Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.9 LAccepted-Finance GURGAON | GURUGRAM | HARYANA | 122001 | ₹4.9 L | L-1 | Accepted-Finance Admitted |
| 2 | L-2₹7.1 L+₹2.2 L (43.8%)Accepted-Finance | ₹7.1 L+₹2.2 L (43.8%) | L-2 | Accepted-Finance Admitted |
| 3 | L-3₹8.0 L+₹3.1 L (62.6%)Accepted-Finance | ₹8.0 L+₹3.1 L (62.6%) | L-3 | Accepted-Finance Admitted |
| 4 | Not Admitted-Fee/PreQual/Technical 113 F BLOCK HOUSE NUMBER 113 F BLOCK PANKI KANPUR NAGAR UTTAR PRADESH 208020 | KANPUR NAGAR | UTTAR PRADESH | 208020 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical 257 132 KRISHNA NAGAR KYDGANJ PRAYAGRAJ | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | shiv shankar enterprises | M/S SHEKHAR ENGINEERING WORKS | Globe Tech Solutions Consultancy Pvt Ltd |
|---|---|---|---|---|---|---|
| 1.01 | Detail Survey of 400 KV Anpara-obra S/C line @ LILO Renukoot (Hindalco) including Route alignment, profiling (PLS CAD), preparation of schedule of materials, marking of locations (Route length), identification and explanation of route constraints (Like forest, animal / bird sanctuary, reserve coal belt areas oil pipe line) details available en-route etc. GPS survey of line with co-ordinates of each tower. (The length of line shall be authenticated by GPS survey) | 25 | Kms | 4,00,000 ₹4,72,000 | 4,56,250 ₹5,38,375 | 2,47,250 ₹2,91,755 Lowest |
| 1.02 | Measurement of earth resistivity of proposed 400 KV as per standard practice of UPPTCL. | 1 | Job | 1,00,000 ₹1,18,000 | 1,11,000 ₹1,30,980 | 70,000 ₹82,600 Lowest |
| 1.03 | Preparation of layout 400 KV Substation as per requirement of UPPTCL | 1 | Job | 1,00,000 ₹1,18,000 Lowest | 1,11,000 ₹1,30,980 | 1,00,000 ₹1,18,000 Lowest |
Tender Value
₹5.3 L
EMD Value
₹6,000
Closing Date
14 Aug 2025, 4:00 pmClosed
Superintending Engineer
Electricity Transmission Cirle, UPPTCL, 220 KV S/S Mirzapur
Survey of 400 KV Anpara-Obra SC Line LILO at Proposed 400 KV Switching Substation Renukoot Hindalco, layout and resistivity work of proposed 400 KV Switching Substation under ETD, Robertsganj.
2025_UPTCL_1063365_1
very short term e-tender no 21/2025-26/ETC/Mzp
Open Tender
Electrical Works
Fixed-rate
30 days
Renukoot Sonebhadra
As per tender specification
2 documents required · 2 mandatory
₹590
Superintending Engineer, ETC, Mirzapur
₹6,000
22 Aug 2025
5 Aug 2025
14 Aug 2025
5 Aug 2025
14 Aug 2025
5 Aug 2025
Detail Survey of 400 KV Anpara-obra S/C line @ LILO Renukoot (Hindalco) including Route alignment, profiling (PLS CAD), preparation of schedule of materials, marking of locations (Route length), identification and explanation of route constraints (Like forest, animal / bird sanctuary, reserve coal belt areas oil pipe line) details available en-route etc. GPS survey of line with co-ordinates of each tower. (The length of line shall be authenticated by GPS survey)
Measurement of earth resistivity of proposed 400 KV as per standard practice of UPPTCL.
Preparation of layout 400 KV Substation as per requirement of UPPTCL
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .