Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.5 LAdmitted-Finance | ₹79.5 L | L1 | Admitted-Finance |
| 2 | L2₹88.4 L+₹8.9 L (11.2%)Admitted-Finance | ₹88.4 L+₹8.9 L (11.2%) | L2 | Admitted-Finance |
| 3 | L3₹91.3 L+₹11.8 L (14.8%)Admitted-Finance | ₹91.3 L+₹11.8 L (14.8%) | L3 | Admitted-Finance |
| 4 | L4₹91.5 L+₹12.0 L (15.0%)Admitted-Finance | ₹91.5 L+₹12.0 L (15.0%) | L4 | Admitted-Finance |
| 5 | L5₹98.9 L+₹19.4 L (24.4%)Admitted-Finance | ₹98.9 L+₹19.4 L (24.4%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K. S. BUILDERS L3 | Sabur Alam L7 | MODERN CONCEPT CONSTRUCTIONS L8 | sanu const. co. L4 | competent construction company L1 | J D Associates L5 | RAHUL BUILDERS L2 | M/s. Dua Const. Co. L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 3,000 | sqm | 25 ₹75,000 Lowest | 95 ₹2,85,000 | 125 ₹3,75,000 | 47 ₹1,41,000 | 49 ₹1,47,000 | 150 ₹4,50,000 | 50 ₹1,50,000 | 62 ₹1,86,000 |
| 2.00Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: | |||||||||||
| 2.10 | 1:5:10 (1 cement: 5 fine sand: 10 graded stone aggregate 40 mm nominal size) | 51 | cum | 2,500 ₹1,27,500 | 3,500 ₹1,78,500 | 4,500 ₹2,29,500 | 1,507 ₹76,857 Lowest | 2,504.5 ₹1,27,729.5 | 3,900 ₹1,98,900 | 4,500 ₹2,29,500 | 2,600 ₹1,32,600 |
| 3.00Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement including rubbing and polishing complete with base of cement cement mortar 1:4 (1 cement: 4 coarse sand) Note: The joints in kota flooring shall be provided with mix 1:1/2:2 (1 cemet: 1/2 coarse sand : 2 stone chipping 10 mm nominal size). Which shall be paid separetly. | |||||||||||
| 3.10 | 25 mm thick | 5,160 | sqm | 1,300 ₹67,08,000 | 1,100 ₹56,76,000 | 1,500 ₹77,40,000 | 1,327 ₹68,47,320 | 951 ₹49,07,160 Lowest | 1,350 ₹69,66,000 | 975 ₹50,31,000 | 1,239 ₹63,93,240 |
| 4.00 | Kota stone slab flooring over 20 mm (average) thick base laid over and Rjointed with grey cement including rubbing and polishing complete with base of cement cement mortar 1:4 (1 cement : 4 coarse sand) (with old kota stone available at site).
Note: The joints in kota flooring shall be provided with mix 1:1/2:2 (1 cemet: 1/2 coarse sand: 2 stone chipping 10 mm nominal size). Which shall be paid separetly. | 2,100 | sqm | 500 ₹10,50,000 | 600 ₹12,60,000 | 950 ₹19,95,000 | 427 ₹8,96,700 Lowest | 1,008 ₹21,16,800 | 700 ₹14,70,000 | 600 ₹12,60,000 | 645 ₹13,54,500 |
| 5.00 | Raising of brick masonary gully chambers of size 500 mm x450 mm including cement plaster with replacement of cover and frame complete in all respect as per direction of engineer incharge | 100 | each | 1,200 ₹1,20,000 | 1,000 ₹1,00,000 | 3,600 ₹3,60,000 | 997 ₹99,700 | 200 ₹20,000 Lowest | 3,500 ₹3,50,000 | 1,000 ₹1,00,000 | 1,802 ₹1,80,200 |
| 6.00 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 420 | cum | 80 ₹33,600 Lowest | 90 ₹37,800 | 500 ₹2,10,000 | 247 ₹1,03,740 | 200 ₹84,000 | 150 ₹63,000 | 150 ₹63,000 | 124.1 ₹52,122 |
| 7.00 | Providing 20 mm wide joints in kota stone flooring with mix 1:1/2:2 (1 cemet: 1/2 coarse sand: 2 stone chipping 10 mm nominal size) including scrubbing , grinding, washing and rubbing the joints all complete as per directon of engineer in charge. | 7,000 | sqm | 90 ₹6,30,000 | 400 ₹28,00,000 | 100 ₹7,00,000 | 37 ₹2,59,000 | 9.51 ₹66,570 Lowest | 10 ₹70,000 | 200 ₹14,00,000 | 250 ₹17,50,000 |
| 8.00Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. | |||||||||||
Tender Value
₹1.3 Cr
EMD Value
₹2.7 L
Closing Date
25 Jul 2023, 2:30 pmClosed
SECRETARY APMC KESHOPUR
APMC KESHOPUR
Kota Stone Flooring on the Platform of Whole Seller Shops including Improvement of Water Supply Line and Drainage at F and V Market Keshopur.
2023_DAMB_244506_1
25(6)/19/2022/DAMB/ENGG
Open Tender
Civil Works
Works
120 days
F and v keshopur
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹2.7 L
6 Sept 2023
14 Jul 2023
25 Jul 2023
14 Jul 2023
25 Jul 2023
14 Jul 2023
Amount
Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:
1:5:10 (1 cement: 5 fine sand: 10 graded stone aggregate 40 mm nominal size)
Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement including rubbing and polishing complete with base of cement cement mortar 1:4 (1 cement: 4 coarse sand) Note: The joints in kota flooring shall be provided with mix 1:1/2:2 (1 cemet: 1/2 coarse sand : 2 stone chipping 10 mm nominal size). Which shall be paid separetly.
25 mm thick
Kota stone slab flooring over 20 mm (average) thick base laid over and Rjointed with grey cement including rubbing and polishing complete with base of cement cement mortar 1:4 (1 cement : 4 coarse sand) (with old kota stone available at site). Note: The joints in kota flooring shall be provided with mix 1:1/2:2 (1 cemet: 1/2 coarse sand: 2 stone chipping 10 mm nominal size). Which shall be paid separetly.
Raising of brick masonary gully chambers of size 500 mm x450 mm including cement plaster with replacement of cover and frame complete in all respect as per direction of engineer incharge
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Providing 20 mm wide joints in kota stone flooring with mix 1:1/2:2 (1 cemet: 1/2 coarse sand: 2 stone chipping 10 mm nominal size) including scrubbing , grinding, washing and rubbing the joints all complete as per directon of engineer in charge.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge.
15 mm nominal outer dia Pipes
25 mm nominal outer dia Pipes
32 mm nominal outer dia Pipes
50 mm nominal outer dia Pipes
PVC blind pipe 150 mm dia as per IS: 12818
Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :
32 mm nominal bore.
25 mm nominal bore
50 mm nominal bore
Providing and fixing brass stop cock of approved quality:
15 mm nominal bore
RAHUL BUILDERS
K. S. BUILDERS
sanu const. co.
J D Associates
M/s. Dua Const. Co.
Sabur Alam
MODERN CONCEPT CONSTRUCTIONS
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_318994.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .