Tender Value
₹4.9 L
EMD Value
₹10,000
Closing Date
4 Aug 2026, 2:00 pm
EE TPS
Tallah Pumping Station 71 B.T Road Kolkata-700002
RESTORATION OF 10 MG SUR PROTECTIVE WALL BESIDE THE ENTRANCE ROAD OF CHLORINATION ROOM AT STN 4 UNDER TPS.
2026_KMC_1032035_1
KMC/WS/TPS/08/2026-2027
Open Tender
CIVIL WORKS
Tallah Pumping Station 71 B.T Road Kolkata-700002
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,000
11 Jul 2026
11 Jul 2026
6 Aug 2026
12 Jul 2026
4 Aug 2026
12 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
2. Earth work in excavation of foundation trenches or drains, in all
sorts of soil (including mixed soil but excluding laterite or sandstone)
including removing, spreading or stacking the spoils within a lead of
75 m. as directed. The item includes necessary trimming the sides of
trenches levelling, dressing and ramming the bottom, bailing out
water as required complete. (a) Depth of excavation not exceeding
1,500 mm. | 1 | CUBIC METER PERCENT | 11,927 | ₹11,927 |
| 2 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
4. (A) Filling in foundation or plinth by silver sand in layers not
exceeding 150 mm as directed and consolidating the same by
thorough saturation with water, ramming complete including the cost
of supply of sand. (payment to be made on measurement of finished
quantity) | 1 | CUBIC METER PERCENT | 93,621 | ₹93,620.99 |
| 3 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
3. Earth work in filling in foundation trenches or plinth with good earth,
in layers not exceeding 150 mm. including watering and ramming etc.
layer by layer complete. (Payment to be made on the basis of
measurement of finished quantity of work) (a) With earth obtained
from excavation of foundation. | - | CUBIC METER PERCENT | 7,754 | - |
| 4 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion | - | CUBIC METER | 4,572 | - |
| 5 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc 10?.
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20
mm nominal size) excluding shuttering and reinforcement if any, in
ground floor as per relevant IS codes.(i) Pakur Variety | 1 | CUBIC METER | 4,482 | ₹4,482 |
| 6 | BUILDING WORKS ( C ) Brickworks,Concrete Works
etc.40..Reinforcement for reinforced concrete work in all sorts of
structures including distribution bars, stirrups, binders etc initial
straightening and removal of loose rust (if necessary), cutting to
requisite length, hooking and bending to correct shape, placing in
proper position and binding with 16 gauge black annealed wire at
every intersection, complete as per drawing and direction.(a) For
works in foundation and upto roof of ground floor/upto 4 m.(i) Tor
steel/Mild Steel.I. SAIL/ TATA/RINL. | 0.08 | MATRIC TON | 58,249 | ₹4,659.92 |
| 7 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK
WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (a)
In foundation and plinth | 1 | CUBIC METER | 5,575 | ₹5,575 |
| 8 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc.
A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks
including ramming and dressing bed to proper level and filling joints
with local sand. | - | SQUARE METER | 358 | - |
| 9 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING,
POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor,
ceiling etc.) with sand and cement mortar including rounding off or
chamfering corners as directed and raking out joints including
throating, nosing and drip course, scaffolding/staging where
necessary (Ground floor).[Excluding cost of chipping over concrete
surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster | - | SQUARE METER | 186 | - |
| 10 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING,
POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning
about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement
0.152 cu.m per100 sq.m. | - | SQUARE METER | 34 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_2534259.xls
BOQ • 0.31 MB
tb.pdf
Tender Documents • 0.50 MB
Download all tender documents and submit your bid