Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.5 LAccepted-AOC ATLANTIS A2 1501 PLOT NO 05 SECTOR 11 NEAR CLOUD 36 GHANSOLI NAVI MUMBAI 400 701 E 97 CWE SUBS BHANDUP | THANE | MAHARASHTRA | 400701 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹24.1 L+₹3.6 L (17.8%)Rejected-Finance | L2 | Rejected-Finance Higher amount quoted | |
| 3 | L3₹25.1 L+₹4.6 L (22.5%)Rejected-Finance | L3 | Rejected-Finance Higher amount quoted | |
| 4 | L4₹25.1 L+₹4.6 L (22.7%)Rejected-Finance PLOT NO 14 SHIV COLONY KATI GHATI RAJGARH ROAD ALWER RAJ | ALWAR | ALWAR | RAJASTHAN | L4 | Rejected-Finance Higher amount quoted | |
| 5 | L5₹25.8 L+₹5.3 L (26.1%)Rejected-Finance | L5 | Rejected-Finance Higher amount quoted |
Tender Value
Refer Docs
EMD Value
₹64,380
Closing Date
20 May 2021, 5:00 pmClosed
CWE (A) Jaisalmer
CWE (A) Jaisalmer
OUTSOURCING THE RESOURCES FOR MAINTENANCE AND OPERATION OF WATER SUPPLY INSTALLATION AT DABLA UNDER GE (A) JAISALMER
2021_MES_437830_1
83941
Open Tender
Electrical and Maintenance Works
Works
333 days
GE (A) Jaisalmer
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
GE (A) JAISALMER
₹64,380
Yes
9 Jul 2021
22 Apr 2021
22 May 2021
22 Apr 2021
20 May 2021
6 May 2021
Amount
Outsourcing of services for Operation and Maintenance of Main Water Supply Installation at Dabla on all working days (including Sunday/Holiday) by deploying Skilled operator (PHO/FGM) in three shift (round the clock) to operate electrically driven 3 phase, 50 Hz,AC water supply pumping system along with control of all mechanical device such as sluice valve/butter fly valve,footvalve and NRV etc including keeping the installation operational in healthy condition including carrying out all daily maintenance all as directed by Engineer-in-charge & as per Indian electricity rules/ Engineering practices & maintaining properly the protective instruments complete in good condition and all maintenance records, break down records by providing with adequate staff all as specified in particular specifications to the entire satisfaction of Engineer-in-charge. The installation to be operated as per under mentioned shift or as directed by the Engr-in-charge. (a) First Shift - 0600 Hrs to 1400 Hrs. (b) Second Shift - 1400 Hrs to 2200 Hrs. (c) Third Shift - 2200Hr to 0600 Hrs.
The details of Main water supply installationsat Dabla are as under: - (a) Centrifugual pump set 75 HP complete with motor and pump - 03 Nos. (b) Centrifugual pump set 60 HP complete with motor and pump - 03 Nos (c) Star Delta starter - 06 Nos (d) Electric control panel board -06 Nos. (e) Diesel engine Driven generating set 250 KVA - 01 No. (f) Electric control panel board with change over switch - 01 No. (g) Fuel tank 02 Nos. (h) Centrifugal pump set 60 HP - 02 Nos (j) Diesel engine driven generating set 125 KVA - 01 No
Outsourcing of Services for Operation and Maintenance of Borewell installation(Near New Tower No 2,3 and 4) at Dabla on all working days (including Sunday/Holiday) by deploying Skilled Operator (PHO/FGM) in two shift to operate electrically driven 3 phase, 50 Hz,AC water supply pumping system along with control of all mechanical device such as sluice valve/butter fly valve,footvalve and NRV etc including keeping the installation operational in healthy condition including carrying out all daily maintenance all as directed by Engineer-in-charge & as per Indian electricity rules/ Engineering practices & maintaining properly the protective instruments complete in good condition and all maintenance records, break down records by providing with adequate staff all as specified in particular specifications to the entire satisfaction of Engineer-in-charge. The installation to be operated as per under mentioned shift or as directed by the Engr-in-charge. (a) First Shift - 1400 Hrs to 2200 Hrs. (b) Second Shift - 2200 Hrs to 0600 Hrs.
The details of Borewell installations are as under: - (a) Submersible pump set 3 Phase 415 Volt, AC 33 HP/20 HP capacity - 03 Nos (b) Star Delta starter - 03 Nos (c) Submersible cable 3 Phase - 1000 RM (d) Column pipe with fittings (e) Electric control panel - 03 Nos (f) Electric control panel board with change over switch - 01 No. (g) Tube wells including Submersible pump set - 01 No. (MAP) (h) Diesel engine driven generating set 160 KVA - 01 No (j) Fuel tank - 01 No
Outsourcing of services for Operation and Maintenance of Borewell installation New Twer No 4,5 and Old Tower No 7 at Dabla on all working days (including Sunday/Holiday) by deploying Skilled Operator (PHO/FGM) in two shift to operate electrically driven 3 phase, 50 Hz,AC water supply pumping system along with control of all mechanical device such as sluice valve/butter fly valve,footvalve and NRV etc including keeping the installation operational in healthy condition including carrying out all daily maintenance all as directed by Engineer-in-charge & as per Indian electricity rules/ Engineering practices & maintaining properly the protective instruments complete in good condition and all maintenance records, break down records by providing with adequate staff all as specified in particular specifications to the entire satisfaction of Engineer-in-charge. The installation to be operated as per under mentioned shift or as directed by the Engr-in-charge. (a) First Shift - 1400 Hrs to 2200 Hrs. (b) Second Shift - 2200 Hrs to 0600 Hrs.
