| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.1 LAccepted-Finance | ₹72.1 L | L1 | Accepted-Finance ACCEPTED |
| 2 | L2₹72.7 LAccepted-Finance | ₹72.7 L | L2 | Accepted-Finance ACCEPTED |
Tender Value
₹86.1 L
EMD Value
₹1.7 L
Closing Date
22 Jul 2026, 12:30 pmClosed
RAJNEESH KUMAR
OFFICE OF THE SE RED CTK VIKASH BHAWAN BANDA
Interlocking road construction work from Ramgopals house to Kanpur Sagar Highway in village Basora, development block Kabrai, district Mahoba.
2026_REDUP_1168060_6
93/RED/Tender File/2026-27 DATE- 07.07.2026
Open Tender
Civil Works - Roads
Percentage
180 days
Interlocking road construction work from Ramgopals
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹1.7 L
Yes
OFFICE OF THE SE RED CTK VIKASH BHAWAN BANDA
24 Aug 2026
15 Jul 2026
23 Jul 2026
15 Jul 2026
22 Jul 2026
15 Jul 2026
15 Jul 2026 - 22 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work In Cutting or in embenkment in moorum or soil mixed with kankar or gravel.excacation to be in the form of Reguler pits not exceeding 1/2 meter in depth and e/w in embankment to be in 20 cm layers including ramming and dressing the surface to required levels and slopes and also incuding 1.50 meter lifts and 30 m lead. The earth form cutting to be used in making embankment or to be deposited as soil banks within 30.00 meters distance as directed by the Engineer in Charge. PWD Schedule Item No. 253 (a) | 704.7 | cum | 276.74 | ₹1,95,018.68 |
| 2 | Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 1000 meter as per MORD technical specification clause 301.5 MORD sepecification 301.5(i) S.No. 3.4(Ordinary soil) | 1,452 | cum | 82.94 | ₹1,20,428.88 |
| 3 | Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. | 640.89 | cum | 902.42 | ₹5,78,351.95 |
| 4 | GSB
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 222.75 | cum | 1,722.35 | ₹3,83,653.46 |
| 5 | G-3
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Machenical Means | 154.69 | cum | 2,147 | ₹3,32,119.43 |
| 6 | Provinding and laying of Rubble moulded Zig Zag Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. | 2,062.5 | SQM | 798 | ₹16,45,875 |
| 7 | Earth work in excavation in Foundation in ordanary soil Lead up to 30 m and lift up to 1.50 m I/C all complete as per directed by Engineer in charge.SI no. 251 | 63.25 | cum | 114 | ₹7,210.5 |
| 8 | Sand filling in foundation for stabilization of foundation earth I/C all complete as per directed by Engineer in charge.SI no. 255 | 18.98 | cum | 950 | ₹18,031 |
| 9 | Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 12:6:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. As per SI No. 273 | 18.98 | cum | 3,420 | ₹64,911.6 |
| 10 | Brick work with class M-150 bricks in sand & cement mortar in proportion of 4:1in foundation and plinth I/c supply of all material ,labour ,T&P etc required for proper completion of work all complete as S.I. No. 305 | 75.9 | cum | 5,225 | ₹3,96,577.5 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.35 MB
BOQ_2190934.xls
BOQ • 0.33 MB
6.pdf
Tender Documents • 19.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].