Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹47.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹47.7 L+₹11,990.04 (0.25%)Admitted-Fee/PreQual/Technical/Finance | ₹47.7 L+₹11,990.04 (0.25%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | P Sampath L2 | GPRS Constructions L1 |
|---|---|---|---|---|---|
| 1.01Construction of a Community Hall Building @ Paraiyanthangal Panchayat | |||||
| 1.02 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 91.8 | Cum | 263.25 ₹24,166.35 | 262.46 ₹24,093.83 Lowest |
| 1.03 | Supplying and filling in foundation and basement with good sand in layers not more 15 cm thick including ramming, watering and compacting etc.complete complying to standard specification | 53.52 | Cum | 2,169.4 ₹1,16,106.29 | 2,162.88 ₹1,15,757.34 Lowest |
| 1.04 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed. | 36.29 | Cum | 6,025.98 ₹2,18,682.81 | 6,007.87 ₹2,18,025.6 Lowest |
| 1.05 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications. | 74.1 | Cum | 6,243.84 ₹4,62,668.54 | 6,225.07 ₹4,61,277.69 Lowest |
| 1.06 | Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification. | 7.32 | Cum | 91,711.51 ₹6,71,603.39 | 91,435.82 ₹6,69,584.51 Lowest |
| 1.07 | Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels, | 434.96 | Sqm | 1,092.81 ₹4,75,328.64 | 1,089.53 ₹4,73,901.97 Lowest |
| 1.08 | Rainforcement Cement Concrete 1:1½:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or roof s | 16.34 | Cum | 9,911.75 ₹1,61,957.99 | 9,881.95 ₹1,61,471.06 Lowest |
| 1.09 | Super Structure | 36.81 | Cum | 10,052.53 ₹3,70,033.63 | 10,022.32 ₹3,68,921.6 Lowest |
| 1.10 | Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. | 129.81 | Cum | 1,511.96 ₹1,96,267.53 | 1,507.42 ₹1,95,678.19 Lowest |
Tender Value
Refer Docs
EMD Value
₹48,200
Closing Date
12 Sept 2026, 3:00 pmClosed
ZY-DY-BDO
Melmalayanur
Parayanthangal - community hall
2026_RDTN_699036_1
Parayanthangal - community hall
Open Tender
Civil Works
Works
120 days
Parayanthangal
Community Hall
3 documents required · 3 mandatory
₹0
₹48,200
Yes
12 Sept 2026
28 Aug 2026
12 Sept 2026
28 Aug 2026
12 Sept 2026
28 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Construction of a Community Hall Building @ Paraiyanthangal Panchayat | - | - | - | - |
| 1.02 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 1 | Cum | 263.78 | ₹263.52 |
| 1.03 | Supplying and filling in foundation and basement with good sand in layers not more 15 cm thick including ramming, watering and compacting etc.complete complying to standard specification | - | Cum | 2,173.75 | - |
| 1.04 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed. | 1 | Cum | 6,038.06 | ₹6,032.02 |
| 1.05 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications. | 1 | Cum | 6,256.35 | ₹6,250.09 |
| 1.06 | Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification. | - | Cum | 91,895.3 | - |
| 1.07 | Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels, | 1 | Sqm | 1,095 | ₹1,093.91 |
| 1.08 | Rainforcement Cement Concrete 1:1½:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or roof s | 1 | Cum | 9,931.61 | ₹9,921.68 |
| 1.09 | Super Structure | - | Cum | 10,072.68 | - |
| 1.1 | Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. | - | Cum | 1,514.99 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Notice.pdf
Tender Documents • 0.22 MB
BOQ_840330.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .