| 1 | L1₹58.1 LAdmitted-Finance | ₹58.1 L | L1 | Admitted-Finance |
| 2 | L2₹62.0 LAdmitted-Finance 1 GANESH DARSHAN ADV SURVE MARG SANDHURST ROAD W MUMBAI 9 | MUMBAI | MAHARASHTRA | ₹62.0 L | L2 | Admitted-Finance |
| 3 | L3₹62.3 LAdmitted-Finance | ₹62.3 L | L3 | Admitted-Finance |
| 4 | L4₹63.8 LAdmitted-Finance VOLTAS HOUSE B 2ND FLOOR T B KADAM MARG CHINCHPOKLI MUMBAI 400 033 | MUMBAI | MUMBAI | MAHARASHTRA | 400033 | ₹63.8 L | L4 | Admitted-Finance |
| 5 | L5₹78.1 LAdmitted-Finance 53 VAISHAILI ENCLAVE SECTOR 9 INDIRA NAGAR LUCKNOW | LUCKNOW | ₹78.1 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | TEMPCON ELECTROMECH SYSTEMS L3 | SPEEDFROST SERVICES PVT LTD L2 | VSAVE ELECTRONICS PRIVATE LIMITED L1 | KRISHNA REFRIGERATION L5 | VOLTALIMITED L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Operation of Air Conditioning System, chilled water booster Pumps, kitchen ventilation system, fire pumps, solar water heating system, and other mechanical system for 24 months as technical specification. | 24 | Per Month | 1,20,000 ₹28.8 L | 85,000 ₹20.4 L | 2,32,814 ₹55.9 L | 1,55,477.45 ₹37.3 L | 1,76,430 ₹42.3 L |
| 2.00 | Quarterly maintenance & (breakdown maintenance if any) of AHUs (3 nos) of flow capacity from 30000 to 35000 CFM, 60 to 70 TR as technical specification. | 24 | Nos | 4,000 ₹96,000 | 4,600 ₹1.1 L | 200 ₹4,800 | 6,562.5 ₹1.6 L | 1,010 ₹24,240 |
| 3.00 | Quarterly maintenance & (breakdown maintenance if any) of AHUs (3 nos) of flow capacity from 23000 to 25000 CFM, 55 TR to 59 TR as per technical specification | 24 | Nos | 3,250 ₹78,000 | 4,500 ₹1.1 L | 200 ₹4,800 | 4,687.5 ₹1.1 L | 885 ₹21,240 |
| 4.00 | Quarterly maintenance & (breakdown maintenance if any) of AHUs (5 nos) of flow capacity from 15000 to 16000 CFM, 35 to 38 TR cooling as per technical specification. | 40 | Nos | 3,000 ₹1.2 L | 4,500 ₹1.8 L | 100 ₹4,000 | 3,000 ₹1.2 L | 568 ₹22,720 |
| 5.00 | Quarterly maintenance & (breakdown maintenance if any) of AHUs (3 nos) of flow capacity from 9000 CFM to 9800 CFM, 20 TR to 24 TR cooling as per technical specification. | 24 | Nos | 2,500 ₹60,000 | 3,500 ₹84,000 | 100 ₹2,400 | 1,837.5 ₹44,100 | 342 ₹8,208 |
| 6.00 | Quarterly maintenance & (breakdown maintenance if any) of AHUs (2 nos) of flow capacity 1500 CFM to 1800 CFM, 05 TR to 6 TR cooling as per technical specification. | 16 | Nos | 2,250 ₹36,000 | 3,000 ₹48,000 | 100 ₹1,600 | 337.5 ₹5,400 | 90 ₹1,440 |
| 7.00 | Quarterly maintenance & (breakdown maintenance if any) of Split AC indoor and condensing units (20 Nos) of 1.5 TR cooling capacity as per technical specification. | 160 | Nos | 600 ₹96,000 | 500 ₹80,000 | 50 ₹8,000 | 562.5 ₹90,000 | 330 ₹52,800 |
| 8.00 | Quarterly maintenance & (breakdown maintenance if any) of Split AC indoor and condensing units (11 Nos) of 2 TR cooling capacity as per technical specification. | 88 | Nos | 900 ₹79,200 | 750 ₹66,000 | 50 ₹4,400 | 750 ₹66,000 | 440 ₹38,720 |
| 9.00 | Quarterly maintenance & (breakdown maintenance if any) of Ductable split AC indoor and condensing units (16 nos) of 3 TR cooling capacity as per technical specification. | 128 | Nos | 2,250 ₹2.9 L | 1,200 ₹1.5 L | 50 ₹6,400 | 1,125 ₹1.4 L | 660 ₹84,480 |
| 10.00 | Quarterly maintenance & (breakdown maintenance if any) of Ductable split AC indoor and condensing units (44 nos) of 2 TR cooling capacity as per technical specification. | 352 | Nos | 1,000 ₹3.5 L | 1,000 ₹3.5 L | 100 ₹35,200 | 750 ₹2.6 L | 440 ₹1.5 L |
Tender Value
₹83.1 L
EMD Value
₹1.7 L
Closing Date
4 Dec 2025, 6:00 pmClosed
Chief Engineer, CSD
Chief Engineer, CSD, BARC, Trombay, Mumbai -85
Operation and Maintenance of low side HVAC services and mechanical utility services of DAE convention centre in Anushaktinagar, Mumbai- 400094 ( For Period of 24 Months)
2025_BARC_886489_1
BARC/CSD/ET/28/2025-2026
Open Tender
Machineries/ Mechanical Engg Items
730 days
DAE COnvention Centre, Anushaktinagar, Mumbai
As Per NIT
3 documents required · 3 mandatory
₹0
₹1.7 L
PG Hostel, Anushaktinagar
12 Dec 2025
21 Nov 2025
5 Dec 2025
21 Nov 2025
4 Dec 2025
21 Nov 2025
21 Nov 2025 - 4 Dec 2025
27 Nov 2025
Amount
Operation of Air Conditioning System, chilled water booster Pumps, kitchen ventilation system, fire pumps, solar water heating system, and other mechanical system for 24 months as technical specification.
Quarterly maintenance & (breakdown maintenance if any) of AHUs (3 nos) of flow capacity from 30000 to 35000 CFM, 60 to 70 TR as technical specification.
Quarterly maintenance & (breakdown maintenance if any) of AHUs (3 nos) of flow capacity from 23000 to 25000 CFM, 55 TR to 59 TR as per technical specification
Quarterly maintenance & (breakdown maintenance if any) of AHUs (5 nos) of flow capacity from 15000 to 16000 CFM, 35 to 38 TR cooling as per technical specification.
Quarterly maintenance & (breakdown maintenance if any) of AHUs (3 nos) of flow capacity from 9000 CFM to 9800 CFM, 20 TR to 24 TR cooling as per technical specification.
Quarterly maintenance & (breakdown maintenance if any) of AHUs (2 nos) of flow capacity 1500 CFM to 1800 CFM, 05 TR to 6 TR cooling as per technical specification.
Quarterly maintenance & (breakdown maintenance if any) of Split AC indoor and condensing units (20 Nos) of 1.5 TR cooling capacity as per technical specification.
Quarterly maintenance & (breakdown maintenance if any) of Split AC indoor and condensing units (11 Nos) of 2 TR cooling capacity as per technical specification.
Quarterly maintenance & (breakdown maintenance if any) of Ductable split AC indoor and condensing units (16 nos) of 3 TR cooling capacity as per technical specification.
Quarterly maintenance & (breakdown maintenance if any) of Ductable split AC indoor and condensing units (44 nos) of 2 TR cooling capacity as per technical specification.
Quarterly maintenance & (breakdown maintenance if any) of Ductable split AC indoor and condensing units (5 nos) of 8 TR cooling capacity as per technical specification.
Quarterly maintenance & (breakdown maintenance if any) of Tower type split AC indoor and condensing units (21 nos) of 3 TR cooling capacity as per technical specification.
Quarterly maintenance & (breakdown maintenance if any) of water cooler units as per technical specification.
Quarterly maintenance & (breakdown maintenance if any) of 4800 LPM to 5000 LPM and 22m to 25 m head pump of Kirloskar make as per technical specification.
Quarterly maintenance & (breakdown maintenance if any) of toilet exhaust fans of following flow capacity upto 700 CFM as per technical specification.
Quarterly maintenance & (breakdown maintenance if any) of Convention Centre Toilet Exhaust Fans of flow capacity of 2 nos fans of from 3600 CFM to 3800 CFM as per technical specification.
Quarterly maintenance & (breakdown maintenance if any) of Kitchen Exhaust Fans of flow capacity of 5 nos fans of 3000 CFM to 3200 CFM as per technical specification.
Quarterly maintenance & (breakdown maintenance if any) of Kitchen Fresh Air Fans of flow capacity 5 nos of 3000 CFM to 3500 CFM as per technical specification.
Quarterly maintenance & (breakdown maintenance if any) of Auditorium –A & B Toilet Exhaust Fans of flow capacity of 2 nos fans of 1000 to 1500 CFM as per technical specification.
Quarterly maintenance & (breakdown maintenance if any) of Deep Fridgers ( Bottle coolers / Combine coolers) as per technical specification.
Servicing /maintenance of Kitchen hood as per technical specification.
SITC of Water Pressure Gauges with Syphon Range 0-10 Kg/cm2 as per technical specification
SITC of Water Temperature Gauges with thermowell Range 0-50 deg C. as per technical specification
Painting of pipe line , supports etc. with synthetic enamel paint as per technical specification.
Supply and installation of M.S support structure as per technical specification.
Supply of gas , gas charging , testing and commissioning of split air conditioner of 1.5 TR & 2 TR as per technical specification.
Supply , installation , testing and commissioning of PCB unit of split air conditioner of 1.5 TR as per technical specification.
Supply , installation , testing and commissioning of PCB unit of split air conditioner of 2 TR as per technical specification.
Supply , installation , testing and commissioning of PCB unit of split air conditioner of 3 TR as per technical specification.
Supply , installation , testing and commissioning of 3 TR cold storage split air conditioner unit as per technical specification.
Supply , installation , testing and commissioning of PI temperature controller for PICC chilled water temperature control valve as per technical specification.
SITC of Fan blade of outdoor unit of window /split AC /cold storage unit as per tender specifications. Capacity up-to 3TR, Make & Model -Existing site as per technical specification.
Supply, installation, testing and commissioning of VFD suitable for 40 hp motor and interconnection cabling between existing starter and VFD as per technical specifications.
Quarterly maintenance & breakdown if any of 2 sets of solar flat plate collectors (2000 X 1000X100mm) - 08 Nos. each (Total 16 nos flat plate collectors) as per technical specifications.
Quarterly maintenance breakdown if any of 9 sets of solar flat plate collectors (2000 X 1000X100mm) - 04 Nos. each (Total 36 nos flat plate collectors) as per technical specifications.
Quarterly maintenance breakdown if any of 2 sets of solar flat plate collectors (2000 X 1000X100mm) - 02 Nos. each (Total 4 nos flat plate collectors) as per technical specifications.
Half Yearly maintenance of department E scooter as per technical specification.
Supply , installation , testing and commissioning of AHU belts as per technical specifications.
Rewinding of motors up to 7.5 KW as per technical specifications.
Quarterly maintenance breakdown if any of control panel of borewell pump as per technical specifications.
Supply , installation , testing and commissioning of 50 mm dia CPVC pipe for garden water system as per technical specifications.
Supply , installation , testing and commissioning of 20 mm dia CPVC pipe for garden water system as per technical specifications.
Supply , installation , testing and commissioning of 20 mm dia PVC valve for garden water pipe outlet as per technical specifications.
Breakdown/repair of borewell submersible pump of max. 5 HP as per technical specifications.
Replacement of filter candle unit of water filter as per technical specifications.
Supply & installation of Pre HDPE air filter with 46 mm thickness for AHUs as per technical specifications..
Excavation in soft soil as per technical specifications.
Supply, installation, testing and commissioning of DN 250 mm butterfly valves wafer type as per technical specifications.
Supply, installation, testing and commissioning of DN 50 mm gate valves as per technical specifications.
Supply, installation, testing and commissioning of DN 25 mm gate valves as per technical specifications.
Installation, testing and commissioning of DN 150 mm dia pipe as per technical specifications.
Installation, testing and commissioning of DN 100 mm dia pipe as per technical specifications.
Installation, testing and commissioning of DN 80 mm dia pipe as per technical specifications.
Installation, testing and commissioning of DN 50 mm dia pipe as per technical specifications.
Installation, testing and commissioning of DN 25 mm dia pipe as per technical specifications.
Supply, installation, testing and commissioning of SS Water Coolers , Capacity -80 ltrs storage capacity as per technical specifications.
Welding of MS joints as per technical specifications.
SPEEDFROST SERVICES PVT LTD (BID ID -3326860)
TEMPCON ELECTROMECH SYSTEMS (BID ID -3326704)
VOLTALIMITED (BID ID -3327754)
KRISHNA REFRIGERATION (BID ID -3327971)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.93 MB
Tendernotice_2.pdf
PDF • 0.53 MB
BOQ_931825.xls
BOQ • 0.25 MB
TECHNICAL_BID_BARC_CSD_ET_28_2025_2026.xls
Additional Documents • 0.30 MB
Tender_document.pdf
Tender Documents • 1.78 MB
Tech_spec.pdf
Additional Documents • 0.71 MB
SCHEDULE_A.pdf
Additional Documents • 0.18 MB
Proforma_of_schedules.pdf
Additional Documents • 0.25 MB
Download all tender documents and submit your bid