Tender Value
₹2.9 L
EMD Value
₹5,800
Closing Date
2 Sept 2026, 4:00 pm5d left
Executive Engineer RnB Division Gurez
Executive Engineer RnB Division Gurez
Construction of Tile Path at Masjid Shareef Khutrin onward Buglinder B Block Tulail
2026_PWDJK_319294_15
(REW) E-NIT No 06 of 2026-27 EE-RnB-Grz-4445-54 E-tendering Dated-03-08-2026
Open Tender
Civil Works
Percentage
30 days
Gurez
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer RnB Division Gurez
₹5,800
Executive Engineer RnB Division Gurez
2 Sept 2026
5 Aug 2026
3 Sept 2026
5 Aug 2026
2 Sept 2026
5 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 24.92 | Cum | 479.3 | ₹11,944.16 |
| 2 | Providing and laying of stone soling hand packed incl. carriages complete. | 12.33 | Cum | 1,200 | ₹14,796 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level.1:4:8 (1Cement: 4 fine sand: 8 graded stone aggregate 40mm nominal Size) | 9.34 | Cum | 5,202.9 | ₹48,595.09 |
| 4 | Centering and shuttering including strutting propping etc. and removal of form work. | 61.34 | Sqm | 286.35 | ₹17,564.71 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level.1:3:6 (1Cement: 3 fine sand: 6 graded stone aggregate 40mm nominal Size) | 7.47 | Cum | 5,733.6 | ₹42,829.99 |
| 5.01 | plums 20 percent | 1.87 | Cum | 1,200 | ₹2,244 |
| 6 | Chequerred precast cement concrete interlocking tiles 50 mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing, cleaning and curing complete on 20mm thick bed of cement mortar of 1:4 mix. Light shade using white cement incl.carriage of tiles complete job | 122.68 | Sqm | 1,100 | ₹1,34,948 |
| 7 | Carriage of different material from nearest source to site of work stone agg for 15 kms. | 15.14 | Cum | 344.49 | ₹5,215.58 |
| 7.01 | Sand from avg 25 Km | 7.56 | Cum | 465.14 | ₹3,516.46 |
| 7.02 | carriage of cement from source to site of work 40 kms | 3.23 | M.T | 560.53 | ₹1,810.51 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_1056949.xls
BOQ • 0.25 MB
Extend3.pdf
PDF • 0.68 MB
Extend2.pdf
PDF • 0.68 MB
Extend2.pdf
PDF • 0.68 MB
Extend.pdf
PDF • 0.67 MB
Extend.pdf
PDF • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].