, empty of its capacity. Complete integrated unit including level and pressure sensor, transmitter, battery as well remote telemetry. Accuracy ± 0.5% complete in all respect including petty accessories / works up to the entire satisfaction of Engineer-in-Charge of the work.
S/I/T/C of Safety Signange and Other labeling work inside LMO Tank area complete in all respect including petty accessories / works up to the entire satisfaction of Engineer-in-Charge of the work.
S/I/T/C of Hot Water Splinker only (Hot water supply with pipe line will be in Hospital scope) complete in all respect including petty accessories / works up to the entire satisfaction of Engineer-in-Charge of the work.
S/I/T/C of High Pressure Gauge (*Dial size 4 inch) : Pressure Range: 0 – 16 Kg/cm2 complete in all respect including petty accessories / works up to the entire satisfaction of Engineer-in-Charge of the work.
S/I/T/C of High Pressure Gauge (*Dial size 6 inch) : Pressure Range: 0 – 16 Kg/cm2 complete in all respect including petty accessories / works up to the entire satisfaction of Engineer-in-Charge of the work.
S/I/T/C of Spring Loaded Safety Valve with set pressure 5.5.kg plus /-3kg pressure relief safety valve complete in all respect including petty accessories / works up to the entire satisfaction of Engineer-in-Charge of the work.
S/I/T/C of Spring Loaded Safety Valve with set pressure 15.5.kg plus /-3kg pressure relief safety valve complete in all respect including petty accessories / works up to the entire satisfaction of Engineer-in-Charge of the work.
S/I/T/C of High Pressure Regulators for oxygen inlet pressure 9 bar to 10 bar from LMO side and outlet pressure 4 bar to 6 bar flow rate with range 0-600 nm3 per hour ( plus -10%) complete in all respect including petty accessories / works up to the entire satisfaction of Engineer-in-Charge of the work.
S/I/T/C of Free standing modular mounting frame made of powder coated steel complete in all respect including petty accessories / works up to the entire satisfaction of Engineer-in-Charge of the work.
S/I/T/C of MS support and clamps complete in all respect including petty accessories / works up to the entire satisfaction of Engineer-in-Charge of the work.
S/I/T/C of Third Party Validation Charges for Liquid Medical Oxygen Tank from third party validation officer who have experience of similar LMO work and have Certificate of Recognition as a Competent Person from PESO. Copy of Certificate of Recognition of Competent Person from PESO must be submitted complete in all respect including petty accessories / works up to the entire satisfaction of Engineer-in-Charge of the work.
S/I/T/C of Foundation work including Excavatuion work for 2nos. (13KL plus 13KL) LMO Tank and 4 nos. Low pressure vaporizer (Approx. 17mtr x 20mtr area) for 2nos. (13KL plus 13KL) LMO Tank and 4 nos. Low pressure vaporizer and Providing and laying reinforced cement concrete for 2nos. (13KL plus 13KL) LMO Tank and 4 nos. Low pressure vaporizer including CC floaring in complete yard, MS jali fancing High Strength MS Fencing work with MS gate and MS crash barrier for 2nos. (13 KL plus 13 KL) LMO Tank and 4 nos. Low pressure vaporizer around complete yard with 6 mtr. wide openable gate etc. complete entire satisfaction engineer-in-charge of the work.
S/I/T/C of Fire extinguisher Buckets complete in all respect including petty accessories / works up to the entire satisfaction of Engineer-in-Charge of the work.
S/I/T/C of Fire extinguisher ABC type 16 Kg. complete in all respect including petty accessories / works up to the entire satisfaction of Engineer-in-Charge of the work.
S/I/T/C of MEDICAL Grade BS EN: 13348 Kite Marked COPPER PIPE in suitable protective casing complete with all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - in - Charge Size 54mmOD X 1.2mm thk make Rajco / Mandev / Mexflow
Third Party Validation Charges for quality of complete LMO installations from SGS/Lloyds/Bureau Veritas / TUV for compliance of technical specification / BOQ / safe operations.
Malani Construction Co.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .