Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹39.8 LAccepted-AOC GUWAHATI | KAMRUP | ASSAM | 781030 | ₹39.8 L | L-1 | Accepted-AOC Qualified as L-1 bidder |
| 2 | L-2₹41.2 L+₹1.4 L (3.52%)Rejected-Finance | ₹41.2 L+₹1.4 L (3.52%) | L-2 | Rejected-Finance Financially disqualified |
| 3 | L-3₹41.4 L+₹1.6 L (3.95%)Rejected-Finance | ₹41.4 L+₹1.6 L (3.95%) | L-3 | Rejected-Finance Financially disqualified |
| 4 | L-4₹42.2 L+₹2.3 L (5.85%)Rejected-Finance | ₹42.2 L+₹2.3 L (5.85%) | L-4 | Rejected-Finance Financially disqualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically disqualified |
Tender Value
₹50.0 L
EMD Value
₹99,992
Closing Date
6 Jul 2024, 4:00 pmClosed
Supdt. of Police cum F and ES Adviser Assam
Oo Director of F and ES Assam Panbazar Ghy01
Construction of boulder retaining wall form Siva Temple to barrack No. 5 at RTC, Sila, North Guwahati
2024_FESA_37614_1
eCF No. 502919/1 Dated 13/06/2024
Open Tender
Civil Works - Others
Item Rate
60 days
Regional Training Centre, Sila, North Guwahati
Please refer to the Tender Document
5 documents required · 5 mandatory
₹1,000
₹99,992
Yes
Oo Director of F and ES Assam Panbazar Ghy01
17 Dec 2024
15 Jun 2024
6 Jul 2024
15 Jun 2024
6 Jul 2024
15 Jun 2024
19 Jun 2024
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil.
Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete.
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 4.2.8A 1:5:10 (1 cement : 5 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 10 graded stone aggregate 40mm nominal size Recycled Aggregate (RA)) volume
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : 7.1.1 Cement mortar 1:6 (1 cement : 6 coarse sand)
Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) : 13.33.2 Raised and cut pointing
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.22.1 Mild steel and Medium Tensile steel bars
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.3 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size de rived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for 5.9.1 Foundations, footings, bases of columns, etc. for mass concrete
5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers
5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts
Sri Uday Baishya
M/S DARSHAN
M/S Metro Associates
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .