| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86.9 LAdmitted-Finance NALA PAR VINOD KUMAR GALI NO 1 NALAPAR EAST SAGARPUR SAGARPUR SOUTH WEST DELHI DELHI 110046 | NEW DELHI | DELHI | 110046 | L1 | Admitted-Finance | |
| 2 | L2₹93.3 L+₹6.5 L (7.46%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical Not Qualified as per PQC |
| Sl No | Description | Qty | Unit | PAYAL LIFTING INDUSTRIES L1 | Crown Industry L2 |
|---|---|---|---|---|---|
| 1.01 | a) Design, manufacture/ Fabrication, supply, erection & Mobilization of 10 Ton Capacity Electric Winch Machine/ Crane at site for Inspection of Spillway & piers. Total boom length not less than 12 Mtr & Lift 100 Mtr. Wire rope not less than 16 mm Non Rotated galvanized 35x5/ 19x5 with Cage and support Structure with all Passenger safety systems. (VVVFD, Rotary Limit Switch, Manual Hand Brakes, Speed Sensor, Lift Speed Dual, Pendant & Radio Remote Control, wireless walky-talky etc. b) Design, manufacture/Fabrication of M.S. IS: 2062, Inspection Cage (Weight approx 1 Ton with load Carrying capacity not less than 5 Ton) Suitable for Inspection of Spillway & piers. Inspection cage should have provision of all necessary Safety features as per IS Standard-15785, 800, 807, 3177. Cage should have provision of fixing itself on the spillway by mean of suitable vacuum suction cups/any other means having load carrying capacity not less than 3 Ton. C) Erection, testing and commissioning of electrical winch machine at Rihand Dam site in the supervision of Engineer in Charge Complete in all Respect. | 1 | Job | 59,71,180 ₹70,45,992 Lowest | 61,53,460 ₹72,61,082 |
| 1.05 | Erection, testing and commissioning of above supplied 10 ton electrical winch machine at Rihand dam site as per requirement that shall comprise of 14 Nos. setup on spillway portion (from t to 7) dam outer site and 28 Nos. setups on the both side of the dam on piers covering all required area. Job shall interalia includes mobilization, dismantling and shifting of super structure (14 + 28 = 42 times) as per instruction of engineer in charge. | 1 | Job | 13,89,700 ₹16,39,846 Lowest | 17,56,340 ₹20,72,481 |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
23 Jan 2021, 5:00 pmClosed
EE EGD PIPRI
OFFICE OF THE EE EGD PIPRI
Design, Manufacture, Fabrication, Supply, Erection and Mobilization of 10 ton capacity Electric Winch machine or crane along with requisite infrastructure and other arrangements necessary for inspection of Spillway and Piers of Rihand Dam at Rihand P
2021_UPJVN_544406_1
T11/EGD/2020-21
Open Tender
Miscellaneous Works
Item Rate
30 days
EE EGD PIPRI
AS PER PQC
3 documents required · 3 mandatory
₹3,540
EEEGD U.P.JAL VIDYUT NIGAM
₹1.5 L
27 Jan 2021
8 Jan 2021
25 Jan 2021
8 Jan 2021
23 Jan 2021
8 Jan 2021
a) Design, manufacture/ Fabrication, supply, erection & Mobilization of 10 Ton Capacity Electric Winch Machine/ Crane at site for Inspection of Spillway & piers. Total boom length not less than 12 Mtr & Lift 100 Mtr. Wire rope not less than 16 mm Non Rotated galvanized 35x5/ 19x5 with Cage and support Structure with all Passenger safety systems. (VVVFD, Rotary Limit Switch, Manual Hand Brakes, Speed Sensor, Lift Speed Dual, Pendant & Radio Remote Control, wireless walky-talky etc. b) Design, manufacture/Fabrication of M.S. IS: 2062, Inspection Cage (Weight approx 1 Ton with load Carrying capacity not less than 5 Ton) Suitable for Inspection of Spillway & piers. Inspection cage should have provision of all necessary Safety features as per IS Standard-15785, 800, 807, 3177. Cage should have provision of fixing itself on the spillway by mean of suitable vacuum suction cups/any other means having load carrying capacity not less than 3 Ton. C) Erection, testing and commissioning of electrical winch machine at Rihand Dam site in the supervision of Engineer in Charge Complete in all Respect.
Erection, testing and commissioning of above supplied 10 ton electrical winch machine at Rihand dam site as per requirement that shall comprise of 14 Nos. setup on spillway portion (from t to 7) dam outer site and 28 Nos. setups on the both side of the dam on piers covering all required area. Job shall interalia includes mobilization, dismantling and shifting of super structure (14 + 28 = 42 times) as per instruction of engineer in charge.
Crown Industry
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .