| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC NO 2 TOWN HALL COMPLEX PUDUKKOTTAI 622001 | PUDUKKOTTAI | TAMIL NADU | 622001 | ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.5 CrRejected-Finance 47 EZHIL NAGAR PUDUKKOTTAI 622 005 | PUDUKKOTTAI | TAMIL NADU | 622005 | ₹1.5 Cr | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | JPS CONSTRUCTION L2 | K INFRA L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 146.97 | Cum | 94.16 ₹13,838.70 | 88 ₹12,933.36 |
| 2.00 | Cement Concrete of grade M7.5 (1:4:8) (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Hire charges for Tools and plants and incidental charges etc., complete as per relevent standard specification | 146.97 | Cum | 6,432.84 ₹9.5 L | 6,012 ₹8.8 L |
| 3.00 | Vibrated Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for CC Pavement | 819.91 | Cum | 8,072.08 ₹66.2 L | 7,544 ₹61.9 L |
| 4.00 | Providing Granular surface base to the required surface using murram, Granular soil of size varying from 4mm to 75mm including cost of material and cost of labour for stacking, spreading and consolidating layer by layer (Each layer not exceeding 100mm) including hire charges of Roller etc, complete as per the direction of Departmental officers. | 222.65 | Cum | 2,813.03 ₹6.3 L | 2,629 ₹5.9 L |
| 5.00 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 222.65 | Cum | 3,432.56 ₹7.6 L | 3,208 ₹7.1 L |
| 6.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications | 2,968.7 | Sqm | 92.98 ₹2.8 L | 86.9 ₹2.6 L |
| 7.00 | Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications | 2,968.7 | Sqm | 21.4 ₹63,530.18 | 20 ₹59,374 |
| 8.00 | Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications. | 149 | Cum | 12,065.32 ₹18.0 L | 11,276 ₹16.8 L |
| 9.00 | Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications. | 90 | Cum | 12,642.05 ₹11.4 L | 11,815 ₹10.6 L |
Updated dates
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
28 Jan 2026, 3:00 pmClosed
Commissioner Pattukkottai Municipality
Commissioner Pattukkottai Municipality
Pattukkottai Municipality - TURIP - 2025-26 Providing and Earthen to Bitumious Road ,CC Road , Dagamed cc in Kamachinadiu palayam 106001L017 , Aathi st river bund road 1st cross 106002S116 , Aathi st river bund road 2st cross 106002S117 , vandaiya
2026_MAWS_642566_1
Pattukkottai Municipality - 9730/2025/SS1
Open Tender
Civil Works
Pattukkottai municipality
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.4 L
Pattukkottai municipality
10 Apr 2026
12 Jan 2026
28 Jan 2026
12 Jan 2026
28 Jan 2026
14 Jan 2026
14 Jan 2026
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
Cement Concrete of grade M7.5 (1:4:8) (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Hire charges for Tools and plants and incidental charges etc., complete as per relevent standard specification
Vibrated Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for CC Pavement
Providing Granular surface base to the required surface using murram, Granular soil of size varying from 4mm to 75mm including cost of material and cost of labour for stacking, spreading and consolidating layer by layer (Each layer not exceeding 100mm) including hire charges of Roller etc, complete as per the direction of Departmental officers.
Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications
Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications
Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications.
Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
1.pdf
Tender Documents • 0.92 MB
BOQ_769842.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid