Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-Finance | L1 | Accepted-Finance Being Lowest | |
| 2 | L2₹2.9 L+₹1.2 L (72.4%)Rejected-Finance | L2 | Rejected-Finance Not being Lowest |
Tender Value
Refer Docs
Closing Date
5 May 2022, 2:00 pmClosed
GE
GE PROJECT BANGALORE
PROVN OF DEFI STUDENT OFFRS ACCN WITH ALLIED INFRA AT ASC C AND COLLEGE BANGALORE
2022_MES_519284_1
3011/02/E3
Open Tender
Job Works
Works
60 days
BANGALORE
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
9 May 2022
21 Apr 2022
6 May 2022
22 Apr 2022
5 May 2022
23 Apr 2022
1. Mobilization and demobilization of necessary men and equipment for carrying out field investigation 2. Carrying out plate load test on soil using a plate size of 45cm X 45cm at excavated level and furnishing report incorporating test results as per IS -1888. Test will be carried out up to a pressure intensity of 30t/sq.m or maximum settlement of 25mm whichever occurs earlier. The load settlement curves shall be presented accurately. The minimum number of load increments shall be 5T/Sqm. The maximum loading intensity is expected to correspond to 25 mm settlement or failure load whichever is earlier. No water shall be added externally during the test. Soil profile upto 6 mtr below seating level of plate. 3. Test report should be vetted from Govt College. Note: Submission of report with analysis of above mention test should be submitted in six copies
Geo Quest Incorporation
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_580487.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .