Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.5 LAdmitted-Fee/PreQual/Technical/Finance | -39.27% | ₹6.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.6 L+₹1.1 L (17.2%)Admitted-Fee/PreQual/Technical/Finance | -28.80% | ₹7.6 L+₹1.1 L (17.2%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹8.9 L+₹2.4 L (36.6%)Admitted-Fee/PreQual/Technical/Finance KALIPAHARI ASANSOL M BURDWAN ASANSOL SOUTH PASCHIM WEST BURDWAN BARDHAMAN PASCHIM WEST BURDWAN BARDHAMAN 713339 WEST BENGAL INDIA | PASCHIM BARDHAMAN | WEST BENGAL | 713339 | -17.07% | ₹8.9 L+₹2.4 L (36.6%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹9.3 L+₹2.9 L (44.1%)Admitted-Fee/PreQual/Technical/Finance | -12.50% | ₹9.3 L+₹2.9 L (44.1%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹12.6 L
EMD Value
₹15,800
Closing Date
7 Sept 2026, 6:00 pmClosed
Area Engineer Civil Satgram-Sripur Area
Office of the Area Engineer Civil, Satgram-Sripur Area, PO-Devchandnagar, WestBengal-713332
Repairing and strengthening of 2 nos of substation building for arrangmet of 11KV 400 amp NLFP V C.B fan 1500 kva Transformer at Bhanora west OCP under Satgram- Sripur Area.
2026_ECL_364696_1
ECL/SSA/GM/AE(C)/e-T/26-27/18 date 01.09.2026
Open Tender
Civil Works - Buildings
Percentage
30 days
Bhanora West OCP
As per NIT
3 documents required · 3 mandatory
₹15,800
8 Sept 2026
1 Sept 2026
8 Sept 2026
2 Sept 2026
7 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 13.69 | Cum | 188.75 | ₹2,583.99 |
| 1.02 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 5.33 | Cum | 1,061.6 | ₹5,658.33 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20 mm nominal size) | 6.44 | Cum | 6,007.2 | ₹38,686.37 |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand(zone-III) : 6 graded stone aggregate 20 mm nominal size). | 1.72 | Cum | 5,434.55 | ₹9,347.43 |
| 1.05 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 6.8 | Cum | 6,903.9 | ₹46,946.52 |
| 1.06 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | 3.33 | Cum | 8,030.65 | ₹26,742.06 |
| 1.07 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 9.73 | Cum | 8,420.4 | ₹81,930.49 |
| 1.08 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 544 | kg | 95.75 | ₹52,088 |
| 1.09 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | 2.65 | Cum | 5,737.7 | ₹15,204.9 |
| 1.1 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand) | 28.72 | Cum | 6,973.6 | ₹2,00,281.79 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.19 MB
Tendernotice_2.pdf
PDF • 0.80 MB
BOQ_377615.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .