| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.8 CrAccepted-AOC | ₹64.8 Cr Quoted ₹65.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹66.1 CrRejected-Finance YOGESHWARI NAGARI RING ROAD AMBAJOGAI | AMBAJOGAI | BEED | MAHARASHTRA | ₹66.1 Cr | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical OFFICE NO 515 PLOT NO 194 NMS ICON SECTOR 19 ULWE NAVI MUMBAI MAHARASHTRA 410206 | NAVI MUMBAI | THANE | MAHARASHTRA | 410206 | - | - | Rejected-Technical Reject |
| 4 | Rejected-Technical | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | K H CONSTRUCTION L1 | Vinayak Construction Ambajogai L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 18,010 | Per Square Meter | 22 ₹4.0 L | 13.07 ₹2.4 L |
| 2.00 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 940.23 | Per Cubic Meter | 340 ₹3.2 L | 225.51 ₹2.1 L |
| 3.00 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means | 3,479.37 | Per Cubic Meter | 400 ₹13.9 L | 247.3 ₹8.6 L |
| 4.00 | Excavation for foundation in hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 to 3.0m) By Mechanical Means | 4,455.78 | Per Cubic Meter | 720 ₹32.1 L | 451.01 ₹20.1 L |
| 5.00 | Transporting materials obtained from road cutting / Excavation including all lifts, laying in layers of 20cm to 30cm. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density inclusive from the site of excavation to the site of deposition as directed by engineer in charge. | 3,937.68 | Per Cubic Meter | 620 ₹24.4 L | 510.5 ₹20.1 L |
| 6.00 | Filling in plinth and floors with approved excavated material in 15cm. to 20cm. Layers including watering and compacting etc. complete. | 2,380.54 | Per Cubic Meter | 270 ₹6.4 L | 130.73 ₹3.1 L |
| 7.00 | Filling in plinth and floors with contractors material/brought from outside and approved by Engineer incharge in layers of 15 cm to 20 cm including watering and compaction etc. complete. | 857.28 | Per Cubic Meter | 1,500 ₹12.9 L | 1,064.88 ₹9.1 L |
| 8.00 | Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with Crushed sand/grit, ramming, watering etc. complete. | 643.02 | Per Cubic Meter | 2,132.27 ₹13.7 L | 2,174.92 ₹14.0 L |
| 9.00 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper. | 6,635.18 | Per Square Meter | 270 ₹17.9 L | 116.57 ₹7.7 L |
| 10.00 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) treatment by treating the backfill in immediate contact with foundation at the rate of 5 litres of emulsion concentrate of 1.0 percent of clorophyrifos per One Square Metre of vertical surface area covering 10 years guarantee on bond paper. | 4,034.01 | Per Square Meter | 400 ₹16.1 L | 122.01 ₹4.9 L |
Tender Value
₹62.2 Cr
EMD Value
₹31.2 L
Closing Date
18 Jul 2025, 6:00 pmClosed
EXECUTIVE ENGINEER W B P DIV CHH. SAMBHAJINAGAR
EXECUTIVE ENGINEER W B P DIV CHH. SAMBHAJINAGAR
CONSTRUCTION OF ADMIN BUILDING FOR VARIOUS OFFICES OF PUBLIC WORKS DEPARTMENT AT TQ. AND DIST CHHATRAPATI SAMBHAJINAGAR
2025_PWR_1197015_1
E-TENDER NOTICE NO 01 FOR 2025-26 RECALL
Open Tender
Civil Works
730 days
CHHATRAPATI SAMBHAJINAGAR
CONSTRUCTION OF ADMIN BUILDING FOR VARIOUS OFFICES OF PUBLIC WORKS DEPARTMENT AT TQ. AND DIST CHHATRAPATI SAMBHAJINAGAR
3 documents required · 3 mandatory
₹3,540
₹31.2 L
CHIEF ENGINEER P W REGION CHH. SAMBHAJINAGAR
17 Nov 2025
3 Jul 2025
21 Jul 2025
3 Jul 2025
18 Jul 2025
3 Jul 2025
3 Jul 2025 - 9 Jul 2025
9 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid