Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹38.1 LAdmitted-Finance | +33.79% | ₹38.1 L | L1 | Admitted-Finance |
Tender Value
₹28.4 L
EMD Value
₹56,900
Closing Date
10 Jun 2026, 2:00 pmClosed
SECRETARY
uit alwar
Construction of Rain Water Harvesting system in Dry Borings in Alwar.
2026_UITAL_564557_13
NIT05/2026-27/
Open Tender
Civil Works
Percentage
90 days
UIT ALWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Secretary, UIT
₹56,900
Yes
12 Jun 2026
5 Jun 2026
10 Jun 2026
5 Jun 2026
10 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Structures | - | - | - | - |
| - | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per MoRTH Specification Clause 202. | - | - | - | - |
| - | By Manual Means | - | - | - | - |
| - | Cement Concrete | 50 | Cum | 305 | ₹15,250 |
| 2 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 250 | Cum | 178 | ₹44,500 |
| 3 | Carriage of earth, sand, lime, morrum, manure or sludge including loading/ unloading etc. complete with lead upto 15km. | 375 | Cum | 94.3 | ₹35,362.5 |
| 4 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 25 | Cum | 3,302 | ₹82,550 |
| 5 | Brick masonry with F.P.S. bricks of class designation 75 in foundation and plinth with bricks | - | - | - | - |
| - | Cement mortar 1 : 4 (1 cement : 4 coarse sand) | 125 | Cum | 4,469 | ₹5,58,625 |
| 6 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. | - | - | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
Tendernotice_2.pdf
PDF • 0.22 MB
BOQ_1005784.xls
BOQ • 0.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].