The details of Borewell installations are as under: - (a) Submersible pump set 3 Phase 415 Volt, AC 33/20 HP capacity - 03 Nos (b) Star Delta starter - 03 Nos (c) Submersible cable 3 Phase - 1000 RM (d) Column pipe with fittings (e) Electric control panel - 03 Nos (f) Electric control panel board with change over switch 02 Nos. (g) Diesel engine driven generating set 100 KVA - 01 No.and 63 KVA - 01 No. (h) Fuel tank - 02 No.
Outsourcing of services for Operation and Maintenance of Borewell installation New Tower No 6 and 7 at Dabla on all working days (including Sunday/Holiday) by deploying Skilled Operator (PHO/FGM) in two shift to operate electrically driven 3 phase, 50 Hz,AC water supply pumping system along with control of all mechanical device such as sluice valve/butter fly valve,footvalve and NRV etc including keeping the installation operational in healthy condition including carrying out all daily maintenance all as directed by Engineer-in-charge & as per Indian electricity rules/ Engineering practices & maintaining properly the protective instruments complete in good condition and all maintenance records, break down records by providing with adequate staff all as specified in particular specifications to the entire satisfaction of Engineer-in-charge. The installation to be operated as per under mentioned shift or as directed by the Engr-in-charge. (a) First Shift - 1400 Hrs to 2200 Hrs. (b) Second Shift - 2200 Hrs to 0600 Hrs.
The details of Borewell installations are as under: - (a) Submersible pump set 3 Phase 415 Volt, AC 33 HP/20 HP capacity - 03 Nos (b) Star Delta starter - 03 Nos (c) Submersible cable 3 Phase - 750 RM (d) Column pipe with fittings (e) Electric control panel - 03 Nos (f) Electric control panel board with change over switch 01 No.
Outsourcing of services for Operation and Maintenance of Borewell installation New Tower No 8 and 10 at Dabla on all working days (including Sunday/Holiday) by deploying Skilled Operator (PHO/FGM) in two shift to operate electrically driven 3 phase, 50 Hz,AC water supply pumping system along with control of all mechanical device such as sluice valve/butter fly valve,footvalve and NRV etc including keeping the installation operational in healthy condition including carrying out all daily maintenance all as directed by Engineer-in-charge & as per Indian electricity rules/ Engineering practices & maintaining properly the protective instruments complete in good condition and all maintenance records, break down records by providing with adequate staff all as specified in particular specifications to the entire satisfaction of Engineer-in-charge. The installation to be operated as per under mentioned shift or as directed by the Engr-in-charge. (a) First Shift - 1400 Hrs to 2200 Hrs. (b) Second Shift - 2200 Hrs to 0600 Hrs.
The details of Borewell installations are as under: - (a) Submersible pump set 3 Phase 415 Volt, AC 33 HP/20 HP capacity - 03 Nos (b) Star Delta starter - 03 Nos (c) Submersible cable 3 Phase - 1000 RM (d) Column pipe with fittings (e) Electric control panel - 03 Nos (f) Electric control panel board with change over switch 01 No. (g) Diesel engine driven generating set 125 KVA - 01 No. (h) Fuel tank - 01 No.
Notes for Ser item Nos 1 to 5: (i) Wage paid by the contractor to the persons employed shall not be less than the minimum wages fixed by State/Central Government from time to time whichever is higher. The payment shall be made to the workers through NEFT to adhaar linked bank account of M&O employees/ staff and the bank statement of fair wages as per minimum labour wages as mentioned above shall be submitted along with the RARs/FB for payments. (ii)The contractor shall be responsible for the EPF, ESI, bonus, Safety etc. and insurance of all trademen employed by him as per existing Labour Rules/Acts/Regulations (iii) Contractor special attention is invited that payment of operator / labour shall be made only through Account payee cheque/NEFT and same shall be deposited in Adhar link account of operator / labour. Documentary evidence for the same shall be submitted to Engineer -in-Charge before payment of RAR / Final bill. (iv) Necessary weekly off will be given to manpower employed for this schedule as per existing rules and regulation of state /central govt. and necessary replacement will be provided by the contractor. Rates quoted for this schedule shall deemed to be included this provision.
(v) In case absence of any operator / workmen from any shift will be penalized with a penalty of double the rate quoted by the contractor in addition to the shift not taken in to consideration for payment. Attendant / Operator wanting leave will get it sanctioned before proceeding on leave along with the name of individual who will be performing his duty/shift in his absence. No replacement of operator/workmen without the knowledge of department will be allowed. (vi) Safety equipment's, tools and first aid kit will be provided to all tradesman without any extra cost to government. (vii) Log Sheet, Muster roll, attendance register shall be maintained by operator and get it signed by contractor on daily basis. (viii) The contractor shall closed the installation properly with lock and key before leaving the installation. Contractor shall be held responsible for any theft or loss at the installation. Contractor shall make sure to have everything in installation under lock and key.
M/S SHRI HARI CONSTRUCTION COMPANY
JAI ENGINEERING COMPANY
M/s Yash Electrical and Maintenance
SS SODHA ENTERPRISES
M/s godara infratech and power industries
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .